-
SADME/Amdel Project 1/1/209 : [petrographic] comparison of some Archaean and Proterozoic iron formations in SA. Progress reports 1 to 4, for the period December 1977 to July 1979.
A project to compare Gawler Craton iron formations of unknown age with those of known Archaean age (from geochronology) and with the Proterozoic, Lake Superior - type Middleback Range iron deposits has concentrated on characterising each formation by...-
Document
Published: 30 Jul 1979
-
Mount Sandy (part of the Stuart Range Joint Venture Project). Progress reports and final report to licence expiry/full surrender, for the period 3/5/1977 to 2/5/1978.
Following the first public announcement on 18/11/1976 by Western Mining Corp. of its giant Olympic Dam copper, gold and uranium discovery on Roxby Downs Station, Newmont Pty Ltd began a detailed assessment of the Stuart Shelf region of South...-
Document
-
Danae Hill (part of the Stuart Range Joint Venture Project). Progress reports and final report to licence full surrender, for the period 30/3/1977 to 31/7/1978.
Following the first public announcement on 18/11/1976 by Western Mining Corp. of its giant Olympic Dam copper, gold and uranium discovery on Roxby Downs Station, Newmont Pty Ltd began a detailed assessment of the Stuart Shelf region of South...-
Document
-
Coober Pedy. Annual reports and final report to licence full surrender, for the period 6/6/2005 to 3/4/2009.
An area located in the northern Gawler Craton, covering part of the Palaeoproterozoic Coober Pedy Ridge, a northeast-trending magnetic basement block that separates the Mount Woods Inlier to the south-east from the Mabel Creek Inlier to the north, has...-
Document
Published: 20 May 1909
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 4 partnership no. DPY4-07, Mirikata mineral prospects. Project final report.
The Mirikata EL 3537 joint venture partners, Newcrest Operations Ltd and PlatSearch NL, have completed a planned four hole drilling campaign over three separate magnetic and/or gravity anomalies located 30-40 km west-southwest of Prominent Hill on...-
Document
-
Warriner Creek. Annual reports and final report to licence expiry/full surrender, for the period 2/12/2010 to 1/12/2013.
A licence issued as three separate subareas that were centred approximately 110 km south-east of Coober Pedy and 25 km north-east of the Prominent Hill mine has been explored for possible buried economic IOCG-U mineralisation. No drillholes...-
Document
Published: 22 Nov 1913
-
Warriner Creek. Second partial surrender report, for the period 20/12/1999 to 8/2/2009.
Exploration for possible economic buried iron oxide - associated copper-gold (IOCG) deposits in two areas located approximately 100 km south-east of Coober Pedy has sought to delineate and test a number of linear and elliptical geophysical anomalies...-
Document
-
Warriner Creek and Trumpeter (part of the Lake Eyre Joint Venture Project). Annual reports plus later combined annual reports to licences' joint full surrender, for the period 20/12/1999 to 22/9/2010.
Exploration for possible economic buried iron oxide - associated copper-gold (IOCG) deposits in two areas located approximately 100 km south-east of Coober Pedy has sought to delineate and test a number of linear and elliptical geophysical anomalies...-
Document
Published: 05 Aug 1910
-
Balta Baltana Creek. Annual reports and final report to licence expiry/full surrender, for the period 2/1/2007 to 1/1/2012.
Exploration for possible economic base and precious metal deposits in buried basement rocks, and for possible sedimentary uranium mineralisation in overlying Jurassic-Cretaceous Eromanga Basin sediments, within an area centred about 80 km east of...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Mount Brady (part of the Mount Woods Project). Annual reports for the period 10/7/2007 to 9/7/2011.
A very small, ~90 square km licence area centred ~40 km south-east of Coober Pedy is being explored for possible economic IOCG or other types of metallic mineralisation that may have formed in concealed Proterozoic basement rocks. During the first...-
Document
-
Mount Paisley. Information status at licence expiry/full surrender, for the period 16/9/2014 to 15/9/2016 : no work performed.
There is no abstract created for this record-
Document
-
Leonard Rise. Information status at licence expiry/full surrender, for the period 27/4/2015 to 24/9/2015: no work performed.
There is no abstract created for this record-
Document
-
Warriner Creek. Annual report and final report to licence expiry/full surrender, for the period 16/4/2014 to 15/4/2016.
An area centred approximately 105 km east-southeast of Coober Pedy has been explored for possible economic buried IOCG-U type mineralisation. No field work was undertaken. Activities comprised in-house background research and a historic data...-
Document
Published: 13 Jun 1916
-
Halifax Hill. First annual report to licence expiry/full surrender, for the period 16/2/2010 to 15/2/2011.
An area located ~100 km south-east of Coober Pedy and ~29 km north-northeast of the Prominent Hill mine was taken up to explore for copper-uranium-gold-silver-rare earth element (Cu-Au-U-REE+/-Ag) mineralisation of the style typified at Olympic Dam...-
Document
Published: 18 Apr 1911
-
Data release [made at SA Director of Mines’ discretion] : Yarrabolina Hill. First annual report for the period 15/3/2010 to 14/3/2011.
A small licence area centred approximately 140 km south-east of Coober Pedy is being explored for possible economic buried Prominent Hill type IOCG deposits, magmatic nickel-copper sulphide and PGE mineralisation and Cairn Hill style metasomatic...-
Document
Published: 10 May 1911
-
Moolawatana. Quarterly and final reports for the period 26/8/75 to 25/8/76.
Ongoing copper/uranium exploration of basement and Willouran cover southwest of Moolawatana comprised ground magnetic, IP, EM and TEM surveys, airborne EM (Turair) and magnetic surveys, prospect-scale geochemical surveys and limited diamond drilling...-
Document
Published: 01 Nov 1977
-
Opaminda Creek. Quarterly and terminal reports for the period 17/11/1976 to 16/11/1978.
Adelaidean strata in the Mount Painter-Arkaroola area were investigated for stratiform copper, initially by North Flinders Mines and later in a joint venture with Western Mining Corp. Following a study of previous exploration data in the region, a...-
Document
Published: 09 Aug 1977
-
SML 705, Parabarana copper prospect. Final report.
There is no abstract created for this record-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-35, Mount Woods Inlier, Kangaroo Dam platinoid metals mineral prospect. Project final report.
A programme of five diamond drillholes totalling 1740.6 m has recently been completed on EL 3445 at the Kangaroo Dam prospect, to follow up anomalous platinum and palladium metal values encountered within the Palaeoproterozoic metasedimentary basement...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 1 partnership no. DPY1-45, Mount Purvis mineral prospect. Project interim and final reports.
A ~5 mGal residual gravity anomaly located near Mount Purvis, on the concealed eastern margin of the Mount Woods Inlier (north-eastern Gawler Craton), approximately 140 km east-southeast of Coober Pedy, was the target for a deep exploratory drillhole...-
Document