Millers Creek Homestead. Progress reports and final report to licence expiry/full surrender, for the period 13/3/1980 to 28/3/1986.
Following a review of existing regional geophysical and geological data for the north-western Stuart Shelf, grid-based gravity and ground magnetic surveys were run to further outline two broad gravity highs associated with discrete magnetic anomalies,...-
Document
-
Mount Carulina and Trapeze Hill (the Oodnadatta Project). Joint annual reports plus succeeding single licence annual reports to licence expiry/full surrender, for the period 6/3/1995 to 12/10/2009. [ Index Part 2 of 2 ].
[ Note - here is Part 2 of the abstract relating to 2 separately indexed parts ]. A new joint venture with Barrick Gold, pertaining to the renewed (as EL 3424) tenement, was signed on 8/2/2007, after which that company as operator undertook a 749...-
Document
Published: 09 Feb 1910
-
Mount Britton. Annual and final reports for the period 19/10/97 to 18/10/99.
Limited percussion drilling (2 holes, total 446 m) of inferred dipolar aeromagnetic anomalies in the vicinity of Ross Creek, 140 km north-east of Marla, and subsequent mineralogical examination of heavy mineral concentrates obtained from the drilled...-
Document
-
Abminga Diamond Project. Data release made at licence renewal [and project cessation]: progress reports and annual reports for the period 25/10/1993 to 17/3/2004.
The Abminga Diamond Project, undertaken by Caldera Resources NL, was granted exploration project status, including permission for EL joint reporting, in July 1996. This event followed up to two years of work by other operators on a number of...-
Document
-
Todmorden area. Progress reports for the period 4/10/89 to 3/4/91.
TARGET: Diamonds. EXPLORATION: Drilling (1 rotary hole totalling 306 m) over a possible buried kimberlitic diatreme identified from seismic and gravity surveys. RESULTS: No kimberlite was intersected.-
Document
Published: 22 May 1991
-
Ruby Hill. Progress and final reports to licence surrender for the period 1/12/1980 to 31/5/1982.
During a search for possible diamondiferous rocks within an area lying to the north of William Creek and abutting the south-eastern side of the Peake and Denison Ranges, stream sediment sampling and a low level, 5300 line km aeromagnetic / radiometric...-
Document
Published: 02 Jun 1982
-
......[Key SAMREF record for accessing referenced reports and data via DEM Content Manager - SPOT]...... Mount Toondina. Annual reports and final report to licence surrender, for the period 13/2/1995 to 15/8/1998.
The Mount Toondina structure, a small but pronounced vertically fault-bounded inlier of Permian sediments within a flat-lying Mesozoic sequence, is represented by an annular magnetic feature located 45 km south of Oodnadatta. A single gravity profile...-
Document
-
The Alberga Diamond Project. Joint progress and annual reports to licences' joint surrender, for the period 19/3/1998 to 16/6/2000.
Kimberlite-seeking loam sampling and soil geochemistry, undertaken in the vicinity of 28 selected magnetic targets distributed within eight separate licence areas extending from 150 km west-northwest of to 120 km north of Oodnadatta, only yielded a...-
Document
-
Bopeechee and Cadnia Hill/Stuart Creek and Porter Hill (The Lake Torrens Project). Data release made at two licences' surrender/two latter licences' fifth partial relinquishment: annual reports and final reports for the period 9/4/1998 to 31/12/2006.
The reports comprising this data release package describe exploration for economic deposits of base and precious metals that have possibly formed within Neoproterozoic metasediments, the underlying Palaeoproterozoic basement, and in Cambrian carbonate...-
Document
Published: 29 Sep 1909