RB 99/00024 Calcrete sampling, Hawks Nest prospect, highlighting the mineral potential.
As part of the South Australian Steel and Energy Project, Mines and Energy South Australia completed an exploration programme for iron ore at the Hawks Nest prospect during 1995 and 1996. Along with detailed magnetic and gravity surveys, the work...-
Document
Published: 01 Oct 1999
-
Commonwealth Hill, Perfection Well, Wirrida North, Nelson Bore and Ingomar (the Commonwealth Hill Joint Venture Project). Joint annual reports and final report to licences' respective expiry/renewal, for the period 6/10/1995 to 6/12/1998.
Exploration for Challenger - type primary gold deposits that may possibly have formed within buried Archaean basement rocks in the Commonwealth Hill area, which is the purpose of one of two joint venture agreements currently in force between Minotaur...-
Document
Published: 06 Jan 1999
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Hope. Annual reports for the period 12/4/2002 to 14/3/2019.
Exploration of an area located on western Eyre Peninsula between Sheringa and Mount Hope is continuing, with the intent of discovering economic buried base and precious metal deposits of volcanogenic sediment-hosted massive sulphide (VHMS) style...-
Document
-
Mount Grainger (Oodla Wirra). Progress reports and final report to licence expiry/full surrender, for the period 8/10/1970 to 7/10/1971.
Extensive literature and geological and geochemical field investigations of historic mines and prospects at the Mount Grainger and Oodla Wirra Goldfields have failed to disclose any remaining economic gold occurrences. The sparse native gold occurs...-
Document
Published: 12 Oct 1971
-
Wildingi [Claypan] and Galaxy [Outstation]. Licence-specific annual reports, plus joint final report to licences' joint full surrender, for the period 22/11/1995 to 13/4/1999.
21 gold exploration targets with anomalous regolith Au > 10 ppb were generated by extensive regional and infill calcrete sampling of an area 80 km south-west of Coober Pedy. Aircore, RAB and RC drilling at four of these prospects (269 holes, total...-
Document
-
Mutooroo (latterly part of the Border JV Project). Second partial surrender report at licence expiry/renewal, for the period 16/1/1997 to 18/4/2017.
Four separate large portions of a long-held licence area abutting the SA/NSW state border in the vicinity of Mutooroo have been relinquished as part of statutory requirements. The following summary prepared by Minotaur Exploration describes work done...-
Document
-
SADM / Amdel Project 1/1/177 : Geochemistry of South Australian copper gossans and other ironstones. Progress reports 1 and 2 for the period May 1976 to August 1977.
85 samples of potential mineral deposit- related surface ironstones (68 copper gossans, 6 lead-zinc gossans and 11 false gossans) were analysed chemically and examined mineragraphically in polished section to try to determine geological parameters...-
Document
Published: 12 Aug 1977
-
Wirrealpa. Progress and technical reports to licence expiry/full surrender for the period 13/9/1988 to 12/9/1989.
Possible economic stratabound or epigenetic lead-zinc or copper deposits, formed in altered carbonate rocks lying marginal to the Wirrealpa Diapir, were the targets of new exploration centred on the area of the old Wirrealpa lead-silver mine....-
Document
Published: 06 Nov 1989
-
Cudyea. Progress reports for the period 14/2/89 to 13/11/90.
TARGET: Archaean greenstone-hosted gold, hypothermal iron and base metals, and Olympic Dam style mineralisation within an area located about 170 km north-west of Tarcoola. EXPLORATION: Regional and follow-up soil sampling (253 samples), geological...-
Document
Published: 07 Dec 1990
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-25 - Wilcherry Hill area, Eyre Peninsula, Zealous prospect Mesoproterozoic epithermal calc-silicate skarn Sn-U-Pb-Cu-Ag mineral occurrence. Final report.
Arising out of exploratory drilling carried out by Ironclad Mining in 2012, which aimed to test the shallow subsurface haematite ore potential of an ironstone outcrop located in the central north of the Wilcherry Hill licence area, an unexpected...-
Document
-
Data release - as updated : Mutooroo (part of the Border Project). Annual reports [but excluding three separately held joint annual reports] and final report to licence expiry/full surrender, for the period 3/4/2007 to 18/4/2020.
During licence Year 11 (2007-2008), exploration activities on renewed EL 3745 included: • acquiring 1.9 line km of TEM profiles at Dingo prospect; • acquiring 21.4 line km of ground magnetic survey coverage at 1-metre station spacing on three...-
Document
-
Mount Christie - Mulgathing - Wynbring area. Progress reports and final report to licence full surrender, for the period 29/4/1971 to 18/10/1971.
Special Mining Lease 491 covers an area of poorly exposed Precambrian rocks in the north-western sector of the Gawler Platform of western South Australia. General reconnaissance in late 1969 showed the geology of the area to be dominated by sediments...-
Document
-
Appila. First and final report to licence surrender for the period 7/2/79 to 6/5/79.
16 previously identified aeromagnetic anomalies in the vicinity of Gladstone and Booleroo Centre were investigated for their diamond and base metal source potential. Rock chip, loam and stream sediment sampling failed to reveal geochemical anomalies...-
Document
-
Eastern Eyre Peninsula. Progress reports and final report to licence expiry/full surrender, for the period 25/10/1976 to 24/10/1978.
Stratabound, metasedimentary iron ore was the principal target of exploration undertaken by BHP over a large area surrounding the Moonabie Range that extends along strike and borders the north-western side of Spencer Gulf. Base and precious metals...-
Document
-
RB 73/00004 Investigation of the Anabama copper and molybdenum prospect, Olary Wadnaminga.
Stream sediment sampling, induced polarization surveys and a 44 drill hole rotary drilling program were undertaken over the Anabama Granite. The granite was found to be unmineralized except for greisened portions containing anomalous copper and...-
Document
Published: 01 Jan 1973
-
Gilles Downs (part of the Northern Eyre Peninsula Project). First annual report (prior to start of joint reporting status) for the period 8/7/2005 to 7/7/2006: and final report submitted at licence full surrender, for the succeeding period to 30/7/2015.
A licence area consisting of two separate sub-blocks located on the plains extending to the west of the Middleback Range on north-eastern Eyre Peninsula was taken up to explore for possible economic buried deposits of stratabound magnetite iron ore...-
Document
-
Data release - as updated : Cockabidnie. Annual reports and final report to licence expiry/full surrender, for the period 31/5/2001 to 13/8/2015.
Early in 2001, Helix Resources Ltd entered into a joint venture agreement with Centrex Resources Limited to allow it to explore for precious and base metals on some of the tenements held by Centrex on the Eyre Peninsula in South Australia, including...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Kimba Gap, Ironstone Hut, Ironstone Hill, Stony Hill, Gilles Downs and Minbrie areas (the Northern Eyre Peninsula Project). Joint annual reports for the period 2/12/2005 to 31/1/2013.
Exploration for possible economic occurrences of magnetite and/or haematite iron ore formed in concealed Proterozoic basement to the west of the Middleback Range is being carried out by Northern Eyre Peninsula Project (NEPP) joint venturer Centrex...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Cowell (latterly part of the Cowell JV Project). Annual reports for the period 23/9/2002 to 6/11/2008.
A large licence area, comprising two separate blocks aligned along strike, which cover the northern Cowell Hills and the less elevated country stretching north-east of Lucky Bay, was taken up by Avoca Resources Ltd as part of a much wider search...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Tooligie Hill. Annual reports submitted until the commencement of joint reporting on Southern Eyre Peninsula JV Project, for the period 3/12/1999 to 10/3/2006.
There is no abstract created for this record-
Document