RB 78/00089;Env 02960 Appraisal drilling results, Anna Coalfield, Murray Basin, South Australia.
At the Anna Coalfield, the November 1976 appraisal drilling by SADME of 2 rotary mud, partly cored vertical boreholes with a total penetration of 159.62 m (including 28.36 m of continuous ?NQ coring over the coal-bearing section) has confirmed the...-
Document
Published: 11 May 1978
-
RB 79/00044 Explanatory notes for the CHILDARA, 1:250 000 geological map sheet SH/53-14.
The CHILDARA 1:250 000 geological map covers part of the Precambrian Gawler Craton in north-western Eyre Peninsula, much of which is blanketed by Cainozoic and Mesozoic deposits. The oldest rocks are a complex assemblage of granitic gneisses and...-
Document
Published: 01 Jan 1980
-
RB 91/00063 Construction sand deposits in the Port Lincoln area. Report no. 2.
About 87 percent of Port Lincoln's construction sand is obtained from the coastal zone about 20 km north of the city. The remainder, from Strawberry Hill, contains about 10% fines and is blended with clean sand from Louth Bay to meet specifications....-
Document
Published: 01 Jul 1991
-
Bond Hill. Annual reports to licence surrender for the period 17/5/2002 to 3/6/2005.
An area located between Lakes Acraman and Gairdner was taken up to explore for possible buried iron oxide - associated copper-gold deposits hosted by subcropping basement rocks of the Gawler Range Volcanics (GRV). The licensee had noted a lack of...-
Document
Published: 14 Apr 1905
-
Moorlands. Progress reports and final report to licence full surrender, for the period 15/1/1979 to 30/11/1984.
Adelaide Brighton Cement took up tenure of the Moorlands lignite deposit during September 1976 in order to conduct confirmatory drilling of the published coal resource, to prepare a mining study for Lobe 'E', and overall, to assess the coal's...-
Document
Published: 23 Nov 1984
-
Feasibility level geotechnical and hydrogeological studies, Moorlands coal deposit, Lobe E, Moorlands SA.
Drilling (132.8 metres) included fully cored geotechnical hole to basement to estimate mine planning constraints for open cut mining. The unconfined aquifer above the lignite must be dewatered for mine slope stability. Overburden contains 2 layers of...-
Document
-
Moorlands coal deposit conceptual mining study.
Coal seam thickness averages 9.55 metres. In situ reserves are 8.85 MT. Recoverable coal reserves are 8.6 MT. Capital required to bring the mine into operation is $15.2 M. The real average cost of production is $13.69 / T.-
Document
-
RB 75/00007 Explanatory Notes for the FOWLER 1:250 000 geological map.
There is no abstract created for this record-
Document
Published: 21 Jan 1975
-
RB 74/00172 Upper Cainozoic stratigraphic units of the Gawler Block and Eucla Basin in South Australia.
New lithostratigraphic units are defined following regional surveys of the Gawler Block and Eucla Basin areas in South Australia. The new names have been cleared with the Central Register of Stratigraphic Nomenclature, Canberra, and the definitions...-
Document
Published: 16 Sep 1974
-
RB 2016/00025 Geology of the Peltabinna 1:75 000 Special Edition Map Sheet.
The Peltabinna 1:75 000 Map Sheet was produced as part of a mapping program integrated into the Mineral Systems Drilling Program (MSDP) along the southern margin of the Gawler Ranges. The objective of the mapping program was to provide a regional...-
Document
Published: 01 Sep 2017
-
Surface Geology of Peltabinna – Mineral Systems Drilling Program Special Map Series, 1:75 000 scale.
There is no abstract created for this record-
Map
Published: 01 Jul 1917