-
RB 54/00153 Investigations of Lake Eyre. Part 1 - The sediments of the Lake Eyre Basin, evaporites and brines, their constitution and age.
Four boreholes completed in Lake Eyre North and one in Lake Eyre South have provided further information on lake sediments and the stratigraphy of the Lake Eyre Basin. Modern lake sediments constitute a thickness of less than 15 feet in the deflated...-
Document
Published: 01 Jan 1962
-
RB 76/00119 Silcrete sediments and stratigraphy.
There is no abstract created for this record-
Document
Published: 01 Jan 1976
-
Data release made at renewal of the Sturt Joint Venture Project ELs 4062 through 4090, in lieu of submitting a joint partial surrender report for them : joint annual reports, for the period 25/2/2008 to 24/2/2013.
A very large area of the remote far north-east of the State was taken up early in 2008 by the unlisted Thorne-Clarke family company, to explore for sediment-hosted secondary uranium mineralisation of the type found in intracratonic sedimentary basins...-
Document
-
Davis Hill and Mount Wells (the Lake Gregory Project). Annual reports, joint annual reports and final report to licences' joint expiry/full surrender, for the period 5/11/2007 to 4/11/2012.
The two Lake Gregory project licences were located between the Birdsville Track and Lake Gregory, approximately 100 km north-northeast of Marree, and to the north of uranium exploration tenements held by Adavale Minerals. Regalpoint selected these...-
Document
Published: 03 Dec 1912
-
Curnamona [Sedimentary Uranium Exploration] Project. Joint annual report for the calendar year 2012.
During 2012, Afmeco conducted a fourth exploratory drilling campaign spread over six of its eight Curnamona Project tenements, which was designed to test the extensions of the Erudina, Yarramba and Coolibah Palaeochannels, as well as probing in basin...-
Document
-
Mount Distance. Progress and final reports to licence expiry for the period 3/9/1970 to 2/9/1971.
In a search for possible roll-front type secondary uranium deposits emplaced in piedmont alluvial sediments over an area adjacent to the north-western edge of the Mount Painter Block, the licensees drilled 6 scout vertical rotary holes totalling 2151...-
Document
-
Marree, Mount Alford, Meta Hill and Etadunna. Joint first progress and joint final report to licences' joint full surrender, for the period 20/6/1980 to 19/12/1980.
An assessment of the oil shale potential of marginal Great Artesian Basin sediments in South Australia was carried out, due mainly to their perceived stratigraphic and lithological similarity to Cretaceous strata in Queensland which host the very...-
Document
Published: 25 Nov 1980
-
1981 seismic survey, Rainbow Plains, final report.
AIM:The 1981 Rainbow Plains Seismic Survey semi-detailed programme was designed by the PELs 5 and 6 Birdsville Track Ridge Block partners to further define the Haddon Downs structural feature, which in 1979 had been identified on regional line 79-QAM...-
Document
-
RB 00655 Delhi-Frome-Santos Innamincka no. 1 well. Subsurface stratigraphy and micropalaeontological study. Final report.
Innamincka no. 1 well was drilled to a depth of 12,638 feet KB and penetrated a sedimentary sequence of Mesozoic and Palaeozoic rocks ranging in age from Cretaceous to ?Devonian. Marine Cretaceous (Albian) carbonaceous mudstones and siltstones were...-
Document
Published: 08 Feb 1960
-
RB 00753 Kalladeina bore - Lithological sequence, surface to 1 210 feet.
The near surface section encountered in Kalladeina 1 contains a thick Plio-Pleistocene section, whilst the Lower Tertiary sediments ubiquitously present in the Cooper's Creek Basin, are either absent or very thin. Of particular interest is the...-
Document
Published: 01 Aug 1900
-
RB 00679 Delhi-Santos' Dullingari 1 subsurface stratigraphy and micropalaeontological study. Progress report.
