-
Frome Downs. Progress reports and partial relinquishment reports to licence expiry/renewal, for the period 20/6/1978 to 14/9/1982.
153 rotary mud open holes (total 19,689 m) and 11 cored holes (total 1384 m) have been drilled during the reporting period to evaluate the Goulds Dam uranium deposit and to further explore the region to its north and south for sedimentary uranium...-
Document
-
Kalabity. Progress reports to licence expiry/renewal for the period 15/3/1971 to 17/6/1973, plus related technical reports about in situ leach uranium mining methods in Wyoming.
The recently completed drilling of 189 open rotary holes (total penetration 22,427 m), plus the redrilling and geophysical re-logging by joint venturer Minad-Teton of 19 previously completed Carpentaria Exploration Co. uranium exploration holes (for a...-
Document
Published: 02 Jan 1974
-
RB 90/00077 Skeleton 2. Well completion report.
Skeleton 2 penetrated sediments of the eastern Lake Eyre Basin, the Frome Embayment, and granitic basement of the Mount Painter Ridge. The hole records the southernmost known occurrence of Cadna-owie Formation in the Frome Embayment. Unexpectedly,...-
Document
Published: 01 Dec 1990
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-26 - south-western Cooper Basin district - Tertiary sedimentary uranium mineral prospects. Project interim and final reports.
As a PACE Initiative Year 5 drilling project that was approved for part-subsidy by PIRSA, a 16,777 m shallow rotary mud drilling programme was undertaken during the period August to November 2008 within five of the Sturt Joint Venture exploration...-
Document
Published: 31 Jan 1909
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-09, Yarramba Palaeochannel uranium mineral prospects. Project final report.
A PACE Initiative Year 3 subsidised drilling programme has been undertaken by the EL 3482 licensees over part of the Yarramba Palaeochannel north of the Honeymoon U deposit, seeking similar, Tertiary sediment-hosted roll-front uranium deposits in an...-
Document
-
Mundaerno South. Annual reports plus final report to licence expiry/full surrender, for the period 23/7/2007 to 22/7/2014.
A small area centred ~33 km north-west of Cockburn and ~26 km south-southeast of the Honeymoon deposit has been explored for possible buried, calcrete hosted secondary uranium deposits that may have formed in Quaternary valley fill sediments, and also...-
Document
Published: 20 Feb 1914
-
Data release - as updated : Lake Frome North (latterly part of The Lakes Uranium JV Project). Annual reports to licence expiry/full surrender, for the period 15/8/2005 to 25/11/2014.
An area on and surrounding the northern third of the Lake Frome salina was taken up to explore for possible economic buried roll front style sedimentary or calcrete-hosted uranium deposits that may have formed within Quaternary and Tertiary sediments...-
Document
Published: 01 Dec 1914
-
Data release - as updated [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports for the period 29/9/2009 to 15/11/2015.
Work undertaken on EL 4378 during the 2009-2010 reporting year included the drilling of 478 vertical rotary mud holes totalling 132,960 m, and core drilling totalling 4117 m performed in 16 of these holes for stratigraphic unit / resource...-
Document
Published: 24 Dec 1915
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-54, north Benagerie Dome copper-gold mineral prospects. Project interim and final reports.
In early 2005 Havilah Resources applied for and was successful in gaining PACE Initiative funding for part of the cost of certain exploration drilling on its Benagerie Dome acreage, to carry out a programme with these aims: 1). To confirm, better...-
Document
-
Data release - as updated : Lake Frome South. Annual reports to licence expiry/full surrender, for the period 9/5/2005 to 25/11/2015.
A large area centred ~110 km north-northwest of Olary and lying adjacent to the south-eastern margin of Lake Frome has been explored initially for buried sedimentary or calcrete type uranium deposits that may have formed in Pleistocene and Recent...-
Document
Published: 26 Nov 1915
-
Data release [made at SA Director of Mines' discretion] : Old Hut area (part of the Marree Uranium JV Project). First annual report for the period 30/6/2009 to 29/6/2010.
