-
Mount Paisley (part of the Mount Woods Joint Venture Project). Second partial surrender report for the period 23/3/2000 to 8/8/2006.
Within the relinquished licence area, no geophysical anomalies were recognised within deeply buried Proterozoic basement that might represent possible craton margin magmatic nickel or IOCG type exploration targets. A review of previous exploration...-
Document
Published: 16 Oct 1906
-
Wirrida (part of Minotaur's Commonwealth Hill joint venture project). Annual and final reports to licence expiry/full surrender for the period 29/9/1997 to 16/10/2006.[Index entry Part 1 of 2 - a very long abstract is split between these two parts].
Exploration of a long-held tenement package in the northern Gawler Craton was directed primarily at gold and also at platinum group metals, in specific work programmes executed under separate early joint venture arrangements made with Gawler Gold and...-
Document
Published: 10 Jan 1907
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-17, Mount Moulden and Mount Harcus mineral prospects. Project final report.
As part of the PACE Year 2 collaboration between PIRSA and the minerals industry, PepinNini Minerals proposed and was granted part subsidy funding for an extensive drilling programme in the western APY Aboriginal Lands of South Australia, to examine...-
Document
Published: 16 Jun 1906
-
Ki Ki (part of the Coonalpyn Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 14/10/1999 to 17/1/2009.
To investigate the possible Cu-Ni-PGE mineral sulphide mineralisation potential of a known buried mafic / ultramafic layered igneous intrusive complex situated within the Cambrian Kanmantoo Trough near Ki Ki in the upper South-East, the licensee and...-
Document
Published: 23 Feb 1909
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-42, Talia Hill area (Harris Greenstone Domain) copper-nickel and platinum group elements mineral prospects. Project final report.
In December 2005 Mithril Resources completed five RC percussion drillholes totalling 682 m on three 100 m - spaced traverses, as one of the approved PACE Initiative Year 2 subsidised drilling projects. This drilling was intended to test a surface TEM...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-32, Ki Ki intrusion mafic/ultramafic - hosted mineral prospects. Project final report.
To further investigate the Cu-Ni-PGE mineral sulphide potential of a known buried mafic / ultramafic layered igneous intrusive complex situated near Ki Ki in the upper South-East, the licensee of EL 3295 sought PACE Initiative funding to complete two...-
Document
-
Manguri (part of the Mount Woods Joint Venture Project). Annual reports and final report to licence surrender, for the period 13/12/1999 to 4/10/2006.
Possible craton margin magmatic nickel deposits or iron oxide - associated copper-gold (IOCG) type large base and precious metal deposits within buried Proterozoic basement were targeted in an area lying just to the north-west of Coober Pedy. Delays...-
Document
Published: 20 Nov 1906
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-15, Peake and Denison Inliers western flank Mesozoic sedimentary uranium mineral prospects. Project final report.
Approved PACE Initiative Year 3 drilling proposal DPY3-15 aimed to discover a roll-front style uranium deposit hosted in Mesozoic sandstones flanking the exposed radiogenic Peake and Denison Inliers, that is amenable to mining by in-situ leach...-
Document
Published: 13 Apr 1907
-
Black Hill Intrusive Complex (northern [Bower - Florieton] and southern [Cambrai] areas). Joint annual report plus final report to licences' joint expiry/full surrender, for the period 17/2/2005 to 16/2/2007.
Inco Resources has been exploring the outcropping portion of the Ordovician Black Hill Intrusive Complex for possible Voisey's Bay style nickel, copper and platinum group element (PGE) mineralisation since 2004, when it signed a joint venture...-
Document
-
Weekeroo North. Progress and final reports to licence surrender for the period 1/8/1968 to 31/7/1970.
Exploration carried out by MIM to look for possible economic primary or secondary uranium deposits related to the Weekeroo Inlier of Palaeoproterozoic rocks has consisted of an airborne radiometric survey (750 line miles flown along E-W lines spaced...-
Document
Published: 31 Jul 1970
-
Coffin Bay (originally part of the Wanilla JV Project). Annual reports plus final report to licence expiry/full surrender, for the period 3/3/2005 to 2/3/2010.
