-
Anabama Hill. Progress reports and final report to licence expiry/full surrender, for the period 7/11/1980 to 6/11/1982.
In order to further test a large Delamerian granite pluton for its potential to host an economic porphyry molybdenum deposit of the Climax, Colorado type (following initial exploratory drilling and IP surveys that had been carried out by the SA...-
Document
-
RB 77/00051;Env 03054 Porphyry style copper/molybdenum mineralization at Anabama Hill and the Cronje Dam copper prospect.
For a project to determine the base metal potential of known copper-mineralised igneous rocks which outcrop in an area located approximately 59 km south-west of Olary, the South Australian Government has completed detailed mapping, geochemical...-
Document
Published: 17 May 1977
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-05 - Netley Hill porphyry style Cu-Mo mineral prospect. Project final report.
Remodelling and re-interpretation of the geological and geophysical signatures of the Netley Hill prospect by the EL 3848 Joint Venture has indicated good potential for discovering a large porphyry copper-gold deposit at depth, beneath historical...-
Document
Published: 14 May 1908
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Caroline, Mount Harcus and Pine Ridge (the Musgrave Project). Joint annual reports for the period 1/7/2011 to 31/12/2018.
Three Exploration Licences spread across the central and eastern Musgrave Ranges are now being explored by NiCul Minerals Limited (a wholly owned subsidiary of PepinNini Minerals Limited) which currently owns 100% of each tenement. The ground held is...-
Document
Published: 28 Feb 1919
-
Glenloth. Progress reports and final report to licence full surrender, for the period 1/8/1965 to 31/2/1967.
TARGET: Economic tin mineralisation. EXPLORATION: 1:32,000 scale detailed geological mapping, diamond drilling (9 shallow vertical holes - deepest 57 feet) in the Mount Mitchell area near Glenloth Goldfield, bulk sampling of greisen and vein quartz,...-
Document
Published: 14 Feb 1967
-
Data release [made at SA Director of Mines' discretion] : Wadnaminga, Manna Hill, Mount Victor, Yunta and Outalpa (the Olary JV Project, later renamed the Blue Rose Project). Joint annual reports for the period 3/4/1997 to 18/7/2008.
A group of five adjoining exploration licences covering ~3300 square km situated along the southern flank of the Proterozoic Curnamona Craton (Olary Block) and the adjoining Nackara Arc of the Adelaide Geosyncline is being explored for possible...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Curnamona JV Project area (including Benagerie and Kalkaroo). Combined annual reports for the period 10/5/2003 to 31/12/2007.
Ongoing exploration carried out by project operator Havilah Resources under its newly ratified, twelve exploration licence Curnamona Project Amalgamated Expenditure Agreement, for the period 15/10/2003 to 31/12/2004, consisted mainly of drilling done...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-55, exploring Kalkaroo Dome copper-gold mineral prospects for extensions of the Kalkaroo deposit. Project final report.
The Kalkaroo Cu-Au-Mo deposit is located 65 km north of Olary and 100 km west of Broken Hill, and occupies a portion of very prospective Palaeoproterozoic Bimba Formation subcrop, which potentially could have a 40 km strike length around two buried...-
Document
-
Coonalpyn. Progress reports and final report to licence full surrender, for the period 29/3/1982 to 6/9/1985.
Cambrian rocks lying beneath relatively thin Phanerozoic cover on the western edge of the Murray Basin were targeted by CSR principally for stratiform volcanogenic massive copper sulphide deposits, and for epigenetic Palaeozoic gold occurrences...-
Document
-
Woolatchi Creek. Progress, partial surrender and technical reports to licence surrender, for the period 12/4/1982 to 27/8/1985.
Diamond drillhole WC1 was drilled by Marathon to a total depth of 173.5 m over the Woolatchi Creek aeromagnetic anomaly, as part of an ongoing search for uranium and base metals in the north-eastern Flinders Ranges and Lake Frome Plains region....-
Document
-
Netley Hill. Progress and final reports to licence expiry/full surrender for the period 1/12/1968 to 30/11/1969.
A rotary percussion drilling programme (8 vertical holes for a total penetration of 1920 feet) was undertaken at Netley Hill to look for economic copper and molbdenum mineralisation in a greisen (hydrothermally altered granite) body which has an...-
Document
Published: 19 Nov 1970
-
Colebatch. Progress reports and final report to licence expiry/full surrender, for the period 12/5/1969 to 11/11/1970.
In a continuation of geochemical exploration for possible large blind base metal sulphide orebodies which may have formed within the concealed Cambrian basement, North Broken Hill carried out infill sampling of significant mercury soil anomalies (>...-
Document
-
Spilsby Island. Progress reports and final report to licence full surrender, for the period 1/8/1966 to 28/6/1967.
South-westwards inclined diamond drillhole No. 11 was put in to 400 feet total hole depth by licensee Kennecott during the subject reporting period, to investigate the postulated buried inland extension of a continuously mineralised sheet-like body of...-
Document
Published: 31 Oct 1967