Skip to content
Search Home
SARIG catalogue
  • HomeHome
  • Search Records
  • FAQs
  • Vocabularies
  • SARIG map SARIG map
  1. Datasets

Datasets

The mesac Open Data Portal datasets contain detailed records of seismic surveys and geochemical data, and they are made available here to industry, researchers and the public.
FILTER RESULTS
RESET
draw to search by area BY DRAWN AREA
RESET
Location SA

TYPE OF RECORD

  • document - (39)

TOPIC

  • Geoscientific Information - (39)

CATEGORY TYPE

  • Earth Sciences - (39)
    • Geochemistry - (39)
      • Exploration Geochemistry - (38)
      • Isotope Geochemistry - (4)
      • Biogeochemistry - (1)
    • Geology - (39)
      • Mineral System Geology - (37)
      • Resource Geology - (35)
        • Mineral Resource Geology - (39)
        • Quarry And Extractive Resource Geology - (6)
      • Petrology - (34)
        • Igneous And Metamorphic Petrology - (14)
      • Regional Geology - (33)
      • Stratigraphy - (33)
      • Sedimentology - (26)
      • Surface Geology - (24)
      • Mineralogy And Crystallography - (22)
      • Basement Geology - (16)
      • Historical Geology - (15)
      • Volcanology - (8)
      • Geochronology - (6)
      • Basin Analysis - (1)
    • Geophysics - (39)
      • Electrical And Electromagnetic Methods In Geophysics - (34)
      • Magnetics - (33)
      • Gravity - (15)
      • Petrophysics - (11)
      • Radiometrics - (7)
    • Physical Geography - (29)
      • Geomorphology And Regolith And Landscape Evolution - (10)
      • Surface Processes - (6)
      • Surfacewater Hydrology - (5)
      • Hydrogeology - (3)
      • Quaternary Environments - (1)
  • Engineering - (39)
    • Geomatic Engineering - (34)
      • Cartography - (3)
      • Photogrammetry And Remote Sensing - (3)
      • Geospatial Information Systems - (2)
      • Remote Sensing - (2)
      • Geodesy - (1)
    • Resources Engineering - (34)
      • Drilling Engineering - (28)
      • Mineral Processing/Beneficiation - (9)
      • Mining Engineering - (5)
      • Electrometallurgy - (1)
      • Geomechanics And Resources Geotechnical Engineering - (1)
      • Hydrometallurgy - (1)
    • Civil Engineering - (3)
  • Policy And Administration - (37)
  • Mineral Resources (Excl. Energy Resources) - (34)
    • Mineral Exploration - (39)
    • Primary Mining And Extraction Of Mineral Resources - (21)
  • Environmental Sciences - (27)
    • Soil Science - (24)
      • Soil Chemistry - (15)
    • Environmental Science And Management - (16)
      • Environmental Management - (6)
  • Information And Computing Sciences - (26)
    • Artificial Intelligence And Image Processing - (7)
      • Image Processing - (7)
      • Expert Systems - (2)
      • Simulation And Modelling - (1)
    • Computation Theory And Mathematics - (2)
  • Energy - (17)
    • Energy Exploration - (15)
    • Preparation And Production Of Energy Sources - (1)
  • Built Environment And Design - (5)
    • Urban And Regional Planning - (5)
  • Biological Sciences - (3)
    • Ecology - (3)

DOCUMENT TYPE

  • Mineral Company Report - (35)
    • Mineral Exploration - (35)
  • Departmental Publication - (4)
    • Geological Survey Geoscience Publication - (2)
    • Bulletin - (1)
    • Closed Series - (1)
      • Commodity Review - (1)

COMMODITY

  • iron - (29)
  • iron ore - (20)
  • magnetite - (13)
  • industrial material - (12)
  • Critical minerals - (10)
  • copper - (8)
  • precious metal - (6)
  • uranium - (6)
  • graphite - (5)
  • dimension stone - (4)
  • gold - (3)
  • granite - (3)
  • gypsum - (3)
  • lead - (3)
  • manganese - (3)
  • zinc - (3)
  • zircon - (3)
  • carbonaceous material - (2)
  • silver - (2)
  • anthophyllite - (1)

GEOLOGICAL PROVINCE

  • Gawler Craton - (39)
  • Cleve Subdomain - (28)
  • Coulta Subdomain - (6)
  • Gawler Range Volcanic Province - (5)
  • Adelaide Geosyncline - (1)
  • Benagerie Ridge - (1)
  • Christie Subdomain - (1)
  • Curnamona Province - (1)
  • Delamerian Orogen - (1)
  • Mount Woods Inlier - (1)
  • Nawa Subdomain - (1)
  • Spencer Domain - (1)

