-
AMIRA Project P544: Proterozoic sediment-hosted copper deposits. Quarterly progress reports and final report for the period July 2000 to October 2003.
The original objectives of this project were: 1) To understand the processes responsible for transporting, concentrating and fixing copper and other ore constituents during sedimentary basin evolution 2) To document the various stages and paragenesis...-
Document
-
Data release - as updated : Castle Rock. Annual reports to licence full surrender, for the period 17/3/2009 to 14/1/2016.
Exploration for possible economic concealed Beltana mine type stratabound lead-zinc-(silver) mineralisation, and for other diapiric and associated basic igneous intrusion - related base metal and/or gold occurrences, was carried out over a small area...-
Document
Published: 20 Jan 1916
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Lyndhurst area Annual technical report for period ending 11/12/2018.
Exploration licence 5899 was granted to Datong Gold Mining Pty Ltd on 12 December 2016. The tenement sits approximately 21 km north of the township of Leigh Creek. The tenement lies in the northern part of the Adelaide Geosyncline and has the...-
Document
Published: 04 Apr 1918
-
Ruby Hill Project : Douglas Creek prospect drilling program. Final report, Project ADI RD02-288 [part of Accelerated Discovery Initiative Round 2, 2022].
Copper Search Australia Pty Ltd (a subsidiary of Copper Search Limited) was granted co-funding from the Department of Energy and Mining in July 2021 to a subsidy total of up to $228,000, to assist it with high risk exploration of remote parts of the...-
Document
-
Bull 053 The Adelaide Geosyncline: Later Proterozoic Stratigraphy, Sedimentation, Pataeontology and Tectonics
The extremely thick succession provides one of the most complete sedimentary records for the Late Proterozoic. The term geosyncline is used in a non-genetic sense for the basin in which deposition occurred during the Adelaidean and Cambrian. Only the...-
Document
-
Merna Mora. Annual reports to licence expiry/full surrender, for the period 9/10/2006 to 8/10/2013.
A small licence area located on the Flinders Ranges piedmont plain south-east of Lake Torrens was taken up by Jim Allender to investigate the IOCG potential of a discrete regional gravity anomaly which he had identified from data in the public domain,...-
Document
Published: 20 Nov 1913
-
Mount Denison (part of the BHP Billiton - Rio Tinto - Phelps Dodge' Peake and Denison Joint Venture Project). First partial surrender report, for the period 12/7/1993 to 16/9/2003.
Exploration carried out over the northern Peake and Denison Ranges since 1993 has targeted possible large-scale Proterozoic iron oxide associated copper-gold (IOCG) deposits considered to have formed in stratigraphic/structural settings similar to...-
Document
-
Mount McCallum, Mount Morris and Mount Roebuck (part of Flinders Ranges Project). Combined first annual report, plus progress and final reports to licences' expiry/full surrender, for the period 23/5/2005 to 22/5/2008.
Neoproterozoic glacial sedimentary units in the intramontane basinal valley located east of Leigh Creek and Copley, which were considered likely to contain possible geologically suitable palaeo-depositional sites for secondary uranium mineralisation...-
Document
Published: 16 Jun 1908