A tenement in the Coulta district of south-western Eyre Peninsula has lately been explored by International Metals, after its prior research had outlined seven areas there as being of prime interest in a search for Archaean greenstone units which...-
Document
Published: 20 May 1910
-
Frome River (part of the Copley Ni/Cu Project). Annual, partial surrender and final reports to licence expiry/full surrender, for the period 9/10/2006 to 8/10/2009.
In a search for possible Voiseys Bay style magmatic nickel-copper mineralisation within an area of historical small scale surface mining activity located approximately 60-70 km north-east of Leigh Creek, the licensee conducted a brief campaign of...-
Document
-
Poochera. Second partial surrender report, for the period 14/2/2002 to 3/6/2008.
Report contains only drillhole basic geological and geochemical data that is relevant to the now relinquished licence subareas.-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-18. Western Musgrave Province - Mount Caroline area magmatic nickel-copper-PGE and stratiform or epithermal / hydrothermal base metal mineral prospects. Final report.
In late 2008 PepinNini Minerals completed a stratigraphic drilling programme in the western Musgrave Province as an approved PACE Initiative Year 5 collaborative project with PIRSA. The programme was designed to investigate the Mount Caroline...-
Document
Published: 20 Jan 1909
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-19. White Hill igneous complex Proterozoic magmatic PGE-Ni-Cu mineral prospects. Project final report.
Following a review of historic exploration data for the Mount Woods Inlier, OZ Minerals decided that the White Hill igneous complex, located 6 km north-west of the Prominent Hill mining lease, is comprised of mafic and ultramafic cumulate rocks having...-
Document
-
Wirrida (part of Minotaur's Commonwealth Hill joint venture project). Annual and final reports to licence expiry/full surrender for the period 29/9/1997 to 16/10/2006.[Index entry Part 2 of 2 - a very long abstract is split between these two parts].
Abstract (Continued from Part 1): Because of the presence of the highest gold concentration at the eastern end of the Target 14 aircore drill traverse, potential remains for delineating further mineralisation at this locality. In addition, the...-
Document
Published: 10 Jan 1907
-
PACE 2020 Discovery Drilling 2012: Year 7 Drilling Partnership DPY7-15 - NiCul Minerals Limited, Central Musgrave Project, Woodroffe and Cooperinna areas Proterozoic basement magmatic Ni-Cu-Co-PGE sulphide mineralisation targets. Drilling final report.
Early in 2012, explorer NiCul Minerals Limited (NiCul) sought PACE Initiative funding from the South Australian Government to help it undertake a programme of stratigraphic and targeted mineral exploration drilling within EL 3931 Woodroffe and EL 4587...-
Document
-
PACE 2020 Discovery Drilling 2012 : Year 7 Drilling Partnership no. DPY7-27 - Endeavour Copper Gold Pty Ltd, Tarcoola Project, Harris Greenstone Domain magmatic nickel - prospective ultramafic targets. Drilling project final report.
The principal mineral exploration target for Endeavour Copper Gold Pty Ltd ('Endeavour') on the three subject Tarcoola Project exploration licences is nickel sulphide mineralisation hosted by Archaean ultramafic intrusive rocks within the Harris...-
Document
-
Bookabie. Annual reports to licence expiry/full surrender, for the period 8/10/2013 to 7/10/2016.
An area centred ~85 km west-northwest of Ceduna has ben explored for possible buried Ni±Cu±Co±Cr±PGE mineralisation of either Thomson Nickel Belt or Nova-Bollinger deposit styles, that may be associated with ultramafic–mafic rocks at four prospects...-
Document
Published: 07 Nov 1916
-
Pine Ridge (part of the Central Giles Nickel Project). Annual reports and final report to licence surrender, for the period 30/3/2007 to 9/6/2015.
A licence area located in South Australia's Far North-west Aboriginal Lands, approximately 140 km north-west of Marla, has been explored primarily for massive magmatic nickel sulphide deposits possibly associated with the Proterozoic Giles Complex...-
Document