STRATIGRAPHY

  • Lower Middleback Jaspilite - (39)
  • Hutchison Group - (30)
  • Middleback Subgroup - (17)
  • Cook Gap Schist - (16)
  • Katunga Dolomite - (15)
  • Gawler Range Volcanics - (10)
  • Upper Middleback Jaspilite - (6)
  • Hiltaba Suite - (5)
  • Blue Range Beds - (3)
  • Cooyerdoo Granite - (3)
  • Corunna Conglomerate - (3)
  • Warrow Quartzite - (3)
  • Bittali Rhyolite - (2)
  • Burkitt Granite - (2)
  • Aldgate Sandstone - (1)
  • Charleston Granite - (1)
  • Gairdner Dolerite - (1)
  • Giles Complex - (1)
  • Lincoln Complex - (1)
  • Lincoln Gap Siltstone Member - (1)

FORMAT

  • PDF - (39)

UPDATE FREQUENCY

There are no UPDATE FREQUENCY that match this search

PUBLICATION DATE

Specific date: 1980, 20/04/1980, 04/1980

Date range: 1980-2022, 04/1980-08/1990

close
Search records
ADVANCED KEYWORD SEARCH
Include the following keywords:

39 records found

Stratigraphy: Lower Middleback Jaspilite Category type: Geophysics Geological province: Gawler Craton

Filter Results
  • Cooyerdoo Station. Progress reports to licence expiry/re-issue as part of another licence, for the period 14/9/1981 to 13/3/1983.

    Following the signing of an eighteen month exploration joint venture agreement with Stockdale, farminee Mobil Energy Minerals undertook continuation of the uranium search over the anomalous ground lying east and south-east of Lake Gilles, besides...
      Document Published: 12 Apr 1983
    • PDF
  • RB 36/00082 Wagon drilling programme, Katunga Hills, Middleback Range. Progress report.

    Report presents results of reconnaissance wagon [rotary percussion] drilling of 24 vertical iron ore exploration boreholes carried out along four drill traverses laid out on the upland portions of the Katunga Hills, during a campaign progressed during...
      Document Published: 04 Nov 1953
    • PDF
  • RB 60/00025 Geological report no. 1 on Brennand anomaly, Hd Koppio, southern Eyre Peninsula, Cummins 1-mile sheet.

    A potential iron ore deposit has been investigated in the upper horizon of jaspilite beds of the Hutchison Group, where a drag fold has caused a thickening of the jaspilite beds. Surface samples average 42.2% acid soluble iron. The deposit has a...
      Document Published: 08 Feb 1965
    • PDF
  • Wilcherry Hill. Data release made in lieu of submitting a first partial relinquishment report at licence expiry/renewal : progress reports and annual reports for the period 8/9/1980 to 15/4/2003.

    [incomplete : to be continued when time permits] - The Wilcherry Hill licence area was originally taken up in September 1980 by the Shell Company as EL 719, forming part of a larger regional mineral exploration tenement package on northern and...
      Document Published: 14 Dec 1905
    • PDF
  • PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-44, Wilgerup (southern Gawler Craton) haematitic iron ore prospect. Project final report.

    Centrex Metals commenced reverse circulation exploration and resource definition drilling at the Wilgerup iron ore deposit on 6/9/2006, which was partly funded by the PACE Initiative as a Year 3 approved project, with funds allocated for 1000 m of RC...
      Document Published: 20 Apr 1907
    • PDF
  • Koppio, Glengyle and Moreenia. Joint first annual plus final reports for the period 9/9/97 to 8/9/99.

    Laterite, BCL drainage and soil geochemical sampling, plus the re-assaying of previous drillhole samples, were carried out in the Port Neill - Tooligie - Port Lincoln area of southern Eyre Peninsula. No significant gold or base metal anomalism was...
      Document
    • PDF
  • Koppio. Partial surrender report for the period 9/9/1997 to May 1999.

    Regional lag/laterite geochemistry performed over interpreted Palaeoproterozoic basement iron oxide - hosted copper-gold targets 30 km west of Tumby Bay yielded elevated Au, As, Cu and Pb values. Complementary drainage sampling geochemistry results...
      Document
    • PDF
  • Lake Gilles area. Data release made in lieu of submitting a partial surrender report upon licence renewal : progress reports for the period 26/10/1989 to 10/2/2001.

    Menninnie Dam - style Pb-Zn mineralisation in areas north and east of Lake Gilles was the initial target of exploration. A ground magnetic survey conducted along five lines was followed by shallow auger drilling (302 holes, total 1099 m) plus lag,...
      Document
    • PDF
  • Menninnie Dam (part of the Fleurieu - Menninnie Dam Exploration Joint Venture Project). Combined annual report for the 5-year period 24/9/2005 to 26/10/2010, plus annual reports for the period 27/10/2010 to 26/10/2012.

    During the 5-year period 2005-2010, intensified exploration undertaken at Menninnie Dam was focussed on the discovery and delineation of structurally controlled hydrothermal Pb-Zn-Ag mineralisation. Carbonate-rich Hutchison Group metasediments forming...
      Document
    • PDF
  • Pondooma / Ironstone Hut (part of the Northern Eyre Peninsula Project). Final report at licence full surrender, for the period 3/12/2002 to 24/9/2015.

