-
Yudnamutana. Progress reports to licence expiry/renewal, for the period 24/6/1972 to 23/6/1973.
As part of continuing exploration for possible economic buried stratiform / hydrothermal copper mineralisation in the Yudnamutana Mining Field, the target lower Callanna Group strata were geologically mapped, petrologically studied and geochemically...-
Document
-
Moonta-Wallaroo region - South Australian Exploration Initiative. Prospectivity re-assessment and GIS data package (compiled 1994-1995).
To promote renewed regional exploration of the northern Yorke Peninsula using modern techniques and concepts, MESA as part of the SAEI programme has prepared a GIS-based data package, which incorporates a study of all available drillcore and a...-
Document
-
Mount Painter district (the Gunsight Joint Venture Project). Individual licence's progress reports and annual reports to project licences' joint full surrender, for the period 1/12/1982 to 16/11/1993.
There is no abstract created for this record-
Document
-
RB 41/00065 Electromagnetic surveys in the Moonta Wallaroo copperfield. Appraisal of previous work.
There is no abstract created for this record-
Document
Published: 26 Jul 1955
-
RB 79/00088 Wilkinson 1. Well completion report.
Wilkinson 1 stratigraphic well was drilled by the SA Department of Mines and Energy in mid-1978, about 250 km south-west of Coober Pedy, in the Tallaringa Trough. Here a thick section of Cambrian claystones, limestones and evaporites, at least 594 m...-
Document
Published: 01 Oct 1979
-
RB 98/00026 Partial leach geochemical survey, Monarto South, South Australia.
A partial leach soil geochemical survey has been conducted over shallowly buried Cambrian Kanmantoo Trough metasediments in the Monarto South area. The survey was designed to cover a aeromagnetic high anomaly, that is interpreted to be related to a...-
Document
Published: 01 Apr 1998
-
An atlas of geochemical dispersion around the Cattlegrid orebody.
Geochemical indicators to buried stratabound copper mineralisation in the Cattlegrid orebody were studied in their primary and secondary dispersion patterns within the overburden, to try to elucidate the likely most effective elements and the possible...-
Document
-
The Neales River Project. Data release at licences' joint surrender on 1/12/2008: combined first annual report for the period 17/5/2007 to 16/5/2008.
As part of a regional search for possible economic buried Olympic Dam type IOCG-U deposits emplaced along the north-eastern margin of the Gawler Craton, adjacent to the Peake and Denison Inliers, Barrick Gold has acquired infill helicopter-borne...-
Document
-
Mount Gunson Copper Project. Ore treatment mill throughput - monthly summary reports for the period August 1974 to June 1984.
There is no abstract created for this record-
Document
Published: 28 Jun 1984
-
SADME / Amdel Project 1/1/176 : Origin of gold mineralisation in the Adelaide Geosyncline. Progress reports 1 to 4 for the period January 1975 to August 1978.
There is no abstract created for this record-
Document
-
Data release - as updated : Edward Creek (part of the Edward Creek Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 23/9/2008 to 11/11/2018.
Reedy Lagoon Corp. (RLC) has continued to look for minerals other than diamond, operating as the manager of exploration work for base metals (mainly copper) and uranium that was undertaken by the Edward Creek Base Metal Joint Venture (“ECBMJV”) during...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Woods (part of the Mount Woods Joint Venture Project). Annual reports for the period 19/12/2000 to 30/1/2011. [Index Part 1 of 2 ].
An area centred approximately 50 km south-east of Coober Pedy has been taken up after it was surrendered early in 2000 by the BHP Minerals / Western Mining Corp. joint venture consortium (cf. Env 8434). The main mineral commodities now being sought by...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Mingary. Annual reports for the period 21/6/2001 to 5/7/2014.
An area located close to the SA-NSW State border, and centred ~55 km west-southwest of Broken Hill, covers part of the south-eastern corner of the Palaeoproterozoic Olary Domain of the Curnamona Province and the western portion of Broken Hill Domain,...-
Document
-
Data release - as updated : Kapunda North / Bagot Well North (part of the Eudunda Project). Licence-specific annual reports and final report submitted to licence expiry/full surrender, for the period 15/11/2005 to 12/12/2015.
Exploration for copper mineralisation within an area centred immediately north-northeast of Kapunda has as its initial objective to find shallow deposits of oxide and carbonate ores similar to those mined historically at Burra and Kapunda, focussing...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Alford. Annual reports to licence expiry/renewal, for the period 25/10/2007 to 4/11/2012.
Work performed at the Alford Project, until the latter half of 2007, had so far mainly concentrated on the Netherleigh Park prospect, with the density of drilling there now providing the main insights into prospectivity and controls on mineralisation....-
Document
-
Data release [made at SA Director of Mines' discretion] : Acropolis South and North Roxby. Joint annual reports for the period 26/4/2003 to 3/5/2009.
Exploration for possible economic deposits of buried, Mesoproterozoic basement-hosted IOCG-U style mineralisation is being conducted over two separate multiple-block licence areas in the Olympic Dam district, EL 2931 (Acropolis South) and EL 2932...-
Document
-
Todmorden (part of the Mount Sarah Project). Final report to licence expiry/full surrender, for the period 8/3/2018 to 7/3/2020.
An area located immediately west of Mount Alice on Todmorden Station has been explored for possible buried economic IOCG type basement-hosted mineralisation, that may have formed within Paleo to Mesoproterozoic rocks like those hosting IOCG deposits...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 4 of 4 ].
During licence Year 12, following encouraging results made by its continuing exploratory drilling, Gunson Resources was able to negotiate a joint venture over the Mount Gunson Project tenements with Falconbridge Limited through its subsidiary Noranda...-
Document
-
SADM / Amdel Project 1/1/177 : Geochemistry of South Australian copper gossans and other ironstones. Progress reports 1 and 2 for the period May 1976 to August 1977.
85 samples of potential mineral deposit- related surface ironstones (68 copper gossans, 6 lead-zinc gossans and 11 false gossans) were analysed chemically and examined mineragraphically in polished section to try to determine geological parameters...-
Document
Published: 12 Aug 1977
-
[Predictions of] Water consumption at the Mount Gunson copper concentrator, township and mine, for a [proposed] 1515 tonnes per day operation.
Report estimates that the available water supply of 9.1 megalitres per week obtainable from Weapons Research Establishment and groundwater sources will be sufficient for the planned facilities. The further option of water recycling will effectively...-
Document