-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-63, Mongolata area epithermal gold and base metal mineral prospects. Project final report.
An observed trend between base metals anomalism in soils and previously identified magnetic and gravity anomalies within inferred Adelaidean basement metasediments present within the eastern part of Mongolata EL 3164 provided the impetus for the...-
Document
-
Weekeroo North. Progress and final reports to licence surrender for the period 1/8/1968 to 31/7/1970.
Exploration carried out by MIM to look for possible economic primary or secondary uranium deposits related to the Weekeroo Inlier of Palaeoproterozoic rocks has consisted of an airborne radiometric survey (750 line miles flown along E-W lines spaced...-
Document
Published: 31 Jul 1970
-
Mount Wedge. Final report at licence expiry/full surrender, for the period 27/1/2009 to 26/1/2011.
An area surrounding Mount Wedge in the Polda district, 30 km north-east of Elliston, was taken up to explore for possible economic Tertiary heavy mineral sands deposits. However, the results of an internal review of the tenement's prospectivity, based...-
Document
Published: 16 Aug 1911
-
Pureba Conservation Park, Nunnyah Conservation Reserve, Koolgera Conservation Reserve, Jellabinna, Ooldea South and Ooldea Range (part of the Eucla Basin Project). Joint first partial surrender report, for the period 27/10/2004 to 31/1/2009.
Exploration for possible economic heavy mineral sands carried out by Iluka Resources within the now relinquished portions of its multi-licence acreage has comprised aircore drilling of the Cainozoic sedimentary sequence (173 holes for a total...-
Document
Published: 31 Jan 1909
-
Mount Denison and Mount Charles (the Peake and Denison Project). Data release upon the expiry/full surrender of subsequent licences : respective annual and combined annual reports for the period 1/6/1994 to 31/5/1999. [ Index Part 2 of 2 ].
[ Note - here is only Part 2 of an abstract relating to 2 separately indexed parts ]. During the latter half of 1997, just before it transferred project management to BHP Minerals, Renison Gold Corp. carried out reconnaissance bedrock geochemical...-
Document
-
Data release - as updated : Edward Creek (part of the Edward Creek Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 23/9/2008 to 11/11/2018.
Reedy Lagoon Corp. (RLC) has continued to look for minerals other than diamond, operating as the manager of exploration work for base metals (mainly copper) and uranium that was undertaken by the Edward Creek Base Metal Joint Venture (“ECBMJV”) during...-
Document
-
Mount Miccollo, Tin Hut Hill, Eurilla Dam, Wilcherry Hill, Uno, Peterlumbo and Mount Double (the Wilcherry Hill Project). Joint annual reports for the period 1/11/2002 to 31/10/2018.
During Year 6 of the project, Trafford Resources designed their drilling program to test the extent of the Pb/Zn/Ag/U mineralisation at the Telephone Dam Prospect, while JV partners Ironclad Mining’s drilling program was designed to define the Direct...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Woods (part of the Mount Woods Joint Venture Project). Annual reports for the period 19/12/2000 to 30/1/2011. [ Index Part 2 of 2 ].
During the 2006 reporting period for renewed Mount Woods EL 3518 (i.e. for licence Year 6), Goldstream conducted ongoing exploration that included campaigns of diamond, RC, RAB and AC drilling, plus, in relation to the possible iron ore / copper-gold...-
Document
-
Barton, Barton Range North and Paling Range, plus Wells and north-eastern Eucla Basin licence Areas A through Y (Iluka's Eucla Basin Heavy Mineral Sands Project tenement Group 4). Joint annual reports for the period 19/10/2009 to 31/12/2015.
During the 2009-2010 project reporting year, Iluka completed exploration work costing $5,200,532 across its combined thirty-one Group 4 tenements, to assess the north-eastern Eucla Basin's sediment stratigraphy and heavy mineral sand (HM) potential...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Uley. Annual reports for the period 16/9/2005 to 12/10/2018.
A licence area located 20 km west-southwest of Port Lincoln, which covers the historically worked Uley graphite deposit and environs, was taken up to try to delineate sufficient mineral resources and, eventually, ore reserves of graphite in the Mining...-
Document
Published: 25 Mar 1919
-
Lake Gilles. Progress reports to licence expiry/full surrender, for the period 19/5/1969 to 18/5/1970.
