-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-18. Western Musgrave Province - Mount Caroline area magmatic nickel-copper-PGE and stratiform or epithermal / hydrothermal base metal mineral prospects. Final report.
In late 2008 PepinNini Minerals completed a stratigraphic drilling programme in the western Musgrave Province as an approved PACE Initiative Year 5 collaborative project with PIRSA. The programme was designed to investigate the Mount Caroline...-
Document
Published: 20 Jan 1909
-
RB 00659 Regional geology and nickel exploration in the MANN 4-mile sheet and adjoining areas. Preliminary report. combined with RB 00659A - Nickel exploration on Special Mining Lease 33, Tomkinson Ranges.
This report reviews the available information on the region and presents a preliminary appraisal of the past nickel exploration data supplied by South Western Mining Co. Ltd. Current field and laboratory information has also been included. The study...-
Document
Published: 01 Jul 1900
-
RB 00659A [Review of] Nickel exploration [potential] on Special Mining Lease 33, Tomkinson Ranges.
This report reviews the available information on the region, and presents a preliminary appraisal of the data supplied by South-western Mining Co. Ltd. Current field and laboratory information has also been included. New geological and geochemical...-
Document
Published: 17 Apr 1961
-
RB 62/00053 Geophysical report no. 1 on gravity surveys, North West Province, MANN 4-mile sheet.
Gravity surveys in the North-West Province of the state, begun in 1960, were continued in 1965. Detailed gravity surveys were carried out over the Claude Hills jasper zone and adjacent alluvium covered areas, near Mount Davies, and east of Gosse’s...-
Document
Published: 01 Jan 1966
-
RB 2002/00031 Musgrave Block, central Australia. Regional geology from interpretation of airborne magnetic data.
A regional geological interpretation of newly-acquired magnetic data for the majority of the Musgrave Block (central Australia) has been compiled at 1:250 000 scale. This report outlines the methodology and results of interpretation. Highlights of...-
Document
Published: 01 Aug 2002
-
Australian Mineral Development Laboratories' investigation of the Mount Davies nickel deposits. Progress reports nos 1 to 4 for the period June-December 1966, and subsequent activity reports for the period January-December 1967.
Reports deal with the start of a complex laboratory investigation to trace the petrological development of possibly economic supergene nickel deposits discovered in the Mount Davies area, and to study the unusual mineralogy of the ferruginous ochres...-
Document
Published: 04 Dec 1967
-
Mount Howe. Annual and final reports for the period 26/9/1994 to 25/9/1998.
An aeromagnetic/radiometric survey and an aircore drilling program (41 holes, total 247 metres) were carried out near the SA/NT border to the north, north-east and west of De Rose Hill, to test three positive aeromagnetic features which potentially...-
Document