-
RB 77/00107 Evolution of the Middle Proterozoic Chandabooka Caldera, Gawler Range acid
Volcanism associated with the Middle Proterozoic Gawler Range acid volcano-plutonic province was initiated in the Kokatha area by the construction on Archaean basement of a large stratovolcano composed mainly of tholeiitic basalt and potassic basaltic...-
Document
Published: 20 Sep 1977
-
Data release [made at SA Director of Mines' discretion] : Bulgunnia (part of the Gawler JV Project). Annual reports for the period 19/11/1997 to 1/1/2013.
Within an area of the Wilgena and Christie Domains centred 40 km north of Tarcoola, exploration is continuing for Archaean to Proterozoic basement-hosted epithermal, hydrothermal and metamorphic type gold and base metal occurrences. Here an 841 square...-
Document
-
Maitland. First partial surrender report, for the period 25/8/2008 to 24/8/2015.
58 square km of the Area C southernmost sub-block of EL 5320 have been relinquished to compensate for a shortfall in exploration spending against commitments. During the past seven years, the only work performed on the relinquished ground was the...-
Document
Published: 20 Mar 1916
-
Buckleboo (part of the Buckleboo Project). Combined first annual/final report at licence full surrender, for the period 7/1/2014 to 20/2/2015.
A very small area located ~25 km north-west of Kimba has been explored for possible economic buried base and precious metal mineralisation that may have formed within Archaean metasedimentary bedrock and be related to younger igneous intrusions....-
Document
-
The Eyre Peninsula Project, and in part the Corrobinnie Uranium Joint Venture. Joint annual reports for the period 29/12/2008 to 31/12/2013.
During the sixth year of the project, licensee Adelaide Resources did not do any exploration directed at gold or base metals that might possibly occur on the subject tenements. However, its joint venture partner Quasar Resources undertook significant...-
Document
Published: 05 Mar 1914
-
Data release - as updated : Maitland (the Yorke Peninsula Copper Project). Annual reports plus final report to licence expiry/full surrender, for the period 25/8/2008 to 24/8/2017.
An area of the western Yorke Peninsula, comprising three separate sub-blocks, was taken up to explore for possible economic buried IOCG-U deposits similar to those at Hillside (located 25 km to the east of sub-block 'B'), Olympic Dam, Prominent Hill...-
Document
Published: 18 Oct 1917
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Double. Annual reports for the period 24/11/2005 to 28/9/2018.
Exploration is being conducted for possible buried economic iron oxide - associated copper-gold (IOCG) mineral deposit targets within the south-central Gawler Ranges. During the first licence year, Minotaur's activities focussed on completing a...-
Document
Published: 22 Nov 1912
-
Data release - as updated [made at SA Director of Mines' discretion] : South Gawler Project. Joint annual technical report for the period 01/01/2017 to 31/12/2018.
Southern Gawler Ranges Project. This Report has been prepared by Terramin Australia Ltd on behalf of Menninnie Metals Pty Ltd (a 100% subsidiary of Terramin Australia Ltd). The Southern Gawler Ranges Project forms the eastern part of the Gawler...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Ive Project. First annual report, for the period 1/1/2016 to 31/12/2016.
The “Mt Ive Project” forms the western part of the “Gawler Ranges Project”. The “Gawler Range Project” comprises 11 tenements covering a total area of 4,749 km2 in northern Eyre Peninsula. All 11 tenements are licenced to and operated by Menninnie...-
Document
-
Mount Double. First partial surrender report for the period 24/11/2005 to 23/11/2007.
Exploration for possible buried economic iron oxide - associated copper-gold (IOCG) mineral deposit targets within the subject relinquished area of the south-central Gawler Ranges utilised existing regional gravity data to attempt to identify...-
Document
-
Conical Hill. First partial surrender report for the period 18/1/2006 to 17/1/2008.
Work done for EL 3486 during the first two years of tenure comprised reviews of existing geological and geophysical information conducted independently by Minotaur Exploration and Toro Energy. EL 3486 was partly covered by a major government-funded...-
Document
-
Carnding. Annual reports and final report to licence full surrender, for the period 18/1/2006 to 22/2/2012.
Three separate small sub-blocks forming a licence in the Tarcoola district have been explored for possible economic buried Tertiary sandstone-hosted uranium mineralisation and for any other metallic mineralisation that may have formed in underlying...-
Document
Published: 29 Feb 1912
-
Data release [made at SA Director of Mines’ discretion] : Tarcoola. Annual reports to licence expiry/renewal, for the period 2/6/2003 to 1/6/2008.
Exploration Licence 3089 is located in the central Gawler Craton and is centred near the township of Tarcoola. Continuation of tenure over the same area, from former ELs 1827 and 2510, was renewed by Gravity Capital Ltd on 2/6/2003, and full licence...-
Document
-
PACE 2020 Discovery Drilling 2012 : Year 7 Drilling Partnership no. DPY7-30 - Trafford Resources Ltd, Wilcherry Hill Project, Oxy's Bore prospect magnetic anomaly IOCG target. Drilling project final report.
Trafford Resources Ltd ('Trafford'), the owner since March 2007 of the seven exploration licences comprising the Wilcherry Hill Project, has as its primary focus exploration of these tenements for economic precious and base metal deposits. The...-
Document
-
Myall Creek. Progress reports to licence full surrender, for the period 14/5/1998 to 30/3/2000.
Exploration for Olympic Dam type Cu-Au in the Myall Creek area, located 15-50 km north of Whyalla, comprised surface geological mapping and orientation calcrete geochemical sampling, together with the re-logging, petrographic examination and...-
Document
-
Wedge Hill (Mount Wedge Project). Annual and final reports for the period 26/5/1997 to 25/5/1999.
Groundwater sampling, aeromagnetic interpretation, shallow auger sampling and isotope studies were carried out over an area 30 km northeast of Elliston. Heavy mineral concentrates from composite auger samples contained zircon, galena and sphalerite,...-
Document
-
Hiltaba. Progress and final reports for the period 22/6/1972 to 21/6/1973.
Rock chip and stream sediment samples were analysed for U, Th and base metals. In addition, water samples from bores were analysed for U. All assays were low. It was concluded that the Hiltaba Granite has slightly elevated but insignificant levels...-
Document
Published: 17 Oct 1973
-
RB 2002/00028 Gawler Craton, 2002. State of play. [Notes to accompany viewing of the ancillary] Drill core display.
This geotechnical workshop of seminars and core displays, which was held over two days on 5-6 December 2002, aimed to highlight recent collaborative research between PIRSA [MER], Geoscience Australia and the South Australian mineral industry that has...-
Document
Published: 01 Dec 2002