-
Data release [made at SA Director of Mines' discretion] : Dutton Bay. First annual report for the period 16/9/2005 to 15/9/2006.
There is no abstract created for this record-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Middlecamp Hills. Annual reports for the period 30/6/2009 to 29/6/2019.
Two small areas have been taken up in the Cleve Uplands district to explore structurally interesting portions of the Lower and Upper Middleback Jaspilite stratigraphic units for possible economic buried copper, gold, manganese and iron ore...-
Document
Published: 06 Aug 1918
-
Mosely Nobs. First partial surrender report for the period 3/3/2008 to 2/3/2009.
As part of a multi-commodity exploration programme being conducted in an area centred 15 km north of Kimba, an appraisal of the available geophysical data revealed no significant anomalies in the now relinquished portions of the licence. No other new...-
Document
Published: 06 Jul 1910
-
Data release [made at SA Director of Mines’ discretion] : Stony Hill (part of the Northern Eyre Peninsula Project). First annual report (submitted prior to start of the project's joint reporting status), for the period 2/12/2004 to 1/12/2005.
A licence area covering the subdued hilly terrain lying a short distance to the west of the northern Middleback Range on north-eastern Eyre Peninsula was taken up to explore for possible economic buried deposits of stratabound magnetite iron ore which...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Kimba Gap, Ironstone Hut, Ironstone Hill, Stony Hill, Gilles Downs and Minbrie areas (the Northern Eyre Peninsula Project). Joint annual reports for the period 2/12/2005 to 31/1/2013.
Exploration for possible economic occurrences of magnetite and/or haematite iron ore formed in concealed Proterozoic basement to the west of the Middleback Range is being carried out by Northern Eyre Peninsula Project (NEPP) joint venturer Centrex...-
Document
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 1 of 2].
Aquila Resources took up ownership of the much previously-explored ground comprising the Wilcherry Hill Project with the intent of exploring for the first time the iron oxide - associated copper-gold & uranium (IOCG-U) mineralisation potential of...-
Document
Published: 31 Dec 1908
-
Data release [made at SA Director of Mines' discretion] : Middleback Range. Annual reports for the period 5/10/1995 to 30/1/2007 [Index part 3 of 3].
During the 2006-2007 licence reporting year (Year 16), on renewed EL 3516 Middleback Range, incoming new licensee OneSteel determined from a review of BHP Billiton's drilling database that some 3.1 Mt of JORC 'inferred' category iron ore (haematite)...-
Document
Published: 25 Jan 1908
-
Data release [made at SA Director of Mines' discretion] : Middleback Range. Progress reports and annual reports to licence expiry/renewal, for the period 6/6/1990 to 5/6/1995.
A licence area consisting of two separate sub-blocks that cover ~460 square km of Palaeoproterozoic BIF ironstone outcrops in the northern and southern parts of the Middleback Range on north-eastern Eyre Peninsula was taken up by The Broken Hill Pty...-
Document
-
Mount Hill (part of the Gum Flat Iron Ore Project). Final report at licence full surrender, for the period 25/2/2008 to 27/8/2015.
A small part of the Lincoln Uplands on east-central Eyre Peninsula, which is centred ~20 km north-east of Cummins, has been explored for possible economic buried graphite and/or base metal mineralisation that may have formed in metamorphosed...-
Document
Published: 22 Jun 1915
-
Wanilla (originally part of the Wanilla JV Project). Annual reports submitted until the commencement of licences' joint reporting for the Gum Flat Iron Ore Project, for the period 13/2/2007 to 12/2/2010.
A large north-south orientated area centred ~45 km north-west of Port Lincoln was taken up to explore for possible buried Archaean komatiite-hosted nickel, volcanic hosted massive sulphides (base metals), orogenic lode gold, BIF-hosted iron ores and...-
Document
Published: 01 Jun 1910
-
Data release - as updated [made at SA Director of Mines’ discretion] : Verran. Annual reports submitted until the commencement of joint venture project joint reporting, for the period 29/1/2010 to 28/1/2014.
