-
RB 99/00032 Trial dewatering of the BHP dolomite quarry at Ardrossan, South Australia.
Trial dewatering of the quarry, which is excavated in fractured and well-bedded Cambrian dolomite, took place for at least 56 days during early 1994, but pumping was terminated when a further significant water level drawdown could not be achieved. Ten...-
Document
Published: 01 Dec 1999
-
Maitland [second JV programme]. Progress reports for the period 17/8/81 to 14/5/84.
Continuing mineral exploration work over central Yorke Peninsula under a new joint venture arrangement with a different company, now targetting possible Phanerozoic sedimentary uranium in Cambrian and Tertiary strata, has consisted of investigations...-
Document
-
Minlaton South 1, 3.75 miles south of Minlaton Township. Well completion details and related reports.
Minlaton South 1 was a shallow stratigraphic test well drilled by Beach Petroleum to investigate a possible ?Archaean basement high subcropping 3.75 miles south of Minlaton township, as suggested by SADM regional mapping observations made during 1961....-
Document
Published: 15 Jun 1966
-
RB 2001/00017 TER 001, Yorke Peninsula. Well completion report.
Drillhole TER 1, funded by the TEISA program, was drilled to test basement depth and stratigraphy to the west of Minlaton, Yorke Peninsula. This drilling project followed TEISA aeromagnetic and geological surveys of the Peninsula in 1999, which had...-
Document
Published: 01 Nov 2001
-
Yorke Peninsula palaeochannel - Adelaide's long-term sand source.
There is no abstract created for this record-
Document