Exploration for possible economic hypogene base metal sulphide deposits associated with poorly exposed iron-rich linear outcrops, overlying faulted Archaean to Palaeoproterozoic basement which is obscured by extensive Cainozoic sedimentary cover rocks...-
Document
Published: 01 Apr 1970
-
Lake MacFarlane. Combined first annual / final report at licence expiry/full surrender, for the period 20/1/2016 to 19/1/2017.
Laboratory analysis of 18 samples of groundwater seepage brine collected from Lake MacFarlane during June-July 2016 indicated that the lake was unlikely to host an economically viable potash resource, and therefore the mineral exploration licence...-
Document
Published: 30 Nov 1916
-
Burra Project licence group. Data release made in lieu of submitting partial surrender reports for ELs 6102, 6103, 6158, 6305 and 6306 : joint annual reports for the period 25/1/2018 to 2/12/2020 plus initial annual annual report.
To date exploration in the Burra region of the Adelaide Geosyncline has focussed on historic copper-gold oxide workings, with the aim of delineating further mineralisation along strike, or sulphide mineralisation at depth. Lately however, rather than...-
Document
Published: 04 Feb 1921
-
Unalla Hill, Moonaree and South Lake Gairdner (Lake Gairdner Project). Annual and final reports for the period 25/10/96 to 24/10/99.
Exploration targeted Olympic Dam style mineralisation associated with Hiltaba Suite intrusives and Gawler Range Volcanics at the southern end of Lake Gairdner, between Mount Ive and Moonaree. Sampling of poorly developed calcrete together with rock...-
Document
Published: 02 Dec 1998
-
Prince Alfred mine. First annual report to licence full surrender and re-issue as part of a larger tenement, for the period 26/10/1996 to 9/4/1998.
Assays of tailings heaps at the Prince Alfred Mine, located 40 km north-east of Carrieton, returned 1-1.5% Cu. Up to 12.7 % Cu was recorded from rock sampling, and elevated Au and anomalous Cu were recorded in calcrete samples. Four areas of...-
Document
Published: 15 Dec 1997
-
Strathearn, Yarramba, South Eagle and Billeroo Creek areas (part of the Strathearn Joint Venture Project). Data release in lieu of partial relinquishment at licence expiry/renewal : progress and annual reports for the period 3/5/1991 to 9/4/2000.
Exploration carried out in the South Eagle - Yarramba area, located 40-80 km north-east of Olary and 50-150 km west-northwest of Broken Hill, has targeted stratabound Pb-Zn-Ag and Cu-Au mineralisation in Proterozoic rocks of the Willyama basement....-
Document
-
South Eagle. Data release made at transfer of licence ownership : annual reports for the period 17/9/1997 to 16/9/2000.
The majority of mineral exploration undertaken in the South Eagle area, centred 40 km north-east of Olary, has targeted stratabound Pb-Zn-Ag, stratabound massive sulphide Cu-Zn-Co-Mn, and Cu-Au mineralisation that may have formed in Proterozoic rocks...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Mutooroo mine. Annual reports for the period 13/3/2000 to 1/11/2013.
Exploration Licence 2704 covering 23 square km surrounding the historic abandoned Mutooroo copper mine, located ~55 km east of Olary, was granted to Havilah Resources NL so that the company could assess the economic potential of the remaining sulphide...-
Document
Published: 02 Dec 1913
-
Data release - as updated [made at SA Director of Mines’ discretion] : Carappee Hill. Annual reports for the period 20/2/2010 to 19/2/2019.
The continuation during 2010 of exploration of the Palaeoproterozoic bedrock in a small area located 60 km west-northwest of Cowell has mainly consisted of the conduct of three shallow drilling campaigns and the examination and analysis of downhole...-
Document
Published: 25 Feb 1919
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Davies (part of the Central Giles / Wingellina Nickel Project). Annual reports for the period 24/9/2009 to 23/9/2018.
Field work performed on the subject tenement during licence Year 8 included the conduct of Aboriginal heritage clearance surveys by the APY Traditional Owners to grant access for geological mapping and the acquisition of a trial seismic survey, as...-
Document
Published: 23 Nov 1918