-
Harris Bluff (Uno Station). Progress reports and final report to licence full surrender, for the period 7/9/1982 to July 1986.
Exploration undertaken over an area located 60 km west of Port Augusta targeted possible Broken Hill or Aggeneys - Gamsberg type massive Pb-Zn deposits within Early Proterozoic Hutchison Group banded iron formation metasediments, and also any Early...-
Document
-
RB 45/00118 Final report on iron ore prospecting, Corunna area, Iron Knob district.
In an area of limited basement outcrop located between 2 and 5 miles north-northwest of Iron Knob township, the Department's surface traverse channel sampling (969'), percussion boring (643’) and diamond drilling (1270’) tested a low grade...-
Document
Published: 04 Dec 1957
-
RB 83/00080 Precambrian correlation of the Lake Superior region, North America, and the Gawler Craton.
Geology of Lake Superior region outlined. Many similarities in tectonic evolution and depositional style of the 2 provinces. Recommends further research on Gawler Craton.-
Document
Published: 01 Sep 1983
-
Bull 033 The Geology and Iron Ore Resources of the Middleback Range Area
This report deals comprehensively with the physiography, prospect geology, and ore genesis, and includes an assessment of the iron ore reserves and other mineral resources of an area which has been almost the sole source of the iron ore used in...-
Document
-
Eastern Eyre Peninsula. Progress reports and final report to licence expiry/full surrender, for the period 25/10/1976 to 24/10/1978.
Stratabound, metasedimentary iron ore was the principal target of exploration undertaken by BHP over a large area surrounding the Moonabie Range that extends along strike and borders the north-western side of Spencer Gulf. Base and precious metals...-
Document
-
Verran (part of the Kimba-Verran Joint Venture Project, and also part of the Eyre Peninsula Joint Venture Project). Annual and combined annual reports for the period 28/6/2002 to 11/7/2009.
No field work was conducted on the subject licence area, which comprises three sub-blocks, for all of Years 6-11 (period 2002-2008) on EL 2981. During Year 8 of the project (8th March to 28th December 2004), exploration activities were reported...-
Document
-
RB 2007/00006 The geology and mineral potential of the PORT AUGUSTA [mapsheet] area, eastern Gawler Craton.
The PORT AUGUSTA 1:250,000 mapsheet area covers the north-eastern part of the Eyre Peninsula, the northern Spencer Gulf and the south-western Flinders Ranges, and extends from latitude 32°00'S to 33°00'S and longitude 136°30'S to 138°00'S. The main...-
Document
Published: 01 Apr 2007
-
Uno (synonym Aroha). Progress reports to licence expiry/renewal, for the period 6/3/1978 to 5/3/1980.
Exploration for uranium in the vicinity of Lake Gilles targeted the Lower Proterozoic Cleve Metamorphics and the unconformably overlying sandstone, conglomerate and rhyolite units of Carpentarian age, searching initially for analogues to the deposits...-
Document
-
Charleston (north of Cowell, eastern Eyre Peninsula). Annual and final report for the period 11/1/2001 to 10/7/2002.
EL 2789 covered the Charleston Granite, a large inferred Hiltaba Suite granitoid located at the southern termination of the Middleback Range, 60 km southwest of Whyalla. The area was considered prospective for shear - hosted gold mineralisation...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-27 - Cleve area Proterozoic unconformity-style uranium mineral prospects. Project final report.
In May 2009 a total of 45 aircore blade or hammer holes (total penetration 1332 m) were drilled by Adelaide Resources along six northeast-southwest trending traverses laid out immediately south-west of Cleve, to test a conceptual unconformity - style...-
Document