-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-40 - western Middleback Range region - Stony Hill area Archaean to Proterozoic stratabound iron ore mineral prospects. Project final report.
Banded iron formation (BIF) rock outcrops and an associated 15 km long aeromagnetic anomaly located about 20 km west of Iron Baron were chosen by Centrex Metals as high quality targets deserving of exploration for economic iron mineralisation...-
Document
Published: 28 Nov 1908
-
Lake Gilles. Progress reports to licence expiry/full surrender, for the period 19/5/1969 to 18/5/1970.
Exploration for possible economic hypogene base metal sulphide deposits associated with poorly exposed iron-rich linear outcrops, overlying faulted Archaean to Palaeoproterozoic basement which is obscured by extensive Cainozoic sedimentary cover rocks...-
Document
Published: 01 Apr 1970
-
Data release [made at SA Director of Mines’ discretion] : Gum Flat. Annual reports submitted prior to the commencement of joint reporting on the Gum Flat Iron Ore Project, for the period 27/9/2005 to 26/9/2008.
An area lying immediately west of Port Lincoln and extending for ~10 km inland is being explored for buried occurrences of multiple metallic mineral commodities that may have been deposited within faulted, folded and metamorphosed Archaean basement...-
Document
Published: 20 Nov 1907
-
Data release - as updated : Gum Flat, Wanilla, Cummins, Tarlinga and Yeelanna (the Gum Flat Iron Ore Project). Joint annual reports submitted until the joint full surrender of remaining project licences, for the period 1/7/2010 to 18/01/2022.
During 2010-2011, the third year of the Gum Flat Iron Ore Project, owner Lincoln Minerals' exploration activities included: - Planning, site preparation and supervision of an RC and aircore drilling program; - Surveying and vegetation clearing for...-
Document
Published: 09 Jan 1920
-
Strawberry Hill. Progress and final reports to licence expiry for the period 4/10/89 to 3/1/94.
Exploration in the Wanilla - Cummins area searching for economic accumulations of heavy minerals in Eocene sands comprised 2 phases of aircore drilling (167 holes, total 4049 m). A resulting drill intersection yielded a 0.72% heavy-mineral...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Middleback Range and Moonabie Hills. Joint annual reports for the period 1/2/2007 to 30/1/2019, plus surrender reports to 9/7/2023.
Project Connelly is designed to target haematite mineralisation on OneSteel's mining and exploration leases, including EL 3516 Middleback Range, with the aim of adding to the haematite reserve. In addition to the exploration programme, reserve...-
Document
Published: 29 Mar 1918
-
Eureka Bluff, Mount Nott and Mount Ive (the Gawler Range Volcanics Project). Joint venture partners' progress reports and final reports, for the period 17/6/1983 to 16/6/1988.
TARGET: Diamonds in possible kimberlite intrusives; and (as JV objectives), possible exhalative lead-zinc-silver deposits of Broken Hill or Aggeneys - Gamsberg type, emplaced within the Early Proterozoic Hutchison Group, plus possible epithermal...-
Document
Published: 10 Oct 1988
-
Bull 037 Geology and Mineral Resources of Southern Eyre Peninsula
A regional geological survey covered 15 standard 1-mile map sheets. Detailed mapping established a 50 000 ft sequence of Archaean sedimentation of gneissose, schistose and granitoid rocks, migmatite, quartzite, dolomite and haematitic quartzite. These...-
Document
-
The Southern Eyre Peninsula JV Project. Joint annual reports for the reporting period 1/7/2006 to 31/1/2017, plus licence-specific final reports submitted at their later full surrenders.
During the first year of the project (2006-2007), no work was undertaken on ELs 3731, 3421 or 3611. On EL 3317 Wilgerup, at the Wilgerup North Pod, Centrex undertook 2 phases of RC drilling totalling 135 holes for 12,829 m to provide information to...-
Document
Published: 09 Apr 1919
-
Data release - as updated : Cockabidnie. Annual reports and final report to licence expiry/full surrender, for the period 31/5/2001 to 13/8/2015.
Early in 2001, Helix Resources Ltd entered into a joint venture agreement with Centrex Resources Limited to allow it to explore for precious and base metals on some of the tenements held by Centrex on the Eyre Peninsula in South Australia, including...-
Document
-
Data release - as updated : Kimba. Annual reports to licence expiry/full surrender, for the period 6/11/2006 to 5/11/2018.
A large, 705 square km area surrounding Kimba township was taken up to explore for possible economic buried deposits of Mount Isa or Broken Hill style base metals (Cu-Pb-Zn-Ag), and Tanami style lode gold. The licence lay in the northern part of the...-
Document
Published: 09 Jan 1919
-
Mount Hill (part of the Gum Flat Iron Ore Project). Final report at licence full surrender, for the period 25/2/2008 to 27/8/2015.
A small part of the Lincoln Uplands on east-central Eyre Peninsula, which is centred ~20 km north-east of Cummins, has been explored for possible economic buried graphite and/or base metal mineralisation that may have formed in metamorphosed...-
Document
Published: 22 Jun 1915
-
Wanilla (originally part of the Wanilla JV Project). Annual reports submitted until the commencement of licences' joint reporting for the Gum Flat Iron Ore Project, for the period 13/2/2007 to 12/2/2010.
A large north-south orientated area centred ~45 km north-west of Port Lincoln was taken up to explore for possible buried Archaean komatiite-hosted nickel, volcanic hosted massive sulphides (base metals), orogenic lode gold, BIF-hosted iron ores and...-
Document
Published: 01 Jun 1910
-
Green Patch. Progress, annual and final reports to licence surrender for the period 8/7/1991 to 1/3/1996.
Following a review of previous company exploration and image interpretation of SAEI and BMR aeromagnetic data, a 3166 line km airborne magnetic/radiometric survey, with follow-up ground magnetics and air core drilling (282 holes, 4559 m), was carried...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-27 - Cleve area Proterozoic unconformity-style uranium mineral prospects. Project final report.
In May 2009 a total of 45 aircore blade or hammer holes (total penetration 1332 m) were drilled by Adelaide Resources along six northeast-southwest trending traverses laid out immediately south-west of Cleve, to test a conceptual unconformity - style...-
Document
-
RB 90/00001 Explanatory Notes for the KIMBA 1:250 000 geological map.
The KIMBA 1:250 000 geological map sheet (hereafter referred to as KIMBA) lies in central Eyre Peninsula, extending between latitudes 33° to 34° S and longitudes 135° to 136°30'E (Fig 1). The principal towns are Kimba and Cleve, with smaller towns at...-
Document
Published: 01 Dec 1989