Dullingari 1 to a depth of 2798 metres has intersected a sedimentary sequence of Tertiary, Mesozoic and Permian rocks, the age of the sediments below 2756 metres being at present uncertain. This report presents lithological data and stratigraphic...-
Document
Published: 01 Aug 1900
-
RB 73/00043 Explanatory Notes for the PANDIE PANDIE 1:250 000 geological map.
The PANDIE PANDIE 1:250 000 map area lies in the most northerly portion of the Great Artesian Basin in South Australia. The western half of the area is covered by the longitudinal dunes of the Simpson Desert, while the remainder is covered by (a) the...-
Document
Published: 14 Feb 1973
-
RB 74/00025 Geology of the FROME 1:250 000 geological map and adjacent regions.
The Frome 1: 250 000 map covers the northern part of the South Australian portion of the Frome Embayment. The embayment is essentially the eastern portion of a Mesozoic basin, developed on Palaeozoic and Precambrian rocks during Upper Jurassic time by...-
Document
Published: 01 Jan 1974
-
Round Hill and Nillinghoo. Annual reports, joint annual reports and final report to licences' joint surrender, for the period 30/9/2009 to 19/2/2014.
Afmeco Mining and Exploration Pty Ltd is exploring for possible economic sedimentary uranium mineralisation which may have formed within permeable sand units of the Tertiary Callabonna Sub-basin. The subject ELs 4317 and 4318 are part of 7-licence...-
Document
Published: 24 Nov 1911
-
Trooper Nob area. Annual report and final report to licence expiry/full surrender, for the period 11/7/2011 to 10/7/2013.
A substantial area (~50 square km in extent) of unusual surface ironstone enrichment on the Quaternary peneplain lying to the east of Etadunna Homestead on the southern Birdsville Track was investigated for its possible economic potential as a source...-
Document
Published: 08 Feb 1914
-
Cooinchina Creek (synonym: the West Lake Eyre Project). Annual reports and final report to licence expiry/full surrender, for the period 21/9/2007 to 20/9/2010.
An area located approximately 50 km east of William Creek and abutting the western shoreline of Lake Eyre North was taken up to explore for possible concealed IOCG style base metal and uranium deposits, that could have formed in buried Archaean to...-
Document
Published: 30 Jun 1910
-
Warana Hill - Areas 1-3. Joint annual reports to licences' joint expiry/full surrender, for the period 30/6/2009 to 29/6/2011.
A conjoined multi-licence area located in the northern Strzelecki Desert, centred approximately 110 km north-northwest of Moomba, has been explored for possible economic buried Cenozoic heavy minerals sands (HMS) deposits, and also for shallow...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Lake Callabonna / Petermorra (part of the Lake Elder Project). Annual reports for the period 19/3/1998 to 30/4/2015.
Exploration Licence 2494 was granted in March 1998 to Paladin Energy Minerals NL and Brightstar Power Corporation Pty Ltd - the Paladin Brightstar Joint Venture (PBJV), with Paladin Resources NL as manager. The target commodity being explored for by...-
Document
Published: 20 May 1915
-
PACE 2020 Initiative : PACE Targeting, Year 1 partnership no. 14 - Lake Blanche Project area, prospects A to F, airborne SkyTEM508 electromagnetic (AEM) geophysical survey. Project PT1-14 final report.
With the assistance of the SA Government's PACE 2020 Targeting Initiative, Cameco Australia has recently acquired an airborne electromagnetic (AEM) survey to look for possible buried sedimentary uranium mineralisation on the western edge of the...-
Document
-
Innamincka 3 area (part of the Sturt Joint Venture Project). Final report at licence expiry/full surrender, for the period 25/2/2008 to 24/2/2013.
A large area centred ~80 km north-east of Moomba has been explored for possible buried economic Tertiary to Recent sedimentary uranium mineralisation of roll front style, similar to what occurs as fluvial sandstone - hosted giant secondary deposits...-
Document
Published: 20 Jan 1914