Interpretation and evaluation of the Gunsight prospect.
Gunsight prospect was discovered in the late 1960s during the follow-up of anomalous copper detected by a stream sediment survey. In 1972-73 Dampier Mining Pty Ltd drilled eleven percussion holes (totalling 537 m) and eleven diamond holes (1764 m)...-
Document
-
EL 272 Hamilton Creek. A regional assessment of the base metal potential of the Parabarana (to) Gunsight trend, and Callanna Beds (through) Yudnamutana sequence, northern Mount Painter Province, South Australia.
Aquitaine Australia Minerals Pty Ltd (Aquitaine) entered into a joint venture with North Flinders Mines on 21 August 1975, over an area defined by Exploration Licence 272 (ex EL 153). The area included two main prospective zones for copper deposits:...-
Document
-
Annual report on exploration activities, Mount Neill and Mount Fitton areas, EL 871, 1982.
A reassessment of Marathon Petroleum's 1979 regional stream sediment sampling programme led to the decision to resample a number of areas within EL 871. The Mt Neill and Mt Fitton areas were chosen, as a result of possible similarities with the...-
Document
-
Summary of the previous exploration for stratiform copper and proposed follow-up exploration in the Yudnamutana Hill area, South Australia.
This report summarises the relevant results of previous copper exploration in the Yudnamutana Hill area by Utah Exploration Co. and Australian Aquitaine Petroleum Pty Ltd, and suggests an ongoing exploration programme for stratiform copper. It also...-
Document
-
Interpretation report on self potential surveys undertaken at the Gunsight area, South Australia.
SP data acquired over the Gunsight Cu-U-Co-REE prospect has accurately located the main mineralised zone between grid 900E and 1100E, with a maximum anomaly of approximately 200 mV on line 900E. The slight asymmetry of the SP profiles confirms the...-
Document
-
Yudnamutana Project, SML 704. Old Noll prospect. Report on drilling DDH NFK1.
Diamond drill-hole NFK1 was drilled to a total depth of 289.56 metres at the Old Noll prospect in November - December 1972, with the aim of intersecting the buried source of mineralization that has given rise to the boxwork structures outcropping...-
Document
-
Mount Painter district (the Gunsight Joint Venture Project). Individual licence's progress reports and annual reports to project licences' joint full surrender, for the period 1/12/1982 to 16/11/1993.
There is no abstract created for this record-
Document
-
Review of Mineral exploration activity, 2003 and 2004.
2003 activity: Expenditure by companies on mineral exploration licences in South Australia for calendar year 2003 was $37.0 million, a slight increase on the $35.7 million spent in 2002. Mineral exploration drilling metreage, a key indicator of...-
Document
-
Mount Brady (part of the Mount Woods Project). First partial surrender report for the period 10/7/2007 to 9/7/2009.
The Mount Brady exploration licence, located some 40 km south of Coober Pedy, abuts the northern boundary of IMX Resource's Kangaroo Dam EL 3445, and overlies the north-western part of the Palaeoproterozoic Mount Woods Inlier. The area forms part of a...-
Document
-
Trumpeter (part of the Mount Woods Joint Venture Project). Annual and final reports to licence surrender for the period 19/12/2000 to 29/11/2007.
Ground covering a major east-west trending shear zone in the north-eastern portion of the Mount Woods Inlier was taken up by Goldstream Mining to allow an evaluation of its IOCG - style mineralisation potential, possibly for Fe-Cu-Au occurrences of a...-
Document
-
Data release [made at SA Director of Mines' discretion] : Kangaroo Dam (part of the Mount Woods JV Project). Annual reports to licence expiry/renewal, for the period 19/10/2000 to 6/11/2010. [ Index Part 1 of 2 ].
The large Kangaroo Dam exploration licence covers the mostly concealed western portion of the Palaeoproterozoic Mount Woods Inlier, a large block of variable magnetic intensity lying to the east and south-east of the Coober Pedy Ridge and the Mabel...-
Document
-
Data release [made at SA Director of Mines' discretion] : Kangaroo Dam (part of the Mount Woods JV Project). Annual reports to licence expiry/renewal, for the period 19/10/2005 to 6/11/2010. [ Index Part 2 of 2 ].
During the first year of renewed tenure under EL 3445, the work done consisted of performing diamond and RC drilling programmes which were partly funded by PIRSA's PACE Initiative as Theme 2, Year 2 and 3 approved Drilling Collaboration Projects. The...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Woods (part of the Mount Woods Joint Venture Project). Annual reports for the period 19/12/2000 to 30/1/2011. [ Index Part 2 of 2 ].
During the 2006 reporting period for renewed Mount Woods EL 3518 (i.e. for licence Year 6), Goldstream conducted ongoing exploration that included campaigns of diamond, RC, RAB and AC drilling, plus, in relation to the possible iron ore / copper-gold...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 1 partnership no. DPY1-13, Gemini mineral prospect. Project final report.
The Mount Woods South Joint Venture (Adelaide Resources Ltd and Perilya Ltd) successfully made application for a share of the SA Government's PACE Initiative funding in 2004 to test geophysical anomalies located on EL 2901 which were defined by...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Woods (part of the Mount Woods Joint Venture Project). Annual reports for the period 19/12/2000 to 30/1/2011. [Index Part 1 of 2 ].
An area centred approximately 50 km south-east of Coober Pedy has been taken up after it was surrendered early in 2000 by the BHP Minerals / Western Mining Corp. joint venture consortium (cf. Env 8434). The main mineral commodities now being sought by...-
Document
-
Mount Paisley. Annual reports to licence expiry/full surrender, for the period 8/9/2015 to 7/9/2017.
No new work - only a desktop review of reports on past exploration was done.-
Document
-
Warrina North, Warrina South, Mount Brady, Yarrabolina Hill, Mount Woods and Kangaroo Dam (the Mount Woods JV Project). Joint annual reports [on JV partners' independent exploration programmes] for the period 1/5/2010 to 31/1/2017.
During the 2011-2012 project reporting period, exploration activities within the Mount Woods Project area which were conducted by OZL primarily targeted IOCG style mineralisation. Work included: · a continuation of office-based target generation and...-
Document
-
Engenina Creek - Mount Brady and Balta Baltana Creek areas, south-east of Coober Pedy. Progress reports and final annual report to licences' expiry/full surrender, for the period 6/4/1981 to 23/6/1993.
{ELs 822, 1145, 1494 programme}: TARGET: Roxby Downs and Tennant Creek - style copper, gold, and uranium, plus diamonds in kimberlite diatremes and metamorphic and hydrothermal breccia - related iron ore, in the Engenina Creek area, 60 km south-east...-
Document
Published: 24 Jul 1993
-
SADME/Amdel Project 1/1/209 : [petrographic] comparison of some Archaean and Proterozoic iron formations in SA. Progress reports 1 to 4, for the period December 1977 to July 1979.
A project to compare Gawler Craton iron formations of unknown age with those of known Archaean age (from geochronology) and with the Proterozoic, Lake Superior - type Middleback Range iron deposits has concentrated on characterising each formation by...-
Document
Published: 30 Jul 1979
-
Mount Sandy (part of the Stuart Range Joint Venture Project). Progress reports and final report to licence expiry/full surrender, for the period 3/5/1977 to 2/5/1978.
Following the first public announcement on 18/11/1976 by Western Mining Corp. of its giant Olympic Dam copper, gold and uranium discovery on Roxby Downs Station, Newmont Pty Ltd began a detailed assessment of the Stuart Shelf region of South...-