South Vivian [Homestead]. Annual reports and final report to licence expiry/full surrender, for the period 12/6/2007 to 11/6/2009.
An area located on the northern Stuart Shelf between Olympic Dam and Prominent Hill, approx. 50 km south-southwest of the latter, has been explored for possible Olympic Dam type iron oxide - associated copper-gold (IOCG) deposits and for Canadian...-
Document
Published: 17 Oct 1909
-
Port Broughton, Redhill and Mount Remarkable - Port Augusta areas (part of the Moonta North Project ELs combined reporting group). Annual reports and joint final report at licences' surrender, for the period 19/4/2002 to 22/5/2006.
Economic deposits of iron-oxide associated copper-gold mineralisation of the Moonta-Wallaroo or Olympic Dam style, hosted in Palaeoproterozoic basement rocks of the Moonta Sub-domain, were targeted by exploration in three now surrendered licences,...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 4 partnership no. DPY4-65, Chianti mineral prospect. Project completion dataset.
The subject set of reports describes the results of PACE Initiative Year 4 partly-subsidised drilling work conducted in the vicinity of the Chianti prospect, which lies approx. 20 km north of the old Mount Gunson mining camp. The aim of this work,...-
Document
-
Mount Paisley (part of the Mount Woods Project). Fourth partial surrender report for the period 23/3/2000 to 8/8/2009.
Exploration Licence 3387 (Mt Paisley) is located about 110 km north-west of Woomera, 110 km west-northwest of Olympic Dam, and 45 km south-east of Prominent Hill. The EL lies within the Woomera Prohibited Area (WPA), and most of the tenement covers...-
Document
-
Andamooka Creek, Willaroo Dam, Island Dam and Stuart Shelf / Andamooka Ranges (the Stuart Shelf Project). Joint annual reports on activities undertaken by the Joint Venture consortium, for the period 11/10/1996 to 10/10/2009 [ Index Part 2 of 2 ].
As a result of the BHP Billiton takeover of the Stuart Range Project, the mineral exploration strategy was changed. Formerly, WMC had been looking for economical targets of >500 Mt size containing on average more than 2.4% copper equivalent....-
Document
-
Data release [made at SA Director of Mines' discretion] : Mullaquana. Annual reports for the period 20/11/2006 to 19/11/2009.
A tenement area located close to and along the eastern seaboard of the Eyre Peninsula, and which extends from Whyalla southwards for approximately 60 km, has been taken up to explore for possible economic buried primary, hard rock hosted uranium and...-
Document
Published: 20 Jun 1910
-
Mount Arden (part of the Six Mile Hill Project). First annual report, plus second annual/final report to licence expiry/full surrender, for the period 13/10/2014 to 12/10/2016.
An irregular area covering pastoral land ~15 km to the immediate west and north-west of Port Augusta has been explored for possible economic buried IOCG and other significant metallic mineralisation, which could have formed in the vicinity of the...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-36, Roopena area copper/gold mineral prospects. Project interim and final reports.
Three previously untested, significant gravity anomalies were the targets for 4 exploratory vertical RC drillholes totalling 750 m, put down in areas west and north-west of Whyalla by Minotaur Exploration with funding assistance from PIRSA through its...-
Document
-
Maitland. First partial surrender report, for the period 25/8/2008 to 24/8/2015.
58 square km of the Area C southernmost sub-block of EL 5320 have been relinquished to compensate for a shortfall in exploration spending against commitments. During the past seven years, the only work performed on the relinquished ground was the...-
Document
Published: 20 Mar 1916
-
Chinaman Hat Hill. First annual report plus final report to licence full surrender, for the period 20/6/2013 to 18/12/2014.
No work performed. A desktop assessment of indicated IOCG prospectivity concluded that the tenement, located ~ 16 km north of Tasman Resources' Titan prospect, had high risk due to a muted basement geophysical response and the poorly constrained but...-
Document
Published: 21 Jan 1915
-
Data release - as updated : Crystal Brook and Port Pirie (the Wandearah Project). Joint annual reports to licences' respective full surrenders, for the period 2/8/2008 to 26/4/2018.
