-
Coomandook and The Coorong [East] (part of the Padthaway Project). Final report at licences' joint full surrender, for the period 27/3/2014 to 26/3/2017.
The licensee's compilation of existing geological, geochemical and geophysical data has indicated to it that the Padthaway area is fertile for volcanogenic massive sulphide (VMS) style polymetallic mineralisation, with economic deposits possibly...-
Document
Published: 16 May 1917
-
Burra Project licence group. Data release made in lieu of submitting partial surrender reports for ELs 6102, 6103, 6158, 6305 and 6306 : joint annual reports for the period 25/1/2018 to 2/12/2020 plus initial annual annual report.
To date exploration in the Burra region of the Adelaide Geosyncline has focussed on historic copper-gold oxide workings, with the aim of delineating further mineralisation along strike, or sulphide mineralisation at depth. Lately however, rather than...-
Document
Published: 04 Feb 1921
-
Maitland. First partial surrender report, for the period 25/8/2008 to 24/8/2015.
58 square km of the Area C southernmost sub-block of EL 5320 have been relinquished to compensate for a shortfall in exploration spending against commitments. During the past seven years, the only work performed on the relinquished ground was the...-
Document
Published: 20 Mar 1916
-
Menninnie Dam (part of the Fleurieu - Menninnie Dam Exploration Joint Venture Project). Combined annual report for the 5-year period 24/9/2005 to 26/10/2010, plus annual reports for the period 27/10/2010 to 26/10/2012.
During the 5-year period 2005-2010, intensified exploration undertaken at Menninnie Dam was focussed on the discovery and delineation of structurally controlled hydrothermal Pb-Zn-Ag mineralisation. Carbonate-rich Hutchison Group metasediments forming...-
Document
-
The Hummocks. Annual reports and final report to licence full surrender, for the period 30/6/2009 to 17/8/2017.
EL 4278 was Southern Uranium's first mineral exploration foray into the northern Yorke Peninsula. The subject tenement was pegged in January 2009 in order to secure ground surrounding the northern reaches of the Pine Point Fault. This particular...-
Document
Published: 31 Aug 1917
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Double. Annual reports for the period 24/11/2005 to 28/9/2018.
Exploration is being conducted for possible buried economic iron oxide - associated copper-gold (IOCG) mineral deposit targets within the south-central Gawler Ranges. During the first licence year, Minotaur's activities focussed on completing a...-
Document
Published: 22 Nov 1912
-
Data release - as updated [made at SA Director of Mines' discretion] : Wartaka, Iron Knob, Reid Lookout and Old Wartaka (the Parkinson Dam Project). Annual reports and joint annual reports for the period 17/2/2005 to 26/4/2019.
Four small, adjacent licences located on the south-eastern, shallow subcrop margin of the Gawler Ranges, which together make up an area centred about 25 km north-east of Lake Gilles and 60 km west of Port Augusta, are being explored for possible...-
Document
Published: 30 Apr 1918
-
Data release : Yeltacowie, Pernatty [Station] and Whittata (the Punt Hill IOCG Project). Joint annual reports, plus final report to expiry of EL 5774 Punt Hill, for the period 7/1/2012 to 6/1/2017.
During the eighth, 2012-2013 year of tenure of the Pernatty EL area, now being explored in concert with two other adjoining Punt Hill IOCG Project licences, Monax reviewed its past drillhole data, undertook further processing of the project's amassed...-
Document
Published: 29 Aug 1917
-
Macclesfield (part of the Mount Barker Project). Annual reports and final report to licence expiry/full surrender, for the period 6/4/2016 to 5/6/2019.
An area surrounding the township of Macclesfield, and lying a short distance south-east of Terramin Limited's Bird-in-Hand historic gold mine redevelopment project, has been explored for inferred sediment-hosted primary gold mineralisation that may...-
Document
Published: 13 Jun 1919
-
Echunga (part of the Mount Barker Project). Annual reports, first partial surrender report and final report to licence full surrender, for the period 7/7/2016 to 5/6/2019.