An area located in the Cowell Hills is being explored for possible economic buried iron ore deposits. The desired commodity is DSO (Direct Shipping Ore) haematite mineralisation similar to that of the Middleback Range iron deposits, where pods of...-
Document
Published: 23 May 1914
-
Data release [made at SA Director of Mines’ discretion] : Wanilla. Annual reports submitted until the commencement of the multi-licence Southern Eyre Peninsula JV Project, for the period 28/10/2004 to 27/10/2006.
A narrow north-south aligned area centred approximately 25 km west-northwest of Port Lincoln, which is mainly covered by Quaternary ferricrete, has been taken up by Centrex Metals Ltd to explore for possible concealed economic deposits of iron ores...-
Document
-
Ironstone Hill (part of the Northern Eyre Peninsula Project). Final report at licence full surrender, for the period 17/9/2003 to 17/9/2015.
During the majority of its tenure term, very little field work was conducted on the subject ground. Initially, office studies of available geophysical and open file geological data were performed during 2005 to try to identify possible drilling...-
Document
-
Data release - as updated : Moonabie (part of the East Eyre Peninsula Project). Annual reports plus final report to licence expiry/full surrender, for the period 1/5/2006 to 13/3/2017.
A licence consisting of three separate sub-blocks that are centred approximately 60 km WSW of Whyalla is being explored for possible economic primary uranium mineralisation plus precious and base metals, in a structurally complex epithermal and...-
Document
Published: 29 Apr 1917
-
Data release - as updated : Campoona (part of the Cockabidnie JV Project). Annual reports and final report to licence expiry/full surrender, for the period 6/8/2007 to 5/8/2016.
The subject licence area, comprising two sub-blocks centred approximately 20 km north-west of Kimba, and which lies within the middle part of the NNE trending Campoona Syncline region located on central Eyre Peninsula, has been explored, in concert...-
Document
-
RB 2007/00006 The geology and mineral potential of the PORT AUGUSTA [mapsheet] area, eastern Gawler Craton.
The PORT AUGUSTA 1:250,000 mapsheet area covers the north-eastern part of the Eyre Peninsula, the northern Spencer Gulf and the south-western Flinders Ranges, and extends from latitude 32°00'S to 33°00'S and longitude 136°30'S to 138°00'S. The main...-
Document
Published: 01 Apr 2007
-
Ironstone Hill. Combined first annual / final report to licence expiry/full surrender, for the period 22/3/1996 to 21/3/1997.
A possible southerly extension to the Iron Duke deposit was indicated by aeromagnetic and gravity data. However, one 150 m deep exploratory RC drillhole put down on the coinciding anomalies encountered quartz-magnetic BIF with no haematite enrichment.-
Document
-
Mangalo. Annual reports to licence expiry for the period 16/4/97 to 15/4/2002.
Work undertaken to delineate metasedimentary iron ore resources within an area roughly 40 km north-west of Cowell was reported in an earlier release of data made on partial surrender of the licence (see open file Env 9794). No further work has been...-
Document
-
Mangalo. Second partial surrender, annual reports for the period 16/4/1997 to 15 April 2001.
Following on from calcrete sampling in the vicinity of Mangalo, reported earlier (Env. 9583), limited field reconnaissance and collection of rock samples was undertaken over selected subtle geological/geophysical anomalies, that had been identified...-
Document
Published: 02 Nov 1901
-
Painted Hill, Birthday Hill, White Hill, Mount Hawker and The Twins (the Mount Woods Project, then the Coober Pedy Project). Progress and combined annual reports for the period 27/11/1987 to 31/12/2007. [ Index Part 2 of 4 ].
After Poseidon Exploration took over the management of ELs 1448 and 1465 in November 1991 as a result of a supplementary farm-in agreement made with Burmine, whereby Poseidon would fund the next two year's of exploration to earn Burmine's 50% interest...-
Document