-
Rehabilitation of the Nairne Pyrites Ltd quarry area and treatment of acidic effluent. Progress and final reports on investigations for the period March 1973 to June 1975.
A chemical survey of Dawesley Creek in the Brukunga Mine area has concluded that seepages from the southern mine waste dumps located alongside the creek contribute the greater proportion of pollutants (acidity, iron, aluminium, manganese, zinc,...-
Document
-
Manunda Homestead. Final report at licence expiry/full surrender, for the period 25/6/1979 to 24/6/1980.
Diamond exploration over an area located approximately 35 km south-east of Yunta was undertaken to assess an interpreted structural environment that may be similar to one existing nearby to the west close to Terowie, in which shallowly buried,...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Kimba Gap, Ironstone Hut, Ironstone Hill, Stony Hill, Gilles Downs and Minbrie areas (the Northern Eyre Peninsula Project). Joint annual reports for the period 2/12/2005 to 31/1/2013.
Exploration for possible economic occurrences of magnetite and/or haematite iron ore formed in concealed Proterozoic basement to the west of the Middleback Range is being carried out by Northern Eyre Peninsula Project (NEPP) joint venturer Centrex...-
Document
-
RB 2000/00003 Regolith studies related to the Birthday gold prospect, Gawler Craton, SA.
Our knowledge of geochemical dispersion of gold and gold pathfinders in the Gawler Craton (South Australia) is poor since there have been very few published research or orientation studies. In this study conducted at the Birthday gold prospect, the...-
Document
Published: 01 Mar 2000
-
Northern Spencer Gulf area. First partial relinquishment report for the period 23/9/2002 to 22/9/2003.
Iron-oxide copper-gold mineralisation of either Moonta-Wallaroo or Olympic Dam style was the target of exploration in an area extending southwards and eastwards from Port Augusta. A review of historic exploration data plus an evaluation of new and...-
Document
Published: 11 Nov 2003
-
Data release - as updated [made at SA Director of Mines’ discretion] : Middleback Range and Moonabie Hills. Joint annual reports for the period 1/2/2007 to 30/1/2019, plus surrender reports to 9/7/2023.
Project Connelly is designed to target haematite mineralisation on OneSteel's mining and exploration leases, including EL 3516 Middleback Range, with the aim of adding to the haematite reserve. In addition to the exploration programme, reserve...-
Document
Published: 29 Mar 2018
-
Nuckulla Hill. Annual reports and final report to licence expiry/full surrender, for the period 19/10/2002 to 28/11/2008.
Exploration for possible buried Ernest Henry or Olympic Dam style copper-gold mineralisation in the Nuckulla Hill area, 120 km north-east of Ceduna, did not progress during the first two years of tenure due to uncertainties in selecting a new remote...-
Document
Published: 22 May 2009
-
Hesso, Bookaloo, Arcoona and Lake Torrens South (the Torrens Project). Annual reports and final reports to project licences' respective sequential full surrender or expiry/full surrender, for the period 23/9/2002 to 18/4/2006.
Olympic Dam or Moonta-Wallaroo style concealed iron-oxide copper-gold mineralisation hosted in Palaeoproterozoic and Mesoproterozoic basement rocks of the Stuart Shelf, and Mount Gunson type younger Neoproterozoic sediment-hosted buried copper...-
Document
Published: 12 Oct 2006
-
Crystal Brook - Port Pirie - Wandearah West - Redhill area (part of the Moonta North Project). Second partial relinquishment report, for the period 19/9/2000 to 18/9/2003.
Iron-oxide copper-gold mineralisation of either Moonta-Wallaroo or Olympic Dam style was the target of exploration in two separate areas located south of Port Pirie and east of Redhill. A review of historic exploration data and an evaluation of new...-
Document
Published: 17 Nov 2003
-
Lake Torrens South - Port Augusta area (part of the Torrens Project). First partial relinquishment report for the period 23/9/2002 to 22/9/2003.
Iron-oxide copper-gold mineralisation of either Moonta-Wallaroo or Olympic Dam style was the target of exploration in an area lying immediately north of Port Augusta. A review of historic exploration data and an evaluation of new and historic...-
Document
Published: 08 Oct 2003
-
Data release [made at SA Director of Mines' discretion] : Crystal Brook, Port Broughton, Port Pirie, Mundoora and Winninnowie (the Moonta North Project). Annual reports and combined annual reports for the period 19/10/2000 to 1/8/2008.
Buried basement-hosted iron oxide - associated copper-gold (IOCG) mineralisation of either Moonta-Wallaroo or Olympic Dam style is the target of exploration across a number of scattered Exploration Licences trending from Port Broughton in the south to...-
Document
Published: 18 Sep 2008
-
Kalabity. Final report, Project ADI RD02-266 [Accelerated Discovery Initiative Round 2, 2022].
On 19th May 2021 Sinosteel SA secured ADI funding to carry out the comprehensive Curnamona Geochemical Sampling Program utilising the skills of the in-house geologist together with academic research collaboration to perform rigorous geochemical...-
Document
Published: 31 Aug 2022
-
RB 2006/00009 Regolith studies at the Boomerang Gold Prospect, Central Gawler Craton, South Australia
The Boomerang gold prospect is located 650 km north-west of Adelaide in undifferentiated Proterozoic rocks incorporated within Archaean Harris Greenstone Belt mafic lithologies of the Gawler Craton. The prospect was originally discovered using...-
Document
Published: 01 Sep 2006