-
RB 44/00045 Iron King magnetite deposit.
There is no abstract created for this record-
Document
Published: 01 Jan 1959
-
RB 44/00089 Report on diamond drilling of a magnetic anomaly at Weetulta, Yorke Peninsula, secn 201 Hd Tiparra, Co. Daly.
Two angle diamond drillholes (totaling 1062 feet) were put down on a site of an anomaly detected during an aeromagnetic and ground magnetic survey. It was hoped that copper mineralisation may be located. A magnetic zone 80 feet wide and dipping 65...-
Document
Published: 01 Jan 1957
-
RB 45/00118 Final report on iron ore prospecting, Corunna area, Iron Knob district.
In an area of limited basement outcrop located between 2 and 5 miles north-northwest of Iron Knob township, the Department's surface traverse channel sampling (969'), percussion boring (643’) and diamond drilling (1270’) tested a low grade...-
Document
Published: 04 Dec 1957
-
RB 77/00051;Env 03054 Porphyry style copper/molybdenum mineralization at Anabama Hill and the Cronje Dam copper prospect.
For a project to determine the base metal potential of known copper-mineralised igneous rocks which outcrop in an area located approximately 59 km south-west of Olary, the South Australian Government has completed detailed mapping, geochemical...-
Document
Published: 17 May 1977
-
RB 97/00008 South Australian Steel and Energy Project. Coober Pedy iron ore investigation. Regional bedrock drilling 1995.
Following the acquisition and interpretation of 435 line km of ground magnetic surveys over selected aeromagnetic anomalies within regions of high magnetic relief on the northern Gawler Craton, 121 reverse circulation holes totalling 8609.25 m were...-
Document
Published: 01 Jan 1997
-
RB 97/00002 South Australian Steel and Energy Project. Coober Pedy iron ore investigation. Sequoia, Gina and Wirrida prospects.
As part of the South Australian Steel and Energy Project, MESA has explored several significant aeromagnetic anomalies to try to find a possible iron ore resource. The Sequoia, Wirrida and Gina magnetic anomalies were chosen as indicating...-
Document
Published: 01 Feb 1997
-
RB 97/00001 South Australian Steel and Energy Project. Coober Pedy iron ore investigation. Summary report.
Mines and Energy South Australia, as part of its contribution to the South Australian Steel and Energy Project, has defined an iron ore resource in the Coober Pedy region. Extensive ground magnetic, gravity and drilling programs identified four...-
Document
Published: 01 Dec 1996
-
Port Broughton, Redhill and Mount Remarkable - Port Augusta areas (part of the Moonta North Project ELs combined reporting group). Annual reports and joint final report at licences' surrender, for the period 19/4/2002 to 22/5/2006.
Economic deposits of iron-oxide associated copper-gold mineralisation of the Moonta-Wallaroo or Olympic Dam style, hosted in Palaeoproterozoic basement rocks of the Moonta Sub-domain, were targeted by exploration in three now surrendered licences,...-
Document
-
Mount Carulina and Trapeze Hill (the Oodnadatta Project). Joint annual reports plus succeeding single licence annual reports to licence expiry/full surrender, for the period 6/3/1995 to 12/10/2009. [ Index Part 2 of 2 ].
[ Note - here is Part 2 of the abstract relating to 2 separately indexed parts ]. A new joint venture with Barrick Gold, pertaining to the renewed (as EL 3424) tenement, was signed on 8/2/2007, after which that company as operator undertook a 749...-
Document
Published: 09 Feb 1910
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-59, Kalkaroo Dome fault-hosted gold mineral prospects. Project final report.
The main aim of Havilah Exploration's PACE Initiative Year 3 approved drilling programme was to test the east-west trending, quartz-veined breccia zone that passes through the central Kalkaroo Dome, specifically in the footwall of the Kalkaroo Cu-Au...-
Document
-
Lake Moolkra. Annual and final reports to licence expiry/full surrender for the period 24/5/2002 to 21/2/2006.
No field work was performed over a small licence area located approximately 40 km east-southeast of Tarcoola, where an E-W elongated intense magnetic anomaly corresponds to a low hill of outcropping banded iron formation with an eastwards extension...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-44, Wilgerup (southern Gawler Craton) haematitic iron ore prospect. Project final report.
Centrex Metals commenced reverse circulation exploration and resource definition drilling at the Wilgerup iron ore deposit on 6/9/2006, which was partly funded by the PACE Initiative as a Year 3 approved project, with funds allocated for 1000 m of RC...-
Document
Published: 20 Apr 1907
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 3 partnership no. DPY3-28, Mount Woods IOCG Project mineral prospect. Project final report.
PACE Initiative Year 3 drilling project funds were secured by Goldstream Mining to explore for base metals and gold within two licence areas taken out over concealed Proterozoic basement of the Mt Woods Inlier, and which also cover parts of the Coober...-
Document
Published: 12 Dec 1906
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-40 - western Middleback Range region - Stony Hill area Archaean to Proterozoic stratabound iron ore mineral prospects. Project final report.
Banded iron formation (BIF) rock outcrops and an associated 15 km long aeromagnetic anomaly located about 20 km west of Iron Baron were chosen by Centrex Metals as high quality targets deserving of exploration for economic iron mineralisation...-
Document
Published: 28 Nov 1908
-
Bulgunnia, Gosse and Kingoonya (the Mentor Project). Data release made at the surrender of subsequent licences : annual reports for the period 27/10/1992 to 15/11/1997. [Index entry Part 1 of 2 - a very long abstract is split between these two parts].
The Gawler Joint Venture partners (Dominion Mining and Resolute Resources) have been exploring three near-contiguous areas located in the north of the Tarcoola - Kingoonya district, seeking possible economic concealed epithermal/mesothermal...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Hope. Annual reports for the period 12/4/2002 to 14/3/2019.
Exploration of an area located on western Eyre Peninsula between Sheringa and Mount Hope is continuing, with the intent of discovering economic buried base and precious metal deposits of volcanogenic sediment-hosted massive sulphide (VHMS) style...-
Document
-
Data release [made at SA Director of Mines' discretion] : Manunda. Annual reports submitted until the commencement of joint reporting on the Razorback Ridge Iron Ore Project, for the period 10/12/2007 to 9/12/2009.
The banded iron formations associated with various tillite in South Australia have been recognised as being potential sources for iron however the low-grade nature of these bands has been one of the limiting factors in why they have not been...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Johns Outstation / Giffen Well. Annual reports for the period 8/10/2007 to 7/10/2018.
To date, land access restrictions imposed by the Commonwealth Department of Defence have prevented any field work from occurring on the subject tenement, taken up to cover the Giffen Well magnetite iron ore deposit and adjacent inferred prospective...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Woods (part of the Mount Woods Joint Venture Project). Annual reports for the period 19/12/2000 to 30/1/2011. [ Index Part 2 of 2 ].
During the 2006 reporting period for renewed Mount Woods EL 3518 (i.e. for licence Year 6), Goldstream conducted ongoing exploration that included campaigns of diamond, RC, RAB and AC drilling, plus, in relation to the possible iron ore / copper-gold...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Tarcoola. Annual reports for the period 2/6/2008 to 29/7/2018.
During the first year of renewed EL 4167, in October and November 2008, Stellar Resources Ltd ("Stellar") completed a 5 hole, 1286.9 m RC and 2 hole, 157.1 m diamond cored inclined drilling programme at the Coolybring prospect which is located...-
Document
Published: 11 Sep 1918