-
1990 Greenways Seismic Survey proposals. Reports for the period 9/2/90 to 6/3/91.
AIM: To acquire 18 line kms of detail seismic to firm up a drilling prospect, to satisfy the carried-over part of the PEL 38 Year 1 licence work commitment. In actuality this survey was not carried out: instead the licensees elected in April 1991 to...-
Document
-
Greenways 1. Test reports.
There is no abstract created for this record-
Document
-
1992 detail seismic survey, Greenways, final report.
AIM: To acquire a minimum of 50 line kms of detail seismic by 31 March 1992, to satisfy the varied PEL 38 Year 2 licence work commitment. Following the drilling of Greenways 1 (VP 296, line OHE 86-134), where a drillstem test run in a basal Eumeralla...-
Document
-
Supporting data to competitive bids for Area H part of ex-PEL 8 gazetted acreage, onshore Otway Basin (this area later being granted as PEL 38).
Several invited competing bids for 3 gazetted vacant petroleum exploration areas in the onshore Otway Basin of South Australia, known as Areas 'H', 'I' and 'J', were received on the bid closing date of 31/7/89. The acreage had become vacant as a...-
Document
Published: 28 Jul 1989
- ZIP
-
PEL 38 Otway Basin. Technical reports for the period 4/1/90 to 29/4/93.
There is no abstract created for this record-
Document
- ZIP