-
RB 81/00098 Leigh Creek town water supply groundwater investigation, progress report no. 2.
Fractured rock aquifers were investigated by drilling of 7 vertical holes and 2 angle holes in the Windy Creek area. 1 well was completed as production well with an airlift yield of 12 L/s. The steeply dipping fractured sandstone aquifer responds as a...-
Document
Published: 01 Jan 1982
-
South Puttapa. Progress and final summary reports for the period 15/7/1970 to 16/7/1971.
Appraisal of the Beltana zinc deposit continued during the current licence period, principally by diamond drilling (6 holes, total 2570 feet) aimed at delineating blind extensions to the main orebody on its southern side. The drilling was very...-
Document
-
Special Mining Leases nos 153, 153A and 153B; Mineral Claim nos 5092 and 5350. Summary report for the period 10/7/1967 to 16/7/1971.
This report summarises, in categoric fashion, all of the various exploratory and mine development activities carried out over the past four years on the broader Puttapa area exploration licence (as renewed), and within the mineral claims taken out...-
Document