-
Data release - as updated : Lake Gilles (part of the East Eyre [Peninsula] Project). Annual reports to licence expiry/full surrender, for the period 22/12/2005 to 28/11/2016.
Exploration aimed primarily for economic buried Menninnie Dam - style base and precious metals mineralisation hosted by Palaeoproterozoic metasedimentary basement has been conducted on a licence located in the Lake Gilles district. The subject area...-
Document
Published: 11 Jan 1917
-
Data release - as updated [made at SA Director of Mines' discretion] : Wild Horse Plain. Annual reports for the period 8/7/2005 to 23/2/2019, plus partial surrender reports to 23/2/2021.
An upland area located approximately 100 km south-west of Whyalla on the eastern Eyre Peninsula, and with its eastern boundary running parallel to the coast at a distance of 15 km from Cowell and Franklin Harbour, is being explored for uranium,...-
Document
Published: 11 Jan 1921
-
Mount Olinthus. Annual report to licence expiry/renewal, for the period 6/3/1995 to 5/3/1996.
Base metal mineralisation, indicated by newly discovered shafts at the historic Atkinson Pb-Ag-Cu-Zn mine, was the impetus for exploration in the upland area 20 km north-west from Cowell. Grab samples collected from shafts, stockpiles and dumps varied...-
Document
-
Lake Gilles (part of the East Eyre Peninsula Project). Second partial surrender report, for the period 22/12/2005 to 13/9/2016.
Approximately one-third of the southernmost sub-block 'D' of the subject EL 5109 has been relinquished to comply with expenditure commitments made for the East Eyre Peninsula Project. Activities within the now relinquished area have consisted of...-
Document
Published: 10 Oct 1916
-
Data release - as updated [made at SA Director of Mines’ discretion] : Carappee Hill. Annual reports for the period 20/2/2010 to 19/2/2019.
The continuation during 2010 of exploration of the Palaeoproterozoic bedrock in a small area located 60 km west-northwest of Cowell has mainly consisted of the conduct of three shallow drilling campaigns and the examination and analysis of downhole...-
Document
Published: 25 Feb 1919
-
Moseley Nobs (part of the East Eyre Peninsula Project). Third partial surrender report, for the period 5/7/2006 to 4/7/2015.
EL 4860 has been part of the Investigator Resources Ltd tenement holding since that company was spun-off from Southern Gold in 2007 (as Sunthe Uranium Ltd). The Eastern Eyre Peninsula project group of licences, which lie along and just beyond the...-
Document
Published: 08 Oct 1915
-
Data release - as updated [made at SA Director of Mines’ discretion] : Middleback Range and Moonabie Hills. Joint annual reports for the period 1/2/2007 to 30/1/2019, plus surrender reports to 9/7/2023.
Project Connelly is designed to target haematite mineralisation on OneSteel's mining and exploration leases, including EL 3516 Middleback Range, with the aim of adding to the haematite reserve. In addition to the exploration programme, reserve...-
Document
Published: 29 Mar 1918
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 1 of 2].
Aquila Resources took up ownership of the much previously-explored ground comprising the Wilcherry Hill Project with the intent of exploring for the first time the iron oxide - associated copper-gold & uranium (IOCG-U) mineralisation potential of...-
Document
Published: 31 Dec 1908
-
Data release [made at SA Director of Mines' discretion] : Mosely Nobs (part of the East Eyre Peninsula Project). Annual reports for the period 5/7/2006 to 4/7/2016.
A licence area now consisting of two separate small blocks located about 60 km west of Whyalla was taken up, along with other ground in the region, because it is thought to have potential for the discovery of uranium associated with Olympic Dam style...-
Document
-
Geology of the Roopena and Uno 1:100 000 sheet areas, eastern Gawler Craton.
This report describes the results of a MESA consultant's second generation regional geological mapping and drillhole data interpretation work for the Roopena and Uno 1:100 000 sheets on PORT AUGUSTA, performed during 1993 and 1994 as part of the SAEI...-
Document
-
Pinerow. Annual and final reports to licence expiry/full surrender for the period 2/10/2004 to 9/11/2008.
To continue the assessment of the dimension stone and ornamental stone potential of granitic basement outcrops present on EL 2851, a 5-year Retention Lease, RL 116, was taken out on 7/2/2006 to cover 5.9 ha of the Middle Camp granite pluton. Several...-
Document
Published: 08 Jan 1909