-
Buckleboo. Progress reports to licence expiry/full surrender, for the period 15/3/1983 to 14/3/1988.
TARGET: Lead-zinc-silver mineralisation of the Broken Hill or Aggeneys-Gamsberg type, associated with banded iron formations in Early Proterozoic metasediments; in addition, possible tin, tungsten or base metal-bearing skarns produced by hydrothermal...-
Document
-
Yarranna Hill (part of the Narlaby Palaeochannel Project). Data release made in lieu of submitting a first partial surrender report: progress reports for the period 25/10/1979 to 30/6/1981.
Drilling of 490 rotary drillholes (total 43,000 m) in EL 539, the majority being located on a 200 m grid spacing, has revealed the western end of a major Tertiary palaeochannel system, and has intersected significant and widespread subsurface uranium...-
Document
-
Lock. Progress and final reports to licence surrender for the period 8/2/1973 to 7/4/1974.
TARGET: Possible sedimentary uranium deposits in the Jurassic Polda Formation and Tertiary Poelpena Formation. EXPLORATION: To reconnoitre contemporary soil radiometry in the area, the near-surface sediments penetrated by 135 auger holes (all drilled...-
Document