PEL 25, Otway Basin. Progress and technical reports for the period 11/8/94 to 7/6/97.
During their licence tenure the PEL 25 licensees performed a protracted Year 1 round of seismic data test reprocessing, followed by selective survey line reprocessing and reinterpretation (eventually addressing approximately 352 line km of 1980-1992...-
Document
Published: 07 Jun 1997
-
PEL 32. Progress and technical reports for the period 19/2/85 to February 1993.
Reports document the exploration activity highlights deriving from PEL 32 during its first 8 years of tenure, including the discovery of the first commercial petroleum accumulation within the South Australian portion of the Otway Basin, after some 28...-
Document
-
Greenways 1. Test reports.
There is no abstract created for this record-
Document
-
1992 detail seismic survey, Greenways, final report.
AIM: To acquire a minimum of 50 line kms of detail seismic by 31 March 1992, to satisfy the varied PEL 38 Year 2 licence work commitment. Following the drilling of Greenways 1 (VP 296, line OHE 86-134), where a drillstem test run in a basal Eumeralla...-
Document
-
Otway Basin. Exploration opportunity. Blocks OT96-A and OT96-B.
Two areas (OT96-A and B) located in the South Australian sector of the onshore Otway Basin are available until 27/9/96 for applications of grant as Petroleum Exploration Licences (PELs). Both areas contain a number of undrilled prospects and leads...-
Document