-
Data release - as updated : Minbrie. Annual reports plus final report to licence expiry/full surrender, for the period 3/12/2001 to 30/5/2006.
There is no abstract created for this record-
Document
-
Data release [made at SA Director of Mines’ discretion] : Stony Hill (part of the Northern Eyre Peninsula Project). First annual report (submitted prior to start of the project's joint reporting status), for the period 2/12/2004 to 1/12/2005.
A licence area covering the subdued hilly terrain lying a short distance to the west of the northern Middleback Range on north-eastern Eyre Peninsula was taken up to explore for possible economic buried deposits of stratabound magnetite iron ore which...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Kimba Gap, Ironstone Hut, Ironstone Hill, Stony Hill, Gilles Downs and Minbrie areas (the Northern Eyre Peninsula Project). Joint annual reports for the period 2/12/2005 to 31/1/2013.
Exploration for possible economic occurrences of magnetite and/or haematite iron ore formed in concealed Proterozoic basement to the west of the Middleback Range is being carried out by Northern Eyre Peninsula Project (NEPP) joint venturer Centrex...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Tooligie Hill. Annual reports submitted until the commencement of joint reporting on Southern Eyre Peninsula JV Project, for the period 3/12/1999 to 10/3/2006.
There is no abstract created for this record-
Document
-
Data release [made at SA Director of Mines' discretion] : Middleback Range. Progress reports and annual reports to licence expiry/renewal, for the period 6/6/1990 to 5/6/1995.
A licence area consisting of two separate sub-blocks that cover ~460 square km of Palaeoproterozoic BIF ironstone outcrops in the northern and southern parts of the Middleback Range on north-eastern Eyre Peninsula was taken up by The Broken Hill Pty...-
Document
-
Verran (part of the Kimba-Verran Joint Venture Project, and also part of the Eyre Peninsula Joint Venture Project). Annual and combined annual reports for the period 28/6/2002 to 11/7/2009.
No field work was conducted on the subject licence area, which comprises three sub-blocks, for all of Years 6-11 (period 2002-2008) on EL 2981. During Year 8 of the project (8th March to 28th December 2004), exploration activities were reported...-
Document
-
Ironstone Hill (part of the Northern Eyre Peninsula Project). Final report at licence full surrender, for the period 17/9/2003 to 17/9/2015.
During the majority of its tenure term, very little field work was conducted on the subject ground. Initially, office studies of available geophysical and open file geological data were performed during 2005 to try to identify possible drilling...-
Document
-
Cowell. Progress reports to licence full surrender, for the period 27/7/1981 to 7/7/1982.
Appraisal of the southern Middleback Range to Cowell area for possible buried diamondiferous kimberlites and for economic extensions to stratiform iron ore deposits was undertaken. A limited drainage bulk sampling programme was unsuccessful in...-
Document
Published: 27 Aug 1982
-
Glengyle. Partial surrender report for the period 9/9/1997 to 15/5/1999.
No significant gold or base metal anomalies were returned from lag/laterite sampling 15 km west to northwest of Port Lincoln. Although extensive cover of aeolian Bridgewater Formation prevented systematic regolith sampling, shallow drilling was...-
Document
-
Verran. First partial surrender report for the period 4/4/1997 to 3/4/1998.
No magnetic or geochemical exploration targets for potential Hutchison Group stratabound Cu-Au mineralisation were identified in an area 28 kms north-west of Arno Bay, between Wharminda and Kielpa.-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-27 - Cleve area Proterozoic unconformity-style uranium mineral prospects. Project final report.
In May 2009 a total of 45 aircore blade or hammer holes (total penetration 1332 m) were drilled by Adelaide Resources along six northeast-southwest trending traverses laid out immediately south-west of Cleve, to test a conceptual unconformity - style...-
Document
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 2 of 2].
The Telephone Dam lead-zinc-silver prospect is located in the north-eastern part of the now renewed Wilcherry Hill EL 4162. During the 1980s and 1990s, diamond, RC and RAB drilling done on this prospect by Aberfoyle Resources had identified a...-
Document
Published: 31 Dec 2008
-
The Southern Eyre Peninsula JV Project. Joint annual reports for the reporting period 1/7/2006 to 31/1/2017, plus licence-specific final reports submitted at their later full surrenders.
During the first year of the project (2006-2007), no work was undertaken on ELs 3731, 3421 or 3611. On EL 3317 Wilgerup, at the Wilgerup North Pod, Centrex undertook 2 phases of RC drilling totalling 135 holes for 12,829 m to provide information to...-
Document
Published: 09 Apr 2019
-
Data release [made at SA Director of Mines’ discretion] : Verran. Annual reports to licence expiry/renewal, for the period 4/4/1997 to 3/4/2002.
Part of the Cleve Uplands centred 15 km west of Cleve has been taken under licence to explore its potential for buried economic copper-gold mineralisation to occur within Archaean or Proterozoic basement rocks. Other possible commodities of interest...-
Document
Published: 05 Sep 2002
-
Data release [made at SA Director of Mines’ discretion] : Waddikee. Annual reports to licence expiry/renewal, for the period 24/5/2005 to 23/5/2010.
An area centred ~20 km south-southwest of Kimba is being explored for possible buried Tanami style orogenic lode gold and also for Mount Isa / Broken Hill style base metals mineralisation, which could occur within reactive chemical and pelitic...-
Document
Published: 10 Aug 2010
-
Carpie Puntha and Peterlumbo (part of the Wilcherry Hill Joint Venture Project). Data release at the third renewal / partial relinquishment of the latter licence : progress and annual reports for the period 14/2/1989 to 30/8/2003. [Index Part 2 of 2].
Abstract continued : During January-February 1993, five traverses spaced 800 m apart of RAB drillholes put in 50 m apart (57 vertical holes for a total penetration of 2688 m) were completed at Death Adder prospect by Aberfoyle Resources to appraise...-
Document
Published: 16 Oct 2003
-
The Northern Eyre Peninsula JV Project. Data release made in lieu of submitting a licence final report at the full surrender of EL 5170 Kimba Gap: Joint annual reports for the period 1/2/2013 to 9/2/2017.
During the Northern Eyre Peninsula Project (NEPP) 2013-2014 reporting year, exploration field work took place on two of the six project tenements. On EL 4884 Minbrie, a single 151 m deep vertical RC drillhole, BURC092, was completed in August 2013,...-
Document
Published: 25 Sep 2018
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 1 of 2].
Aquila Resources took up ownership of the much previously-explored ground comprising the Wilcherry Hill Project with the intent of exploring for the first time the iron oxide - associated copper-gold & uranium (IOCG-U) mineralisation potential of...-
Document
Published: 31 Dec 2008
-
Data release - as updated [made at SA Director of Mines' discretion] : Lipson Cove. Annual reports for the period 29/9/2009 to 28/9/2014.
An area in the Cowell Hills centred ~20 km north of Tumby Bay on eastern Eyre Peninsula was taken up primarily to explore and evaluate known talc and graphite occurrences, but the grant licensee's initial review of previous exploration data revealed...-
Document
Published: 12 Dec 2014
-
Carpie Puntha and Peterlumbo (part of the Wilcherry Hill Joint Venture Project). Data release made at the third renewal / partial surrender of the latter licence: progress reports and annual reports for the period 14/2/1989 to 30/8/2003. [Index 1 of 2].
Two contiguous areas located south of the Gawler Ranges, between Buckleboo and Franklin Harbour, were taken up primarily to explore the Early Proterozoic metasedimentary sequence for possible Broken Hill type economic stratiform / hydrothermal base...-
Document
Published: 16 Oct 2003