-
Data release - as updated : Bulgunnia. Annual reports and final report to licence expiry/full surrender, for the period 8/10/2007 to 7/10/2022.
An area centred approximately 70 km north-northeast of Tarcoola has been explored for possible economic buried basement-hosted IOCG style or other (e.g. Menninnie Dam and/or Mount Gunson type) altered rock facies - hosted metallic mineralisation,...-
Document
Published: 27 Oct 2022
-
Balta Baltana Creek (part of the Coober Pedy IOCG Project). Combined first annual/final report to licence expiry/full surrender, for the period 17/7/2013 to 16/7/2014.
An area of limited deep past drilling that is centred ~80 km east of Coober Pedy has been explored for possible buried economic IOCG mineralisation and also for buried magmatic nickel deposits. During the year, historic open file reports and...-
Document
Published: 30 Jun 2014
-
Lake Woorong (part of the Robin Rise Joint Venture Project). Annual reports to licence expiry/full surrender, for the period 20/10/2005 to 19/10/2009.
The Lake Woorong exploration licence, situated about 80 km south-west of Coober Pedy, covers portions of the Palaeoproterozoic Coober Pedy Ridge, an east-northeast trending magnetic block of variable magnetic intensity which separates the Mount Woods...-
Document
Published: 08 Apr 2010
-
PACE 2020 Initiative : PACE Targeting, Year 1 partnership no. 1 - Coober Pedy Project area, Coober Pedy [Eastern, Central and Western subareas] ground gravity survey. Project PT1-01 final report.
Teck Australia has been the successful recipient of a grant of subsidy funds under Year 1 of the SA Government's PACE 2020 Targeting initiative, to conduct strategic geophysical exploration in the northern part of the Gawler Craton near the southern...-
Document
Published: 15 May 2012
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 3 partnership no. DPY3-28, Mount Woods IOCG Project mineral prospect. Project final report.
PACE Initiative Year 3 drilling project funds were secured by Goldstream Mining to explore for base metals and gold within two licence areas taken out over concealed Proterozoic basement of the Mt Woods Inlier, and which also cover parts of the Coober...-
Document
Published: 12 Dec 2006
-
Manguri (part of the Mount Woods Joint Venture Project). Annual reports and final report to licence surrender, for the period 13/12/1999 to 4/10/2006.
Possible craton margin magmatic nickel deposits or iron oxide - associated copper-gold (IOCG) type large base and precious metal deposits within buried Proterozoic basement were targeted in an area lying just to the north-west of Coober Pedy. Delays...-
Document
Published: 20 Nov 2006
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-46, Coober Pedy Ridge southern margin (Robin Rise Project) IOCG mineral prospects. Project final report.
The approved PACE Initiative Theme 2 drilling proposal DPY3-46 was specifically designed to test for haematite-dominant iron oxide - associated copper-gold (IOCG) mineralisation in an area of the northern Gawler Craton where little past exploration...-
Document
Published: 07 May 2007
-
Ingomar Station and Phar Lap Outstation (part of Ingomar JV Project). Joint annual plus separate annual and final reports to licences' expiry/full surrender, for the period 13/6/2002 to 23/7/2007.
Work done on two licences covering inferred Challenger - type vein gold or Olympic Dam / Prominent Hill style IOCG mineralisation - prospective ground that is situated approximately 70 km to the south and south-east of Coober Pedy has been confined to...-
Document
Published: 22 Aug 2007
-
Data release - as updated : Lake Woorong. Annual reports to licence expiry/full surrender, for the period 8/6/2012 to 7/6/2019.
A large area centred ~80 km south-west of Coober Pedy has been explored for possible buried economic iron ore, including inferred DSO haematite mineralisation, and for base metal massive sulphide deposits that may have formed in Proterozoic basement...-
Document
Published: 30 Jul 2019
-
Data release - as updated [made at SA Director of Mines’ discretion] : Windy Valley. Annual reports to licence expiry/renewal, for the period 25/1/2010 to 24/1/2015.
An area centred over the south-central Coober Pedy Ridge tectonic feature, 55 km south-southeast of Coober Pedy township, is being explored for possible economic buried massive haematite and magnetite within either Proterozoic banded iron formation...-
Document
Published: 17 Mar 2015
-
Data release - as updated : Robin Rise. Annual reports plus final report to licence expiry/full surrender, for the period 9/5/2005 to 20/6/2019.
The Robin Rise exploration licence, centred approximately 35 km south-southwest of Coober Pedy, covers portions of the Palaeoproterozoic basement domain known as the Coober Pedy Ridge, an east-northeast trending magnetic block of variable magnetic...-
Document
Published: 30 Jul 2019
-
The Northern Gawler Project. Data release made in lieu of submitting partial surrender reports for ELs 5566 and 5567 upon renewal of those licences : joint annual reports for the period 1/2/2015 to 31/1/2020.
Portions of two tenements located to the south and south-east of Coober Pedy were relinquished at the start of 2020, and all mineral exploration data previously acquired by licensee Southern Iron on these tenements and on four others that now comprise...-
Document
Published: 28 May 2020