Buried basement-hosted iron oxide - associated copper-gold (IOCG) mineralisation of either Moonta-Wallaroo or Olympic Dam style is the target of ongoing exploration on the two adjacent subject tenements. In addition, the current holder considers that...-
Document
Published: 29 May 1918
-
Data release - as updated : Maitland (the Yorke Peninsula Copper Project). Annual reports plus final report to licence expiry/full surrender, for the period 25/8/2008 to 24/8/2017.
An area of the western Yorke Peninsula, comprising three separate sub-blocks, was taken up to explore for possible economic buried IOCG-U deposits similar to those at Hillside (located 25 km to the east of sub-block 'B'), Olympic Dam, Prominent Hill...-
Document
Published: 18 Oct 1917
-
PACE 2020 Discovery Drilling 2012 : Year 7 Drilling Partnership no. DPY7-18 - Phoenix Copper Limited Yorke Peninsula Project. Drilling project final report.
Phoenix Copper is exploring tenements which cover an area of approximately 802 square km on the west coast of the Yorke Peninsula, the company's prime objective being to discover an economic iron oxide - associated copper-gold-uranium (IOCGU) deposit...-
Document
Published: 13 Nov 1912
-
Data release - as updated [made at SA Director of Mines' discretion] : Mullaquana (part of the Mullaquana, later called Samphire, Uranium Project). Annual reports for the period 20/11/2009 to 19/11/2018.
During licence Year 4, UraniumSA undertook the following work on EL 3652: - pattern drilling of 232 rotary mud holes totalling 18,416 m, targeting the Blackbush and Plumbush prospects. - core drilling totalling 876 m in 8 holes, to characterise...-
Document
Published: 03 Dec 1918
-
Data release - as updated [made at SA Director of Mines' discretion] : Ardrossan, Minlaton and Ardrossan coast areas (the Pine Point Project). Joint annual reports for the period 2/8/2008 to 1/8/2014.
Rex Mineral’s ('Rex') primary objective in the Pine Point Project area is to determine the potential for economic basement-hosted iron oxide - associated copper-gold mineralisation such as that found at Olympic Dam, Prominent Hill, Ernest Henry and...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Island Dam, Stuart Shelf and Andamooka Ranges (the Stuart Shelf Project). Joint annual reports for the period 11/10/2009 to 30/6/2018.
Exploratory drilling carried out by BHP Billiton (BHPB) during the 2009-10 project reporting year took place at six prospects thought to have good IOCG mineralisation potential, based in part on earlier drilling results and also on refined target...-
Document
Published: 30 Aug 1918
-
The Gawler Craton Project [Part]. Data release made in lieu of partial surrender/joint annual reports for the period 3/2/2010 to 1/2/2019, plus letters giving permission to release owed licence partial relinquishment and surrender reports.
As part of a regional search for possible major deposits of IOCG type mineralisation, Golden Cross Resources took up six exploration tenements in the northern Gawler Craton that lie to the north and north-east of Coober Pedy, and which are within or...-
Document
Published: 23 Jun 1915
-
Port Hughes. Annual reports and final report to licence full surrender, for the period 29/11/2010 to 17/8/2017.
A licence consisting of three separate small sub-blocks that cover a large number of freehold broad-acre farms in the Bute - Agery - Moonta South district has been explored for possible buried economic IOCG mineralisation, which may have formed on or...-
Document
Published: 31 Aug 1917
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 4 of 4 ].
During licence Year 12, following encouraging results made by its continuing exploratory drilling, Gunson Resources was able to negotiate a joint venture over the Mount Gunson Project tenements with Falconbridge Limited through its subsidiary Noranda...-
Document
-
Data release [made at SA Director of Mines' discretion] : Parakylia. First annual report for the period 8/10/2012 to 7/10/2013.
An area centred ~20 km west-northwest of the Olympic Dam copper-gold-uranium mine is being explored for possible economic, similar IOCG type mineralisation that may have formed in buried Mesoproterozoic basement, but underlying much thicker cover than...-
Document
Published: 04 Dec 1913