-
Kokatha. Annual reports to licence full surrender, for the period 20/10/1994 to 8/2/2001.
Calcrete, stream sediment, rock chip and soil geochemical sampling were carried out 30 km south-west of Kingoonya over magnetic features, Archaean metabasalts, and contacts of Hiltaba Suite with Gawler Range Volcanics. RAB drilling (80 holes, total...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 3 partnership no. DPY3-55, Glenloth Goldfield mineral prospects. Project final report.
Historical workings at the Glenloth Goldfield were the target for 10 exploratory RC drillholes put down by Minotaur Exploration during May-June 2006 as a PACE Initiative Year 3 project. Their accepted proposal was to drill a series of RC percussion...-
Document
-
Data release [made at SA Director of Mines' discretion] : Lake Labyrinth West - Lake Harris West area (the Glenloth JV Project). Annual reports to licence expiry/renewal, for the period 25/5/1998 to 10/7/2008.
Continued exploration for Archaean lode-style gold and Mesoproterozoic Hiltaba Suite granite-related hydrothermal Cu-Au within the retained southern former subarea 'B' of EL 2518 located ~40 km south-east of Tarcoola, where there is also potential...-
Document
Published: 08 Oct 1908
-
RB 2002/00028 Gawler Craton, 2002. State of play. [Notes to accompany viewing of the ancillary] Drill core display.
This geotechnical workshop of seminars and core displays, which was held over two days on 5-6 December 2002, aimed to highlight recent collaborative research between PIRSA [MER], Geoscience Australia and the South Australian mineral industry that has...-
Document
Published: 01 Dec 2002