Mount Gunson, Woocalla, Bernard Hill, Mount Moseley and Emmie Bluff (the Mount Gunson Project). Respective second to fourth partial surrender reports, for the overall period 15/7/1994 to 12/10/2004.
No work has been undertaken on the currently relinquished portions of ELs 3112, 2639, 3008 and 3022. However, as an attachment to the current EL 3112 relinquishment report, all technical data for Stuart Metals' recent diamond drillhole MGD24 (to...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-36, Roopena area copper/gold mineral prospects. Project interim and final reports.
Three previously untested, significant gravity anomalies were the targets for 4 exploratory vertical RC drillholes totalling 750 m, put down in areas west and north-west of Whyalla by Minotaur Exploration with funding assistance from PIRSA through its...-
Document
-
Data release - as updated : Sunset Hill. Annual reports and final report to licence full surrender, for the period 24/11/2008 to 13/4/2017.
An area taken up to comprise the middle member of a block of three tenements located in the Myall Creek region ~ 30 km west-southwest of Port Augusta has been explored for possible economic buried stratabound copper sulphide mineralisation as well as...-
Document
Published: 23 May 1917
-
Maitland. First partial surrender report, for the period 25/8/2008 to 24/8/2015.
58 square km of the Area C southernmost sub-block of EL 5320 have been relinquished to compensate for a shortfall in exploration spending against commitments. During the past seven years, the only work performed on the relinquished ground was the...-
Document
Published: 20 Mar 1916
-
Chinaman Hat Hill. First annual report plus final report to licence full surrender, for the period 20/6/2013 to 18/12/2014.
No work performed. A desktop assessment of indicated IOCG prospectivity concluded that the tenement, located ~ 16 km north of Tasman Resources' Titan prospect, had high risk due to a muted basement geophysical response and the poorly constrained but...-
Document
Published: 21 Jan 1915
-
Alford South (part of the Alford Project). Annual reports to licence expiry/full surrender, for the period 7/1/2014 to 6/1/2016.
An area on northern Yorke Peninsula centred ~16 km south-west of Alford and 9 km north-northeast of Wallaroo has been explored for possible buried economic IOCG type mineralisation which could have formed within Palaeoproterozoic or younger basement...-
Document
Published: 14 Mar 1916
-
Data release - as updated : Crystal Brook and Port Pirie (the Wandearah Project). Joint annual reports to licences' respective full surrenders, for the period 2/8/2008 to 26/4/2018.
Buried basement-hosted iron oxide - associated copper-gold (IOCG) mineralisation of either Moonta-Wallaroo or Olympic Dam style is the target of ongoing exploration on the two adjacent subject tenements. In addition, the current holder considers that...-
Document
Published: 29 May 1918
-
Data release - as updated : The Lake Torrens JV Project. Joint annual reports, plus final report at the joint full surrender of two of the three remaining project licences, for the period 1/1/2012 to 13/10/2018.
During the 2012 Project year, Tasman Resources Ltd (Tasman) carried out the following exploration activities: • obtaining from the Kokatha Native Title claimant group's representatives, after considerable effort, some restricted Aboriginal heritage...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Oak Dam North-east. Annual reports for the period 18/1/2006 to 17/1/2011.
A relatively large but little-explored area of the central-eastern Stuart Shelf, which is almost wholly covered by scrubby sand dunes and swampy salt lakes, thereby making surface access very difficult despite it being located only ~30 km to 50 km km...-
Document
Published: 16 Mar 1911
-
Data release - as updated : Maitland (the Yorke Peninsula Copper Project). Annual reports plus final report to licence expiry/full surrender, for the period 25/8/2008 to 24/8/2017.
An area of the western Yorke Peninsula, comprising three separate sub-blocks, was taken up to explore for possible economic buried IOCG-U deposits similar to those at Hillside (located 25 km to the east of sub-block 'B'), Olympic Dam, Prominent Hill...-
Document
Published: 18 Oct 1917
-
PACE 2020 Discovery Drilling 2012 : Year 7 Drilling Partnership no. DPY7-18 - Phoenix Copper Limited Yorke Peninsula Project. Drilling project final report.
