RB 88/00014 Petroleum exploration and development in South Australia (5th edition).
In South Australia since 1958, 140,400 km of seismic have been recorded (75,500 onshore) and 882 wells drilled (of which 16 are offshore wildcats and 238 are development wells). Exploration and development have taken place in three distinct phases....-
Document
Published: 01 Mar 1988
-
RB 90/00030 Duntroon geophysical study.
The Duntroon Basin is located in the centre of the Southern Rift System between the Bight and the Otway Basins, west and SW of Kangaroo Island. It is limited to the north by the Proterozoic Gawler Craton. The formation of the basin is related to the...-
Document
Published: 01 Dec 1990
-
RB 89/00018 Petroleum exploration and development in South Australia (6th edition).
There is no abstract created for this record-
Document
Published: 01 Apr 1989
-
RB 90/00072 First report on the project. Location of oil seeps by micro-tremor analysis.
A project funded by Cultus Resources and SENRAC is investigating the possibility that coastal bitumen strandings result from seismic tremors which cause crude oil to be released from submarine seeps in the offshore Duntroon or Otway Basins. Objectives...-
Document
Published: 01 Nov 1990
-
EPP 25 surrender report.
There is no abstract created for this record-
Document
-
EPP 5, Eucla, Duntroon and Bight Basins (Ceduna Terrace). Progress and technical reports for the period 20/9/68 to 13/1/76.
The programme of work pursued over EPP 5 was as follows: Permit Year 1 - interpretation of 407 line km of regional reconnaissance 6 and 24-fold reflection seismic data recorded in the 1968-69 R 3 Marine Seismic Survey, plus the ongoing review and...-
Document
Published: 13 Jan 1976
-
Permit EPP 26 - Duntroon Basin. Surrender report.
This EPP 26 surrender report has been furnished to the SA offshore Designated Authority as a result of the application made on 21/8/96 by BHP Petroleum for permission for the joint venture to surrender the permit, before committing to unwanted...-
Document
Published: 19 Feb 1997
-
EPP 25. Progress, technical and surrender reports for the period March 1991 to October 1995.
BHP Petroleum (Aust.) Pty Ltd was granted the permit EPP 25 for 6 years on 13 March 1991, together with the adjoining EPP 26 also in the Duntroon Basin. During 1991 BHP reprocessed 2070 km of Getty Oil's 1983 and 1984 seismic data, and acquired a...-
Document
-
Proposal to relinquish permit EPP 21, South Australia.
A complete re-evaluation of all known prospects and leads within EPP 21 was undertaken by the permittees in order to define any prospects worthy of drilling in permit Year 4, ending 28 June 1986, by which time a commitment to drill one well and...-
Document
-
Assessment of seal potential in the Duntroon Basin.
There is no abstract created for this record-
Document
Published: 20 Oct 1995
-
Geophysical review - Prospect evaluation, SA offshore permit SA-7.
EPP 7 work conditions for 1975 (permit Year 7) required evaluation and review studies to be carried out with the aim of defining at least three areas which may have prospects geologically and geophysically as sites for wells. This report sets out the...-
Document
-
EPP 26, Duntroon Basin, [migration trap] lead summaries. Fairways: Platypus-Duntroon, Greenly, Outer Basin.
Report summarises the risked volumetric oil potential of leads in the post - Greenly 1 highgraded petroleum migration fairways (Duntroon-Platypus, Greenly and Outer Basin) that were identified in the BHPP Duntroon Basin regional study of December...-
Document
Published: 25 Jul 1995
-
EPP 6, Eucla and western Duntroon Basins. Progress, technical and relinquishment reports for the period 20/9/68 to December 1975.
The programme of work pursued over EPP 6 was as follows: Permit Year 1 - interpretation of 566 line km of regional reconnaisance 6 and 24-fold reflection seismic data recorded in the 1968-69 R 3 Marine Seismic Survey, plus the ongoing review and...-
Document
-
Evaluation report on South Australia offshore permits SA-6 and SA-7.
Based on the latest (R 6 survey) seismic interpretation, after intergration with previous seismic survey results and newly obtained well information, Shell's Duntroon Basin permit areas can now be subdivided into 4 structural zones: (i) a monoclinal...-
Document
-
EPP 5. 1973 evaluation report.
Following an unsuccessful attempt at farming out part of EPP 5 in late 1972, Shell resolved to continue exploring that permit area in its own right, subject to the offshore Designated Authority's approval of a variation in permit conditions, which was...-
Document
-
Assessment of the relationship between variations in porosity and reservoir facies (in) EPP 26.
There is no abstract created for this record-
Document
Published: 12 Aug 1996
-
Integrated petrographic and special core analysis report of BHP Petroleum Duntroon wells (Borda 1, Greenly 1 and Vivonne 1).
There is no abstract created for this record-
Document
-
Vivonne 1. Test reports.
Contains the operator's pre-drill prospect evaluation file, the drilling contractor's FMS (Formation Micro Scanner) dipmeter log interpretation report and summary plots, and the well seismic processing (VSP velocity survey) report and GEOGRAM plots.-
Document
-
Greenly prospect file, EPP 26, Duntroon Basin, offshore South Australia.
BHPP's Greenly 1 well is herein proposed to test a faulted hanging wall anticline with minor crestal collapse faults, an estimated fault-dependent maximum closure area of 53.3 square km, and a closure height of 140 metres at the primary target. The...-
Document
-
Duntroon Basin. Upper Borda [Formation] petroleum system.
There is no abstract created for this record-
Document
Published: 05 Aug 1996