    An area originally granted as Exploration Licence 3048 Pondooma, which consisted of two separate sub-blocks centred ~60 km south-west of Whyalla, was applied for to cover a poorly exposed belt of banded iron formation (BIF) strata identified on...
      Document
    • PDF
  • Data release [made at SA Director of Mines’ discretion] : Menninnie Dam (part of the Fleurieu - Menninnie Dam Exploration Joint Venture Project). Annual reports for the period 24/9/2001 to 23/9/2005.

    The buried Menninnie Dam zinc-lead(-silver-copper) deposit, located approximately 55 km north of Kimba on northern Eyre Peninsula, and sitting adjacent to the south-eastern margin of the Gawler Ranges, is being evaluated for its future commercial...
      Document
    • PDF
  • Data release - as updated [made at SA Director of Mines' discretion] : Lipson Cove. Annual reports for the period 29/9/2009 to 28/9/2014.

    An area in the Cowell Hills centred ~20 km north of Tumby Bay on eastern Eyre Peninsula was taken up primarily to explore and evaluate known talc and graphite occurrences, but the grant licensee's initial review of previous exploration data revealed...
      Document Published: 12 Dec 1914
    • PDF
  • Stony Hill (part of the Northern Eyre Peninsula JV Project). Final report at licence full surrender, for the period 2/12/2004 to 23/12/2016.

    During the life of the subject licence, the focus of exploration was to determine the area's potential for DSO haematite iron ore, with a secondary consideration being magnetite and haematite BIF. After conducting geophysical surveys and exploratory...
      Document Published: 17 Jan 1917
    • PDF
  • Data release - as updated [made at SA Director of Mines’ discretion] : Waddikee. Annual reports for the period 24/5/2010 to 31/1/2018.

    During licence Year 6, on renewed EL 4662, Monax and its JV earn-in partner OMM undertook auger soil geochemical sampling, ground magnetic and IP surveys, and exploratory drilling in their continuing search for economic iron ore and manganese...
      Document
    • PDF
  • The Northern Eyre Peninsula JV Project. Data release made in lieu of submitting a licence final report at the full surrender of EL 5170 Kimba Gap: Joint annual reports for the period 1/2/2013 to 9/2/2017.

    During the Northern Eyre Peninsula Project (NEPP) 2013-2014 reporting year, exploration field work took place on two of the six project tenements. On EL 4884 Minbrie, a single 151 m deep vertical RC drillhole, BURC092, was completed in August 2013,...
      Document Published: 25 Sep 1918
    • PDF
  • Bull 033 The Geology and Iron Ore Resources of the Middleback Range Area

    This report deals comprehensively with the physiography, prospect geology, and ore genesis, and includes an assessment of the iron ore reserves and other mineral resources of an area which has been almost the sole source of the iron ore used in...
      Document
    • PDF
  • ComRev 008 Iron Ore in South Australia 2000

    The iron-rich rocks of South Australia have been classified into six deposit types - residual, chemical sedimentary iron formations, Fe-skarn and, of lesser significance, hydrothermal, clastic and magmatic. Production has been overwhelmingly from...
      Document
    • PDF
  • Kimba Gap [South] (part of the Middleback Range Iron Ore Joint Venture Project). Annual reports [to the commencement of the Northern Eyre Peninsula Project licences' combined reporting status] for the period 17/9/2003 to 16/9/2006.

    A small exploration licence area centred approximately 50 km west-northwest of Whyalla, which is mainly covered by Quaternary sediments, has been taken up by the South Australian Iron Ore Group (SAIOG) to explore for possible concealed economic...
      Document
    • PDF
  • Nilginee Dam. Annual reports to licence expiry/renewal for the period 15/3/1993 to 14/3/1998.

    A low-lying small area situated 40 km west of Whyalla has been explored primarily for economic gypsum occurrences within Recent surficial sediments, while latterly, a search for metallic minerals has also commenced, via a geological survey of basement...
      Document
    • PDF
  • Gilles Downs (part of the Northern Eyre Peninsula Project). First annual report (prior to start of joint reporting status) for the period 8/7/2005 to 7/7/2006: and final report submitted at licence full surrender, for the succeeding period to 30/7/2015.

    A licence area consisting of two separate sub-blocks located on the plains extending to the west of the Middleback Range on north-eastern Eyre Peninsula was taken up to explore for possible economic buried deposits of stratabound magnetite iron ore...
      Document
    • PDF
  • 1
  • 2
  • Next
Download in queue. Do not close this page.

Downloads on our site are currently at full capacity. You are number 0 in the queue. Do not close this page, or you’ll lose your place in the queue. Your download will start automatically as soon as you reach the front of the queue.

Don’t want to wait? Request for a download link to be sent to you

Download started...

Your download will start automatically in a few seconds.

Request delivery

It usually takes us a few business days to deliver your selected downloads to you via an S3 bucket. Please leave your email address and we’ll be in touch when it’s ready.

Request submitted.

We’ll be in touch in the next few business days. Sometimes we can get a large number of requests, but we strive to get back to you quickly. If, after a few days you haven’t received an email, please email us on mesacOpenData@dnrme.qld.gov.au

Made with CKAN 2.9.7(1.79)
Acknowledgement
Copyright
Disclaimer
Privacy
Contact Us
South Australia Government