-
Mount Plantagenet. Progress reports, annual reports and final report to licence expiry/full surrender, for the period 8/1/1982 to 7/1/1986.
Detailed base and precious metals exploration undertaken by Utah Development Company in the area of the Worumba Anticline has targeted possible stratiform Zambian Copperbelt - type deposits. Exploratory work has included 72 geochemical vertical...-
Document
-
RB 97/00025 Preliminary report of palaeodrainage in the St Vincent Basin and Mount Lofty Ranges.
Generalised contouring of the Mount Lofty Ranges aimed at reconstructing the Tertiary landsurface topography has identified the locations of a number of possible buried fluvial valleys and channels associated with the St Vincent Basin palaeodrainage,...-
Document
Published: 01 Nov 1997
-
Mount Morgan and Tent Hill (Stuart Creek Project). Progress and final reports from 8/1/82 to 7/1/84.
Negative heavy mineral sampling results and a lack of magnetic anomalies suggest that two areas located south-west of Lake Eyre South have little potential for diamonds and / or kimberlites.-
Document
-
Dawson Hill - Reaphook Hill areas. Partial surrender report for the period 19/11/1982 to 18/11/1986.
Mississippi Valley - style stratabound lead-zinc mineralisation in Lower Cambrian carbonate rocks, and unrelated possible diamonds ex- buried kimberlite, were the targets of exploration undertaken in the now relinquished Reaphook Hill subarea of EL...-
Document
-
Carrieton North (part of the Orroroo North Project). Progress reports to licence expiry/renewal as of a larger new tenement, for the period 19/1/1982 to 27/4/1986.
TARGET: Palaeo-alluvial diamonds in the Triassic Boolcunda Basin. EXPLORATION: Initial soil sampling and ground magnetic surveys of geochemical and geophysical anomalies; comprehensive regional and follow-up heavy mineral stream sediment sampling of...-
Document
-
Uro Bluff. Progress reports to licence expiry/full surrender, for the period 7/6/1977 to 6/6/1979.
Stratiform copper deposits, hosted within the Neoproterozoic Tapley Hill Formation, and possible diamondiferous kimberlite bodies were targeted in this exploration programme. Low value base metal intersections made from drilling (2 diamond holes,...-
Document
-
The Adelaide Hills Project. Data release made at the partial surrenders / full surrender of subsequent licences: annual reports and combined annual reports for the period 27/6/2000 to 15/5/2005.
A diamond exploration project area comprising nine mineral exploration licences located in the central Mount Lofty Ranges was taken up by new public company Flinders Diamonds (FDL) to search for possible commercial accumulations of diamonds, thought...-
Document
-
RB 2000/00018 Exploring ancient landscapes. Workshop abstracts.
Abstracts to PAPERS: - Baker, A.K.M. - Metal geochemistry of regolith in the Mount Lofty Ranges and associated alluvial fans on the Adelaide Plains. - Belperio, A.P. and Freeman, H. - Exploration using gold and base metal pathfinders in calcareous...-
Document
Published: 01 Dec 1999
-
RB 2014/00006 Geology of the Cultana 1:100 000 map sheet (6432).
The revised digital geology map of the Cultana 1:100 000 map sheet and accompanying geological descriptions in this report are the first components of the 2nd edition PORT AUGUSTA 1:250 000 map sheet to be completed. The subject map sheet occupies the...-
Document
Published: 01 Jan 2014
-
Wedge Hill (Mount Wedge Project). Annual and final reports for the period 26/5/1997 to 25/5/1999.
Groundwater sampling, aeromagnetic interpretation, shallow auger sampling and isotope studies were carried out over an area 30 km northeast of Elliston. Heavy mineral concentrates from composite auger samples contained zircon, galena and sphalerite,...-
Document
-
Galaxy Tank (part of the Central Gawler Project). Annual reports to licence expiry/full surrender, for the period 22/3/2006 to 10/5/2013.
Tasman Resources' ("Tasman") Central Gawler Project tenement acreage, originally comprising seven exploration licences ELs 3339 to 3345, was initially applied for on the basis of perceived prospectivity for diamonds: however, following Tasman's...-
Document
Published: 16 Jul 2013
-
Data release [made at SA Director of Mines’ discretion] : Flinders Island and Flinders Island Coast. Annual, joint annual and combined annual reports for the period 4/1/1999 to 3/1/2009.
A renewed effort to determine the diamond mineral potential of the 15.6 square km of land comprising Flinders Island was instigated during January 1999, under tenure of EL 2577, by Orogenic Exploration Pty Ltd, a company related to the previous...-
Document
Published: 06 Jun 2009
-
Data release - as updated [made at SA Director of Mines’ discretion] : Flinders Island and Flinders Island Coast. Joint annual reports for the period 4/1/2009 to 3/1/2019.
During licence Year 11, the lithological logs were digitised and are now presented for the remaining eight holes of the first drilling program (completed in 2002), together with the holes from the second (2003), and third (2004) drilling programs....-
Document
Published: 01 Mar 2019
-
Milang [Homestead]. First partial surrender report for the period 25/8/2005 to 24/8/2006.
Exploration for a range of mineral commodities over relinquished parts of a licence area situated 80 km north-east of Orroroo has mainly targeted the Cainozoic to Mesozoic cover rocks for possible sedimentary gold, uranium, mineral sands and...-
Document
Published: 14 Sep 2006
-
The Springfield Project. Data release at licences' partial surrender/ full surrender: licences' combined annual reports re. diamond exploration activities for the period 1/1/2001 to 1/8/2011. [Index Part 2 of 2].
During 2005, consultant geomorphologist Richard Russell was contracted by FDL to undertake a study of existing 'unsourced’ kimberlite indicator mineral (KIM) anomalies that occur in the northern part of the Springfield Project area. The initial aim of...-
Document
Published: 09 Nov 2011
-
RB 2005/00004 Palynological evidence for late Eocene and late Miocene early Pliocene sediments of Flinders Island, South Australia
Palynological analysis and dating of 45 sediment core samples, obtained from several rotary drillholes that have recently been drilled to explore for buried diamonds and kimberlite indicator minerals on Flinders Island, South Australia, has indicated...-
Document
Published: 01 May 2005