-
Peake-Denison Ranges. Progress and final reports for the period 5/5/1975 to 5/11/1975.
Geochemical sampling was not encouraging for either gold or stratiform copper.-
Document
Published: 01 Jan 1975
-
Peake and Denison Ranges. Progress reports and technical reports to licence expiry/full surrender, for the period 17/2/1969 to 4/5/1971.
An airborne magnetic/radiometric survey was flown over the licence in 1969. Three anomalies located near Peake Homestead Ruins and the Coppertop mine gave disappointing ground survey uranium responses from traverses made with a hand-held...-
Document
-
Nilpinna Homestead area (part of the Australian Diamond Exploration joint venture). Progress reports and final report to licence expiry/full surrender, for the period 16/1/1980 to 22/2/1987.
Diamond exploration undertaken in the Peake and Denison Ranges included the acquisition and processing of aerial magnetic, radiometric and heliborne magnetic and VLF-EM surveys, with follow-up ground magnetic and Sirotem surveys, plus extensive...-
Document
-
RB 69/00124 Six monthly report on Last Chance mine area, Peake and Denison Ranges, grid G.3.
An area of 5 square miles around the Last Chance Mine, Peake and Denison Ranges was reserved from the operation of the Mining Act in February, 1969 to permit the investigation by the Geochemical Exploration Section of a reported uranium/copper...-
Document
Published: 01 Jan 1969
-
Data release [made at SA Director of Mines' discretion] : Edward Creek (part of the Edward Creek Joint Venture Project). Progress reports and annual reports for the period 7/12/1987 to 22/9/2008. [ Index Part 1 of 2 ].
Diamond exploration undertaken within the southern of two adjoining licence areas taken up along part of the western flank of the Peake and Denison Ranges, that is centred ~100 km south-east of Oodnadatta, was aimed at discovering the source(s) of...-
Document
-
Mount Margaret Range, Peake and Denison Ranges. Progress and final reports to licence surrender for the period 4/1/1973 to 18/12/1973.
Exploration for possible unconformity-related hydrothermal plus secondary sandstone-type uranium deposits, undertaken along the length of the southern Peake and Denison Ranges, has comprised fixed-wing and helicopter-borne aerial radiometric surveys...-
Document
Published: 26 Feb 1974
-
Algebuckina Siding. Progress and final reports to licence surrender for the period 28/9/1981 to 13/9/1982.
In gold and base metal exploration carried out in an area located approximately 50 km south-east of Oodnadatta, no significant gold or other trace metal values were obtained from surface geochemical sampling of the basal conglomerate unit of the...-
Document
-
Peake Creek and Mount Margaret - Nilpinna areas (northern and central Peake and Denison Ranges). Progress reports and combined final report, plus additional data submitted prior to licence full surrender, for the period 1/10/1966 to 31/1/1969.
Regional geochemical surveys have been conducted by North Broken Hill over 490 square miles covering the northern and central Peake and Denison Ranges, within two new exploration licences which the company took up in 1966 after a private prospector...-
Document
Published: 04 Nov 1968