-
Spencer Gulf. Progress reports to licence expiry/full surrender, for the period 12/2/1981 to 11/2/83.
A 900 line km detailed aeromagnetic survey was carried out over the northern extremity of Spencer Gulf, in a search for possible Olympic Dam style mineralisation associated with a significant and complex magnetic high anomaly that is located almost...-
Document
Published: 15 Jun 1982
-
RB 76/00159 Whyalla hospital proposed extension, foundation investigation.
A geological and geophysical investigation was carried out at a proposed site for hospital extensions to check foundation conditions. Interpreted depth to weathered bedrock ranged from 2 to 3 m along two seismic lines. The fill material above bedrock...-
Document
Published: 01 Jan 1976
-
Data release - as updated [made at SA Director of Mines' discretion] : Lake Torrens area. Annual reports for the period 6/4/2009 to 17/8/2018.
During the 2009-2010 reporting period, work completed by Straits included: • participation in Native Title and Land Access activities and negotiations, which have constituted the majority of the work undertaken; and • Holding numerous meetings and...-
Document
-
Pernatty Lagoon. Progress reports [Year 2 subset] to licence expiry/renewal for the period 1/12/1967 to 30/11/1968.
During the current period, 25 holes/1042 feet of diamond drilling to check on discrepancies with previous downhole percussion drillhole ore sample assays reported from the Lagoon area, plus 31 holes/2780 feet of exploratory/appraisal percussion...-
Document
-
Mount Gunson Project. Cattlegrid mine (east-northeast areas B2, B3 and B4) - intended mining development plans drawn up in 1982 and 1983.
There is no abstract created for this record-
Document
-
Mount Gunson Project. Pernatty Lagoon area, Main Open Cut mine, Lagoon orebody and West Lagoon orebody - intended mining plans.
There is no abstract created for this record-
Document
-
Mount Gunson Project. Main Open Cut mine - monthly incremental mining progression : surveyed pit face work plans drawn up over the period January 1981 to December 1981.
There is no abstract created for this record-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Carrapateena Arm, Hatch Hill, Beda Arm and Lake Torrens South (the OZ Minerals Carrapateena Project). Annual reports (separate and joint) for the period 8/1/2008 to 6/1/2016.
Exploration of the Lake Torrens JV Project area during 2008, managed by Teck Cominco Australia (Teck), consisted of diamond drilling some wedge holes off a parent to determine the lateral and vertical dimensions of bornite and chalcopyrite - dominated...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 3 of 4 ].
During the eighth year of tenure, work done on EL 2639 included: - the conduct of infill ground gravity and CSAMT surveys; - geophysical modelling and interpretation of the new survey data; - geological interpretation and refinement of drilling...-
Document
-
Lake Torrens South, Beda Arm and Carrapateena Arm (latterly the Lake Torrens Joint Venture Project). Annual reports (singular and combined) to licences' respective expiry/renewal, for the period 21/2/1996 to 7/1/2008.
Economic Olympic Dam style iron oxide - associated copper-gold (IOCG) mineralisation has been the target of exploration carried out in three adjoining areas which together extend for about 55 to 170 km north of Port Augusta, covering southern Lake...-
Document
-
Aerial [INPUT] EM survey data interpretation and follow-up drilling results, Winnie Pinnie area, Stuart Shelf, for the period April 1976 to May 1979.
The results of 1185 line km of aerial EM surveying carried out in the vicinity of Winnie Pinnie Dam, 85 km north-west of Port Augusta, using the Barringer INPUT system, have been interpreted as a possible means of identifying prospective Adelaidean...-
Document
-
[Predictions of] Water consumption at the Mount Gunson copper concentrator, township and mine, for a [proposed] 1515 tonnes per day operation.
Report estimates that the available water supply of 9.1 megalitres per week obtainable from Weapons Research Establishment and groundwater sources will be sufficient for the planned facilities. The further option of water recycling will effectively...-
Document
-
Andamooka Creek, Willaroo Dam, Island Dam and Stuart Shelf / Andamooka Ranges (the Stuart Shelf Project). Joint annual reports on activities undertaken by the Joint Venture consortium for the period 11/10/1996 to 10/10/2009 [ Index Part 1 of 2 ].
The four Stuart Shelf Joint Venture Project exploration licences collectively cover approximately 2668 square km of semi-arid pastoral land surrounding the Olympic Dam mine and extending east and south-eastwards as far as Lake Torrens [the Olympic Dam...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : North Roxby and Acropolis South. Joint annual reports, plus EL 3762 fifth annual report to licence sale, for the period 4/5/2009 to 3/5/2012.
Exploration for possible economic deposits of buried, Mesoproterozoic basement-hosted IOCG-U style mineralisation is being conducted over two separate multiple-block licence areas in the Olympic Dam district, EL 3761 (North Roxby) and EL 3762...-
Document
-
RB 62/00117 Report on groundwater prospects, Special Mining Lease 96, Mount Gunson.
Water for the treatment of copper ore may possibly be obtained by trenching or drilling into unconsolidated lake sediments, or by drilling deeper wells to look for supplies within the Pernatty Grit or Woolcalla Dolomite Member.-
Document
Published: 31 May 1966
-
Data release [made at SA Director of Mines' discretion] : Wilaroo Dam (part of the Stuart Shelf Joint Venture Project). Annual and joint annual reports to licence expiry/re-issue, for the period 1/8/1994 to 31/7/1999.
The subject licence is one of four located to the east and south-east of the Olympic Dam deposit, on which greenfields exploration for economic IOCG-U mineralisation is being carried out by Western Mining in joint venture with the Power and Nuclear...-
Document
-
Data release [made at SA Director of Mines' discretion] : Andamooka (part of the Stuart Shelf Project). Progress reports to licence expiry/renewal, for the period 2/5/1975 to 1/5/1977. [ Index Part 2 of 2 ].
(Abstract continued) During the fifth quarter of WMC's tenure of EL 190, a programme of stepout appraisal diamond drilling was continued, to assess the size of the copper-uranium occurrence discovered by hole RD1 (previously called RDD1 by WMC)....-
Document
-
Data release [made at SA Director of Mines' discretion] : Island Dam (part of the Stuart Shelf Joint Venture Project). Annual and joint annual reports to licence expiry/renewal, for the period 22/12/1995 to 21/12/2000.
The subject licence is one of four located to the east and south-east of the Olympic Dam deposit, on which greenfields exploration for economic IOCG-U mineralisation is being carried out by Western Mining in joint venture with the Power and Nuclear...-
Document
-
Data release [made at SA Director of Mines' discretion] : Andamooka Creek (part of the Stuart Shelf Joint Venture Project). Annual and joint annual reports to licence expiry/re-issue, for the period 1/8/1994 to 31/7/1999.
The subject licence is one of four located to the east and south-east of the Olympic Dam deposit, on which greenfields exploration for economic IOCG-U mineralisation is being carried out by Western Mining in joint venture with the Power and Nuclear...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : (for 10 exploration licences comprising) the Lake Torrens JV Project. Joint annual reports for the period 1/1/2007 to 31/12/2011.
A group of ten, mainly adjoining licence areas occupying the plains surrounding the northern end of Lake Torrens, are now being jointly explored for possible economic buried Olympic Dam style IOCG related mineralisation that may have formed in the...-
Document