-
Report on suspension of labour conditions for Mineral Claims 5015-5019, Hd Kooringa.
Envelope contains a Mineral Claim composite exploration data map, plus surveyed grid line data anomalous pseudosections resulting from the 25.4 line miles IP survey conducted by the company at the Burra mine and the Burra South and Burra North...-
Document
Published: 04 Oct 1966
-
Final report on exploration activities, MEPL Burra Joint Venture, for the period 1/3/1967 to 15/10/1969.
Work carried out during the final stages of the investigation consisted of diamond and percussion drilling (3 inclined and 11 vertical holes respectively, totalling 4107 and 1122 feet), plus shallow shaft sinking (16 shafts totalling 483 feet) for the...-
Document
Published: 07 May 1970
-
Burra Copper [open pit mining] Project. Reports of geological investigations for the period October 1969 to February 1981.
A collection of miscellaneous reports referring to geochemical sampling of costeans and exposed bedrock, drilling, mapping and petrology work that has recently been carried out in the re-developed Burra open cut copper mine. The focus of the work...-
Document
Published: 21 Apr 1980
-
Progress report on [near-mine] exploration activities [performed by the] Burra [Joint] Venture, for the period 10/10/1965 to 28/2/1967.
At the invitation of the South Australian Department of Mines, a mining company consortium has been formed to continue recent SA Government studies at Burra aimed at establishing the economic feasibility of re-opening the historic copper workings to...-
Document
Published: 29 Mar 1967