Great Victoria Desert - Alinya area (part of the Nawa Domain Project). Annual reports plus final report to licence expiry/full surrender, for the period 25/6/2013 to 24/6/2016.
An area centred ~145 km west-northwest of Coober Pedy, and extending northwards for ~40 km from near the Anne Beadell Highway, has been explored for possible buried economic mineralisation that may occur in basement rocks of the Gawler Craton and the...-
Document
Published: 05 Oct 2016
-
Dutton Bay (part of the Southern Eyre Peninsula JV Project). Final report [letter] at licence full surrender, for the period 16/9/2005 to 17/11/2016.
No work was reported as occurring on this area during its tenure.-
Document
Published: 30 Jan 2017
-
Data release - as updated : Western Lake Gairdner. Annual reports and final report to licence expiry/full surrender, for the period 22/2/2011 to 21/2/2018.
An area centred ~100 km south-east of Tarcoola is being explored for possible economic buried Carrapateena or Prominent Hill style IOCG and polymetallic skarn style mineralisation which may be associated with zones of elevated relief seen in existing...-
Document
Published: 29 May 2018
-
Commonwealth Hill Station - East (part of the Commonwealth Hill Project). Second partial surrender report, for the period 2/7/2007 to 1/7/2019.
Two portions in the north and south of the subject licence area, with a combined total area of 45 square km, have been surrendered due to their now perceived diminished prospectivity for iron ore, gold, uranium and base metals. During the period of...-
Document
Published: 30 Jan 2020
-
Middlecamp Hills. First partial surrender report, for the period 30/6/2009 to 19/10/2017.
A small part, just 8 square km, of the Cleve Uplands district thought to contain outcrops of the Lower and Upper Middleback Jaspilite stratigraphic units has been explored for possible economic buried copper, gold, manganese and iron ore occurrences....-
Document
Published: 24 Oct 2017
-
Tooligie Hill (latterly part of the Southern Eyre Peninsula JV Project). Final report at licence full surrender, for the period 3/12/1999 to 18/4/2017.
For the period from 1/1/2013 until the date of licence full surrender, the following additional activities were undertaken: - 1/1/2013 to 31/1/2013 – magnetite ore characterisation analyses, and interpretation of 2012 ground gravity survey data,...-
Document
Published: 14 Jun 2017
-
Mosely Nobs. First partial surrender report for the period 3/3/2008 to 2/3/2009.
As part of a multi-commodity exploration programme being conducted in an area centred 15 km north of Kimba, an appraisal of the available geophysical data revealed no significant anomalies in the now relinquished portions of the licence. No other new...-
Document
Published: 06 Jul 2010
-
Data release - as updated [made at SA Director of Mines' discretion] : Mabel Creek [South-east]. Annual reports for the period 6/9/2013 to 5/9/2018.
An area comprising two separate small sub-blocks that are located 20 and 70 km west of Coober Pedy is being explored for possible buried economic Archaean stratiform, skarn type BIF iron ore as well as for possible buried Prominent Hill type IOCG...-
Document
Published: 18 Mar 2019
-
Campoona (part of the Cockabidnie Project). Third partial surrender report at licence expiry/renewal, for the period 6/8/2007 to 5/8/2012.
The subject relinquished licence portion, located about 25 km west-northwest of Cleve, was originally applied for by Lincoln Minerals because it might be prospective for a large range of polymetallic mineral occurrences including iron ore, Menninnie...-
Document
Published: 21 Nov 2012
-
Gladstone. Annual reports and final report to licence expiry/full surrender, for the period 23/6/2009 to 22/6/2012.
An area located 34 km east of Port Pirie was applied for by Copper Range to cover historic iron occurrences and some identified magnetic anomalies considered to have similar characteristics to the promising haematite-rich Hicks Quarry target on the...-
Document
Published: 19 Jul 2012
-
Parachilna (part of the Flinders Ranges Project). Final report at licence expiry/full surrender, for the period 14/10/1999 to 18/8/2017.
Following on from a previous data release for the subject licence that covered the period October 1999 to December 2010, this report deals with Perilya's activities performed since then, i.e. surface geochemical sampling and portable XRF spectroscopic...-
Document
Published: 08 Oct 2017
-
Data release [made at SA Director of Mines' discretion] : Mount Riddoch. First annual report for the period 8/10/2012 to 7/10/2013.
An area centred ~40 km northeast of the Prominent Hill copper-gold mine is being explored for possible economic copper, gold, uranium and iron ore mineralisation that may have formed in buried Proterozoic volcanic and metamorphic basement rocks, some...-
Document
Published: 04 Dec 2013
-
Data release - as updated [made at SA Director of Mines’ discretion] : Hawks Nest. Annual reports for the period 8/4/2009 to 14/4/2019.
During the 2009-2010 reporting year, as part of the strategy to significantly advance the future development of the Hawks Nest Iron Ore Project, Western Plains Resources (WPG) successfully concluded a series of complex joint venture negotiations with...-
Document
Published: 01 Jun 2018
-
Data release - as updated [made at SA Director of Mines' discretion] : Bonython Hill. Annual reports for the period 16/9/2005 to 1/11/2013.
A small area located ~25 km east of Olary was taken up to explore mainly for possible buried economic uranium mineralisation, and to a lesser extent for gold and base metals, that may exist there in Palaeoproterozoic basement rocks. No field work...-
Document
Published: 04 Dec 2013
-
Data release - as updated : Nantuma. Annual reports plus final report to licence expiry/full surrender, for the period 21/12/2011 to 20/12/2021.
An area located ~12 km south-west of Warramboo on central Eyre Peninsula has been explored for possible buried economic Archaean stratabound iron ore, as well as for other, basement-hosted polymetallic mineral occurrences. During the first licence...-
Document
Published: 28 Dec 2021
-
Woomera Project. Joint annual reports for the period 29/9/2008 to 15/6/2017. Includes information status for EL 6085 at licence expiry, for period 16/06/2017 to 01/01/2023: no work performed.
No field work was performed on the three subject licences during the period 2008-2010 inclusive. During 2010, Dominion Gold Operations undertook a desktop evaluation of the possible iron ore potential of the licences. During 2011, the licensee...-
Document
Published: 01 Jan 2023
-
RB 2002/00012 [South Australian earth] resources production statistics for [the] six months ended 31 December 2001.
This report presents a detailed statistical record of the State's output and sales values for petroleum, minerals and materials during the six monthly period ended 31 December 2001. The first part of the report details the production sales figures for...-
Document
Published: 01 May 2002
-
RB 2002/00030 [South Australian earth] resources production statistics for [the] six months ended 30 June 2002.
This report presents a detailed statistical record of the State's output and sales values for petroleum, minerals and materials during the six monthly period ended 30 June 2002. The first part of the report details the production sales figures for...-
Document
Published: 01 Nov 2002
-
RB 2006/00011 Resources production statistics for the 6 months ended December 2005
This report presents detailed industry-derived statistics on the State's output and sales values of earth resource commodities realised during the six month period ended 31 December 2005, and compares the data with that returned for the previous six...-
Document
Published: 01 Jul 2006
-
RB 2006/00012 Resources production statistics for the 6 months ended June 2005
This report presents detailed industry-derived statistics on the State's output and sales values of earth resources commodities realised during the six month period ended 30 June 2005, and compares the data with that returned for the previous...-
Document
Published: 01 Jul 2006