Data release [made at SA Director of Mines' discretion] : Eucla Basin Project tenement Group 1. Joint annual reports, for the period 1/1/2016 to 31/12/2018. Plus EL 6369 surrender.
27 contiguous licence areas within the eastern Eucla Basin, that span a combined 21,772 square km of ground between points as far as 90 km north of the Trans Australian Railway, 50 km east of Nullarbor and extending right down to the coastline, and...-
Document
Published: 28 Feb 1919
-
Data release made in lieu of submitting a final report at the full surrender of EL 5285 Ingomar on 23/6/2018 : Jumbuck Project. Joint annual reports for the period 1/11/2013 to 31/10/2018.
A large area of the west-central Gawler Craton which is underlain by inferred gold-prone Archaean high grade metamorphosed rocks is being explored for Challenger style orogenic type lode gold that may have formed in the buried basement. The subject...-
Document
Published: 28 Dec 1918
-
Data release - as updated [made at SA Director of Mines' discretion] : the Tarcoola and Theseus Projects. Joint annual reports for the period 1/1/2015 to 31/12/2018.
During the fourth year of project licences' joint reporting, for the Theseus Project, Endeavour undertook further RC and diamond core drilling at the Minos prospect on EL 5280, and did detailed auger calcrete geochemical sampling over the Lake...-
Document
Published: 21 Feb 1919
-
The Musgrave Project. Joint annual reports for the period 5/10/2007 to 31/1/2012 [as later updated, to include additional licences, to 31/1/2017], plus respective successive full surrender final reports for individual licences.
The multi-licence Mithril - Barrick JV Musgrave Project area is centred 600 km south-west of Alice Springs, within the APY Lands of north-western South Australia. It is considered to be prospective for buried economic Ni-Cu-PGE sulphide mineral...-
Document
Published: 09 Oct 1917
-
Data release - as updated [made at SA Director of Mines' discretion] : the Tarcoola and Theseus Projects. Joint annual reports for the period 31/5/2010 to 31/12/2014.
A large part of the Harris Greenstone Domain basement tectonostratigraphic block, extending from 10 km to 130 km west of Kingoonya, is being explored for possible buried economic gold, nickel and other base metal mineralisation which may be associated...-
Document
-
The Musgrave Project [Part]. Data release in lieu of submitting a final report for EL 5317: joint annual reports for the period 5/10/2010 - 31/1/2016, plus separate letters of advice of full surrenders the last being accepted on 10/11/2016.
There is no abstract created for this record-
Document
Published: 06 Oct 1916
-
EL 5837, EL 5838, EL 5839, EL 5840, EL 5841, EL 5842 and EL 5843 - Coompana Project. Joint annual technical report for the period 31/8/2016 to 30/8/2018.
Exploration licences 5837, 5838, 5839, 5840, 5841, 5842 and 5843 collectively known as the “Coompana Project” cover an area of 6572 square km south of the Trans Australian Railway on the western margin of the Gawler Craton, on the South Australia –...-
Document
Published: 07 Sep 1918
-
Central Gawler Craton. Final report, Project ADI RD03-402 [Accelerated Discovery Initiative Round 3, 2023].
In July 2022, Indiana entered into a co-funded agreement with the South Australian Department for Energy and Mining under the Accelerated Discovery Initiative (ADI). The ADI proposal was to carry out a geophysics survey and, if successful, drilling of...-
Document
-
Gawler Project Central Tenement Block [Part] Nickel exploration joint venture areas. Data release made at subsequent licences' surrender: farminee Mithril Resources' annual reports for the period 12/12/2005 to 30/6/2009.
A 1600 square km portion of Dominion Mining's Gawler Project acreage, centred on ELs 3044 and 3270, has been explored for possible economic nickel sulphide mineralisation under a joint venture with Mithril Resources, which was in force during the...-
Document
Published: 08 Jul 1908
-
Data release - as updated : Minlaton South-west, Minlaton, Oaklands and Stansbury (the Yorke Peninsula Project). Annual reports, plus joint final report at remaining licences' respective expiry/full surrender, for the period 21/1/2008 to 10/10/2019.
Phoenix Copper has been exploring several tenement blocks located on western Yorke Peninsula, the prime objective being to discover an economic iron oxide - associated copper-gold-uranium (IOCGU) deposit that may have formed in buried Proterozoic...-
Document
Published: 27 Nov 1919
-
Western Gawler Project. Final report, Magneto Telluric, Passive Seismic and Magnetic Modelling Study. Project ADI RD02-296 [Accelerated Discovery Initiative Round 2, 2022].
