-
Data release [made at SA Director of Mines’ discretion] : Kapinnie (part of the Brimpton Lake Project). Annual reports for the period 17/9/2003 to 4/3/2010.
An area extending to the north of Kapinnie on western Eyre Peninsula area is being explored by grant licensee Anglo American and (since March 2003) its joint venture partner Lynch Mining, looking for possible buried economic Archaean volcanic or...-
Document
-
Data release - as updated : Brooker (part of the Brimpton Lake Project). Annual reports to licence expiry/full surrender, for the period 12/6/2003 to 24/8/2018.
Exploration Licence 3096 “Brooker” covering an area of 682 square km lies east of Elliston on the Eyre Peninsula in South Australia. It is one of three adjacent tenements that form the “Brimpton Lake Project”; the other two are EL 2662 (initially...-
Document
-
Elliston. Annual and final reports to licence surrender, for the period 2/7/2007 to 3/6/2012.
A small licence area located immediately east of Elliston was taken up principally to explore the wholly concealed basement for possible Archaean intrusive-related nickel mineralisation associated with deep-seated faulting along the Polda Basin...-
Document
-
Tungketta Hill. Annual reports and final report to licence full surrender, for the period 7/3/2007 to 9/6/2015.
An area centred ~25km south-east of Elliston on south-western Eyre Peninsula and which abuts the coast of the Great Australian Bight has been explored for possible buried economic occurrences of Archaean igneous intrusive body - related nickel...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-52, Oakdale Project area Archaean VHMS mineral prospects. Project final report.
Five rotary precollared, NQ2 diamond drillholes were completed as a PACE Year 4 subsidised drilling project (DPY4-52) between January 2007 and June 2007, during a regional diamond drilling programme on the licensee's ELs (involving overall ~ 6000 m of...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-24, Greenly Project nickel and base metals mineral prospects. Project final report.
A high-resolution 100 m line spaced aeromagnetic/radiometric survey conducted in October 2006 by UTS Geophysics for InterMet Resources over its EL 3314, located immediately north of Coffin Bay, revealed prominent N-S trending linear magnetic features...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 2 partnership no. DPY2-58, Empire mineral prospect. Project final report.
Adelaide Resources Limited made application early in 2005 for PACE Initiative Year 2 drilling project funding to test a highly regarded multi-element geochemical anomaly (the Empire prospect) located on its EL 2869, which had been defined by previous...-
Document
-
RB 2002/00028 Gawler Craton, 2002. State of play. [Notes to accompany viewing of the ancillary] Drill core display.
This geotechnical workshop of seminars and core displays, which was held over two days on 5-6 December 2002, aimed to highlight recent collaborative research between PIRSA [MER], Geoscience Australia and the South Australian mineral industry that has...-
Document
Published: 01 Dec 2002