-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 4 of 4 ].
During licence Year 12, following encouraging results made by its continuing exploratory drilling, Gunson Resources was able to negotiate a joint venture over the Mount Gunson Project tenements with Falconbridge Limited through its subsidiary Noranda...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 3 of 4 ].
During the eighth year of tenure, work done on EL 2639 included: - the conduct of infill ground gravity and CSAMT surveys; - geophysical modelling and interpretation of the new survey data; - geological interpretation and refinement of drilling...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1998 to 17/10/2008 [ Index Part 2 of 4 ].
Stuart Metals is primarily exploring EL 1946 for stratiform copper mineralisation of the various styles known to be present in the Mount Gunson district. In addition, the company regards the largely unknown Mesoproterozoic basement to have strong...-
Document
-
Lake Torrens - Port Augusta and Point Paterson areas. Progress reports to licence expiry/renewal, for the period 26/11/1977 to 30/11/1979.
SALT MINING STUDY: Field tests on the feasibility of Lake Torrens salt production to supply raw material for the planned Redcliff Petrochemical Project were continued, with project planning technical data demonstrations given to visiting officials of...-
Document
-
Pandurra. Progress reports and final report to licence expiry/renewal, for the period 7/4/1975 to 6/4/1977.
Ongoing exploration for a possible Cattlegrid type stratabound copper deposit over an area south-west of Lake Torrens included aerial magnetic and EM surveys, drill testing of EM anomalies by 47 percussion holes totalling 2086 m, a regional magnetic...-
Document
-
Mount Gunson. Progress reports and final report to licence expiry/renewal, for the period 5/8/1977 to 4/8/1979.
In a search for possible economic repetitions of Cattlegrid and MG14 - style copper sulphide mineralisation, or for any buried analogues to Western Mining Corp.'s recently discovered copper deposits on Roxby Downs Station, ongoing exploratory work...-
Document
-
Salt Creek. Progress reports to licence expiry/renewal, for the period 13/9/1976 to 12/9/1978.
Possible buried stratabound copper mineralisation of Mount Gunson / Cattlegrid type was the target of exploration performed on an area of the Stuart Shelf located 60 km east of Woomera. After conducting detailed 1:12,000 and 1:16,000 scale geological...-
Document
-
Mount Paisley. Progress reports and final report to licence expiry/full surrender, for the period 27/4/1977 to 26/4/1979.
Exploration for possible Olympic Dam type base metal sulphide deposits within the pre-Adelaidean basement underlying an area 100 km north-east of Kingoonya initially included making over 100 rock unit density and magnetic susceptibility measurements...-
Document
-
Geophysical logging of drill holes in the Mount Gunson and Pandurra Homestead areas, SA.
Formation responses in the 2 study areas and comparisons with earlier logs from the Bookaloo area and PL 32 have led to the recognition of diagnostic features in the identification of different formations. More data are required before geophysical...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 18/10/2008 to 24/3/2018.
During licence Year 15 (2008-2009), activities at Mount Gunson comprised: - pegging of three Mineral Claims at the MG 14 deposit in December 2008; - acquiring part of a larger project-wide ground gravity survey during April-May 2009 (510 stations...-
Document
Published: 22 Aug 1918
-
Stuart Creek. Progress reports and final report to licence expiry/full surrender, for the period 20/8/1979 to 18/10/1982.
One vertical stratigraphic diamond drillhole [the 1a re-drill] was fully cored to 1450 m total depth over a regional gravity high in the western half of the licence which was thought to be prospective for Olympic Dam type polymetallic mineralisation...-
Document
-
Pernatty Lagoon. Progress reports and final report to licence expiry/renewal, for the period 20/7/1975 to 19/7/1977.
As part of continuing brownfields exploration for extensions to known stratiform base metal mineralisation in the area lying to the west of Pernatty Lagoon, much stratigraphic drilling (210 rotary percussion holes totalling 12,441 m, including 1167 m...-
Document
-
Geophysical logging of percussion drill holes, June - August 1978.
Formation responses in 12 drill holes were studied. SP and PR logs were run for only 6 holes because of highly saline groundwater conditions. No meaningful electrical logs were obtained.-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : North Roxby and Acropolis South. Joint annual reports, plus EL 3762 fifth annual report to licence sale, for the period 4/5/2009 to 3/5/2012.
Exploration for possible economic deposits of buried, Mesoproterozoic basement-hosted IOCG-U style mineralisation is being conducted over two separate multiple-block licence areas in the Olympic Dam district, EL 3761 (North Roxby) and EL 3762...-
Document
-
Pernatty Lagoon. Progress reports and final report to licence expiry/renewal, for the period 20/7/1973 to 19/7/1975.
Ongoing appraisal work conducted by CSR at the company's newly discovered Cattlegrid copper deposit that lies at the top of the Pandurra Formation has included infill rotary percussion and diamond drilling (13 holes for 554 m, including 166 m cored),...-
Document
-
Woomera 1. Geological sample inspection and drilling progress reports, plus well test technical data.
There is no abstract created for this record-
Document
Published: 17 Feb 1981
-
Billa Kalina Homestead. Progress reports and final report to licence full surrender, for the period 30/6/1977 to 14/2/1979.
Airborne and ground geophysical surveys were undertaken in the Billa Kalina area, prior to commencing to drill in a search for Olympic Dam type Cu-U-Au mineralised haematitic breccias, in order to delineate and detail several broad magnetic anomalies...-
Document
-
Stuart Shelf Project. EL 1338 first [and Project second overall] partial surrender report, for the period 2/5/1975 to 16/6/1991.
TARGET: Possible buried base and precious metal deposits associated with aeromagnetic anomalies, and also with either coincident or unrelated gravity anomalies, lying within a relinquished sector of the large contiguous multi-licence area that Western...-
Document
-
Summary report on the Pandurra copper prospect, SML 204, South Australia.
Near Pandurra Homestead on eastern Eyre Peninsula, dispersed secondary copper mineralisation occurs in faulted Upper Proterozoic sediments, along which some 30 shallow pits, probably dating back to the late 1800s, have been sunk. In an effort to...-
Document
-
[Final] Summary report, SML 204, SA.
BHP took out SML 204, covering 970 square miles located due east of the northern Middleback Range, for 2 years from 1/7/1968. The prime objective was to explore there for uranium and copper mineralisation. Work undertaken can be summarised as...-
Document