This report summarises geophysical studies conducted by Western Areas between October 2021 and October 2022, under the ADI Agreement ADI: RD02/296-GP Magneto Telluric (MT), Passive Seismic and Magnetic Modelling Study. The discovery of magmatic Ni-Cu...-
Document
Published: 06 May 1923
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Caroline, Mount Harcus and Pine Ridge (the Musgrave Project). Joint annual reports for the period 1/7/2011 to 31/12/2018.
Three Exploration Licences spread across the central and eastern Musgrave Ranges are now being explored by NiCul Minerals Limited (a wholly owned subsidiary of PepinNini Minerals Limited) which currently owns 100% of each tenement. The ground held is...-
Document
Published: 28 Feb 1919
-
Barton West and Barton East (initially part of the Gawler Joint Venture Project). Data release made in lieu of submitting a third partial surrender report for the latter licence : joint annual reports for the period 14/3/2001 to 11/1/2011.
The trigger event causing this data release to be made is that three portions of licence ground that together cover ~289 square km or 19.5% of the former area of EL 4217 Barton East have now been relinquished, as of 11/1/2011. No corresponding partial...-
Document
Published: 09 Mar 1911
-
Toolgerie, Yalata and Black Hill (the Pathfinder Joint Venture Project). Combined annual reports and final reports to licences' respective surrenders, for the period 30/6/2004 to 18/4/2011.
The subject three contiguous exploration licences occupy the southern onshore part of the Fowler Domain, a tectonised magnetic domain located in the western Gawler Craton which has many geological similarities with the Thompson Nickel Belt of the...-
Document
Published: 18 Apr 1911
-
Commonwealth Hill, Perfection Well, Wirrida North, Nelson Bore and Ingomar (the Commonwealth Hill Joint Venture Project). Joint annual reports and final report to licences' respective expiry/renewal, for the period 6/10/1995 to 6/12/1998.
Exploration for Challenger - type primary gold deposits that may possibly have formed within buried Archaean basement rocks in the Commonwealth Hill area, which is the purpose of one of two joint venture agreements currently in force between Minotaur...-
Document
Published: 06 Jan 1999
-
Commonwealth Hill, Perfection Well and Wirrida. Six-monthly progress, plus combined annual and final reports, to licence expiry/full surrender, for the period 7/12/1993 to 18/7/2006.
Exploration for possible economic deposits of epithermal/hydrothermal gold, plus precious metals and base metals, which might have formed in poorly outcropping Archaean and Proterozoic basement, commenced with a detailed interpretation of SAEI imaged...-
Document
Published: 10 Sep 1906
-
Colona North and Barton (the Barton Magmatic Nickel-Copper-Platinum Project) and Fig Tree Corner (the three together constituting Eucla Basin Mineral Sands Tenement Group 1). Joint annual reports for the period 10/9/2001 to 28/2/2010.
Two adjoining exploration Licences 2840 “Colona North” and 2841 “Barton” were acquired by Adelaide Exploration Limited to search principally for nickel, copper and platinum group precious metals (PGM) mineralisation within Proterozoic and Archaean...-
Document
-
Murray Basin. Final report, Project ADI RD02-289 [Accelerated Discovery Initiative Round 2, 2022].
Hillgrove Resources Ltd (HGO) has identified a large number of geophysical targets through the south-east Cambro-Ordovician basement of South Australia prospective for Cu-Au mineralisation and covered by the Tertiary-Quaternary Murray Basin sediments....-
Document
Published: 12 Sep 1922
-
South Barton Siding, North Fowlers Bay, Lake Tallacootra, Chimpering Rock Hole and Tallala Hill (the Western Gawler Craton Project). Combined first annual / final report to licence expiry/full surrender, for the period 1/10/1999 to 30/9/2000.
Areas on the western flank of the Gawler Craton, between Fowlers Bay and Barton Siding, were assessed for their potential to host Thompson Belt style magmatic nickel sulphide mineralisation. A review of previous exploration, the reprocessing of...-
Document
Published: 20 Nov 1900
-
South-west Ooldea, Nullarbor, South Maralinga and Ifould Lake areas. [Joint] Surrender reports for the period 11/10/2002 to 28/8/2003.
Mineralisation analogous to that occurring at the giant Canadian Voisey's Bay Ni-Cu deposit, and Olympic Dam style Cu-Au mineralisation, were the conceptual targets of exploration in the Maralinga area, 40 to 80 km south and south-west from Ooldea....-
Document