Copley. Progress reports to licence expiry/full surrender, for the period 3/3/1976 to 2/3/1977.
No new technical data - activity summaries only. During the start of the period two 3 foot diameter Caldwell drillholes were put down on a Mining Lease at Mountain of Light prospect to bulk sample levels within the upper orebody, down to 102 feet...-
Document
Published: 22 Mar 1977
-
SADM / Amdel Project 1/1/139 : Hydrometallurgy of copper sulphide ores. Progress reports 1 to 3 for the period August 1971 to January 1972.
Literature research has been undertaken by Amdel into the possibility of economically conducting small scale hydrometallurgical processing of local copper sulphide ores. Most of the conventional techniques used elsewhere in the world have only been...-
Document
Published: 24 Jan 1972
-
SADM / Amdel Project 1/1/87 : Investigations into the future utilisation of the Port Pirie uranium plant - feasibility study on the production of magnesia from local magnesite ore. Progress and final reports for the period 20/8/1965 to 30/6/1966.
A study has been made on the feasibility of using magnesite ore mined from BHP leases in the Port Germein Gorge to produce up to 50 tons per day of high grade magnesia (MgO) using the Bicarbonate Process (ref. US Bureau of Mines, 1946) at the...-
Document
-
Yttrium oxide from Port Pirie treatment plant. Progress and final reports for the period 16/9/1966 to July 1967.
There is no abstract created for this record-
Document
Published: 01 Jan 1976
-
Metallurgical testing of Lyndhurst copper ores.
There is no abstract created for this record-
Document
Published: 01 Jan 1973
-
Data release - as updated [made at SA Director of Mines’ discretion] : Tarcoola. Annual reports for the period 2/6/2008 to 29/7/2018.
During the first year of renewed EL 4167, in October and November 2008, Stellar Resources Ltd ("Stellar") completed a 5 hole, 1286.9 m RC and 2 hole, 157.1 m diamond cored inclined drilling programme at the Coolybring prospect which is located...-
Document
Published: 11 Sep 2018
-
Whichelby (part of the Poochera Kaolin Project). Final report at licence expiry/full surrender, for the period 18/9/2012 to 17/9/2022.
The Great White Kaolin Project (previously the Poochera Kaolin Project), until recently, comprised four Exploration Licences operated by Andromeda Industrial Minerals Pty Ltd, namely, EL 6096 Whichelby, EL 6202 Mount Hall, EL 6426 Mount Cooper and EL...-
Document
Published: 03 Dec 2022
-
Data release - as updated : Mount Grainger (part of the Flinders Ranges Diamond Project and the Nackara Arc Gold Project). Combined annual reports and annual reports to licence expiry/full surrender, for the period 6/2/2008 to 5/2/2017.
An area centred ~40 km east of Peterborough in the vicinity of Mount Grainger Goldfield has continued to be explored for possible small diamondiferous kimberlite bodies and for buried economic stratabound, structurally controlled and disseminated...-
Document
Published: 19 Sep 2016