-
RB 99/00009 Loxton irrigation area. Groundwater modelling of ground water / river interaction.
A combined groundwater and solute transport model (MODFLOW and MT3D) was constructed of the Loxton Irrigation Area to determine the future impacts on groundwater levels and salt loads to the river and floodplain for a range of local irrigation...-
Document
Published: 01 Apr 1999
-
RB 96/00017 River Murray water resource management. Assessment of salt load impacts and drainage hazard for new irrigation development along the River Murray in South Australia.
The Murray-Darling Basin Commission (MDBC) has a commitment in the national interest to managing the health of the River Murray and floodplain environment by mitigating both decreases in river water quality and associated environmental degradation...-
Document
Published: 01 May 1996
-
Data release - as updated [made at SA Director of Mines' discretion] : Olary Project (latterly part of the Lodestone Project). Licence individual annual reports, plus related project joint annual reports, for the period 4/11/2009 to 20/1/2019.
Iluka Resources is exploring for possible economic heavy mineral (HM) deposits that may have formed in the northern Murray Basin, with a strategy of targeting any mineralised Loxton-Parilla Sand formation sediments deposited during the Pliocene marine...-
Document
-
Karoonda and Parrakie. Joint first partial surrender report, for the period 2/9/1986 to 1/9/1987.
The southern portions of both subject licences, comprising ~58.5% of the former area of EL 1356 and ~38% of the former area of EL 1357, have now been relinquished. Preliminary work consisted of collecting 9 surface grab samples of exposures of...-
Document
-
Karoonda and Parrakie. Individual licence progress reports to licences' joint expiry/full surrender, for the period 2/9/1986 to 13/6/1991.
TARGET: Possible economic heavy mineral sand accumulations in Pliocene raised beach strandlines developed along the south-western margin of the Murray Basin. EXPLORATION: Aerial photo interpretation, regional sedimentological studies, preliminary...-
Document
Published: 05 Jun 1991
-
RB 2015/00031 Provenance of zircon in heavy mineral sand deposits, western Murray Basin.
The Murray Basin in south-eastern Australia contains significant economic resources of heavy minerals (ilmenite, zircon, rutile) in coastal strandlines of a prograding sandplain that formed during marine regression in Late Miocene – Early Pliocene...-
Document
Published: 01 May 2016
-
RB 2000/00037 Qualco Sunlands groundwater control scheme - Stage 2: QS9 drilling and well testing completion report.
The contract drilling of three production wells, three combined interflow/production wells, three interflow wells, one observation well and seven drainage wells was carried out by Thompson Drilling Company as part of Stage 2 of the Qualco Sunlands...-
Document
Published: 01 Sep 2000
-
Naracoorte and Bordertown. Combined first annual/final report at licence full surrender, for the period 18/8/1998 to 1/7/1999.
Possible economic buried ilmenite-rutile-zircon heavy mineral sand deposits were targeted along buried Pliocene strandlines of Loxton-Parilla Sand in an area abutting 120 km of the SA-Victoria State Border between Naracoorte and Mount Shaugh....-
Document