-
Margaret Creek (part of the G2 Lineament Project). First and second partial relinquishments' combined report, for the period 13/10/2000 to 12/10/2004.
Diamond exploration undertaken within the relinquished portions of EL 2759, which are located immediately south of William Creek and near the Oodnadatta Track, was focussed on the margin of the Gawler Craton where it is cut by the NNW-trending G2...-
Document
-
1982 seismic survey, Christmas Creek, final report.
AIM:The 1982 Christmas Creek Seismic Survey was designed to cover a wide area of the sparsely explored western farmout blocks of PELs 5 and 6, where Eromanga Basin sediments thin and overly sub-basins of variously aged prospective sediments. Primary...-
Document
-
Lagoon Hill. Progress and final reports to licence surrender for the period 2/11/1972 to 1/11/1973.
Exploration for possible roll-front sedimentary uranium deposits developed in porous and arenaceous Upper Jurassic to Lower Cretaceous sediments of the Algebuckina Sandstone and Cadna-owie Formation, where these onlap likely uranium-providing...-
Document
Published: 08 Apr 1974