An area surrounding the historic Echunga goldfield locality, and lying a short distance south-east of Terramin Limited's Bird-in-Hand historic gold mine redevelopment project, has been explored for inferred sediment-hosted primary gold mineralisation...-
Document
Published: 13 Jun 1919
-
Meadows (part of the Mount Barker Project). First annual report plus final report to licence expiry/full surrender, for the period 20/4/2017 to 19/4/2019.
A small area covering part of the Meadows Fault scarp and part of the adjoining Tertiary-Recent Meadows Basin has been explored for inferred sediment-hosted primary gold mineralisation that may have formed in favourable Neoproterozoic bedrock...-
Document
Published: 13 Jun 1919
-
Bangor. Combined first annual/final report at licence full surrender, for the period 23/8/2018 to 22/11/2019.
A large area centred ~20 km east-northeast of Port Germein, covering ground at the southern end of the Flinders Ranges, has been explored for possible altered sediment - hosted gold deposits of disseminated, Carlin style which are genetically...-
Document
Published: 14 Oct 1919
-
Wirrealpa. Progress, partial surrender and final reports to licence surrender for the period 13/11/1978 to 26/2/1988.
Economic deposits of Mississippi Valley type stratabound lead-zinc mineralisation within in Cambrian limestones were the targets of exploration undertaken on and near the Wirrealpa Diapir. A preliminary field reconnaissance had shown that surface...-
Document
-
Pandurra. Progress reports and final report to licence expiry/renewal, for the period 18/9/1979 to 17/9/1981.
Continued exploration for stratabound base metals across an area of the southern Stuart Shelf, extending west and north-west of Port Augusta, has included an evaluation of the results of previous stratigraphic drilling on the prior-held EL 332, plus...-
Document
Published: 16 Nov 1981
-
Flinders Ranges Joint Venture (Esso / BHP) - drilling programmes.
Drilling included : at the Linda prospect - 20 reverse circulation holes (total 502 m) and 2 diamond holes (total 301 m); at the Wilnuroona prospect - 7 reverse circulation holes (total 370 m); at the Eric prospect - 107 RAB holes (total 1107 m)...-
Document
Published: 01 Jan 1985
-
Data release [made at SA Director of Mines' discretion] : Mount Ive Project. First annual report, for the period 1/1/2016 to 31/12/2016.
The “Mt Ive Project” forms the western part of the “Gawler Ranges Project”. The “Gawler Range Project” comprises 11 tenements covering a total area of 4,749 km2 in northern Eyre Peninsula. All 11 tenements are licenced to and operated by Menninnie...-
Document
-
Flinders Project. Exploration for carbonate-hosted base metals in the Flinders Ranges, South Australia.
An EL farm-out promotional document which summarises BHP's recent integrated exploration activity over 7 ELs in the Flinders Ranges, looking for Mississippi Valley type base metal mineralization in Cambrian age sediments, and which nominates prospects...-
Document
-
Cattlegrid copper mine. Mineragraphy of ore processing mill feed and product samples, as submitted for examination on a monthly basis over the period October 1974 to May 1983.
The included mineralogical reports and explanatory prior company correspondence give the results of, and rationale behind, a lengthy programme of mill product sampling and sample description for weekly to monthly process monitoring throughflow samples...-
Document
Published: 13 May 1983
-
Ediacara. Progress reports and technical reports for the period November 1962 to April 1967.
TARGET: Mississippi Valley - type stratiform lead and copper mineralisation formed near the base of the Cambrian sedimentary sequence on the Ediacara structure. EXPLORATION: Initially, in 1962, the company reviewed the progress of then occurring SADM...-
Document
Published: 12 Apr 1967
-
Mount Chambers. Progress and technical reports to licence expiry/full surrender for the period 13/9/1988 to 12/9/1989.
TARGET: Downdip extensions of known Cambrian stratabound mineralisation occurring at the Eric lead-zinc prospect, principally along a mineralised, disconformable interpreted syn-depositional palaeosurface developed within the Wilkawillina Limestone....-
Document
Published: 14 Nov 1989