Phoenix Copper is exploring tenements which cover an area of approximately 802 square km on the west coast of the Yorke Peninsula, the company's prime objective being to discover an economic iron oxide - associated copper-gold-uranium (IOCGU) deposit...-
Document
Published: 13 Nov 1912
-
Pernatty [Station] (part of the Punt Hill Project). First partial surrender report at licence expiry/renewal, for the period 29/11/2005 to 7/5/2016.
Two separate sub-areas formerly comprising 33% of a licence area located between Pernatty Lagoon and the southern end of Lake Torrens have been relinquished by licensee Monax Mining. The exploration objective for holding this ground previously had...-
Document
Published: 27 Jun 1916
-
Data release - as updated [made at SA Director of Mines’ discretion] : Glenside. Annual reports to licence expiry/renewal, for the period 5/12/2005 to 4/12/2010.
An area centred approximately 40 km south of the Andamooka Opal Field and 50 km south-east of the Olympic Dam mine is being explored for possible buried economic Olympic Dam or Prominent Hill type IOCG-U mineralisation as well as for possible...-
Document
Published: 28 Jan 1911
-
Data release [made at SA Director of Mines’ discretion] : Weetulta. Annual reports for the period 16/9/2005 to 15/9/2009.
EL 3413, surrounding the township of Weetulta on the Yorke Peninsula, is located geologically along the prospective south-eastern margin of the Gawler Craton. The licence area, which lies only about 10 km south of Moonta, has several historic mines...-
Document
Published: 20 Oct 1909
-
Data release - as updated [made at SA Director of Mines' discretion] : Pernatty [Station] and Yeltacowie (the Punt Hill IOCG Project). Joint annual reports for the period 29/11/2009 to 6/1/2012.
Two adjoining licence areas located in the country east of Pernatty Lagoon that lies between 80 and 180 km north of Port Augusta are being explored by Monax Mining Limited (Monax) for economic Proterozoic basement-hosted Iron-Oxide associated...-
Document
Published: 21 Jun 1912
-
Data release - as updated [made at SA Director of Mines' discretion] : Mullaquana (part of the Mullaquana, later called Samphire, Uranium Project). Annual reports for the period 20/11/2009 to 19/11/2018.
During licence Year 4, UraniumSA undertook the following work on EL 3652: - pattern drilling of 232 rotary mud holes totalling 18,416 m, targeting the Blackbush and Plumbush prospects. - core drilling totalling 876 m in 8 holes, to characterise...-
Document
Published: 03 Dec 1918
-
Finniss Springs. Annual reports plus final report to licence expiry/full surrender, for the period 20/1/2012 to 19/1/2015.
A large area centred ~60 km west of Marree, near the south-eastern margin of Lake Eyre South, has been explored for possible buried economic sedimentary type base metal mineralisation which may have formed in the Adelaidean cover sequence, as well as...-
Document
Published: 10 Apr 1915
-
Data release - as updated [made at SA Director of Mines' discretion] : Ardrossan, Minlaton and Ardrossan coast areas (the Pine Point Project). Joint annual reports for the period 2/8/2008 to 1/8/2014.
Rex Mineral’s ('Rex') primary objective in the Pine Point Project area is to determine the potential for economic basement-hosted iron oxide - associated copper-gold mineralisation such as that found at Olympic Dam, Prominent Hill, Ernest Henry and...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Island Dam, Stuart Shelf and Andamooka Ranges (the Stuart Shelf Project). Joint annual reports for the period 11/10/2009 to 30/6/2018.
Exploratory drilling carried out by BHP Billiton (BHPB) during the 2009-10 project reporting year took place at six prospects thought to have good IOCG mineralisation potential, based in part on earlier drilling results and also on refined target...-
Document
Published: 30 Aug 1918
-
Data release - as updated [made at SA Director of Mines' discretion] : Alford. Annual reports to licence expiry/renewal, for the period 25/10/2007 to 4/11/2012.
Work performed at the Alford Project, until the latter half of 2007, had so far mainly concentrated on the Netherleigh Park prospect, with the density of drilling there now providing the main insights into prospectivity and controls on mineralisation....-
Document