Exploration for possible Beverley - type Tertiary sedimentary uranium deposits associated with the north-western margin of the Mount Babbage Inlier, being undertaken within a small licence area centred approximately 120 km east of Lyndhurst, has...-
Document
Published: 16 Sep 1910
-
Data release - as updated [made at SA Director of Mines’ discretion] : Mount Yerila. Annual reports for the period 27/8/2009 to 26/8/2015.
During the 2009-2010 licence year, 8 vertical open rotary mud drillholes, YR035 to YR042, were completed along two drill traverses for a total penetration of 1614 m. They were designed to intersect the Eyre Formation adjacent to interpreted faults in...-
Document
Published: 10 Sep 1913
-
Jacks Find, Kopi Flat, Thurlooka, Yalkalpo East, Moolawatana, Billeroo, Frome, Coonee, Yalkalpo and Prospect Hill South (the Curnamona Uranium Project). Joint annual reports for the period 1/6/2007 to 31/5/2015.
A dispersed group of tenements covering the known and inferred subcrop extent of the Tertiary Yarramba Palaeovalley in the eastern and northern Lake Frome Plains region is being explored by Curnamona Energy, in a search for possible economic...-
Document
-
Curnamona [Sedimentary Uranium Exploration] Project. Joint annual report for the calendar year 2012.
During 2012, Afmeco conducted a fourth exploratory drilling campaign spread over six of its eight Curnamona Project tenements, which was designed to test the extensions of the Erudina, Yarramba and Coolibah Palaeochannels, as well as probing in basin...-
Document
-
Data release - as updated : Moolawatana. Annual reports plus final report to licence full surrender, for the period 14/4/2009 to 24/9/2015.
During the eleventh licence year, Red Metal drilled only one vertical rotary mud uranium exploratory open hole to 224 m depth, and logged it radiometrically. No significant gamma ray wireline log peaks were recorded from within clayey, mostly oxidised...-
Document
Published: 30 Jul 1915
-
Culberta Bore (part of the Curnamona South Project). Annual reports to licence expiry/full surrender, for the period 21/2/2011 to 20/2/2015.
A small area centred ~ 53 km east-northeast of Lake Frome has been explored for possible economic Tertiary palaeochannel hosted roll front style sedimentary uranium mineralisation. The Geoscience Australia Frome Embayment Airborne Electromagnetic...-
Document
Published: 14 May 1915
-
The Curnamona North Project. Joint annual reports and joint final report to the majority of licences' joint full surrender, for the period 16/7/2007 to 29/10/2015. EL 5322 final report to 15/7/2017.
A large, 3370 square km area of the Strzelecki Desert lying over and to the south-east of Lake Callabonna, and extending as far as the SA-NSW State Border, is being explored for possible economic buried sedimentary uranium mineralisation thought to...-
Document
-
Lake Callabonna and Lake Blanche (the Lakes North Uranium JV Project). Farminee's joint first annual / final report submitted to Red Metal and PIRSA at its exit from JV participation, for the period 26/11/2010 to 7/12/2011.
Two adjoining areas on the piedmont plains located to the south-west of Lakes Callabonna and Blanche, at the southern margin of the Strzelecki Desert, were taken up to explore for possible economic buried roll front style sedimentary or...-
Document
-
Lake Frome South, Central Lake Frome and Lake Frome North areas (the Lake Frome Potash Project). Joint annual reports plus final report to licences' joint full surrender, for the period 5/1/2015 to 26/4/2018.
The entire extent of the main Lake Frome salina was taken up in early 2015 with three contiguous licences covering a total area of 2718 square km, to explore for a salt lake brine potash resource which might be economic to develop to supply the local...-
Document
Published: 30 Apr 1918
-
Reaphook Hill. First partial surrender report, for the period 24/7/2013 to 23/7/2016.
An area on the south-western edge of the Frome Embayment, that is centred ~100 km south of the Beverley uranium mine, has been taken up to explore for possible buried palaeochannel and sandstone hosted roll front style secondary uranium mineralisation...-
Document
Published: 02 Nov 1917