-
Verran and Fair View (the Corunna Project). Joint annual reports and final report to licences' joint expiry/full surrender, for the period 29/4/2005 to 28/4/2009.
A search for possible economic North/South Alligator Rivers or McArthur River (NT) style epicratonic, unconformity - related sedimentary uranium deposits was conducted across two licences taken up over areas located west and south of Cleve on central...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Wild Horse Plain. Annual reports for the period 8/7/2005 to 23/2/2019, plus partial surrender reports to 23/2/2021.
An upland area located approximately 100 km south-west of Whyalla on the eastern Eyre Peninsula, and with its eastern boundary running parallel to the coast at a distance of 15 km from Cowell and Franklin Harbour, is being explored for uranium,...-
Document
Published: 11 Jan 1921
-
Yalanda Hill. Annual reports and final report to licence full surrender, for the period 5/12/2005 to 20/3/2014.
Exploration for possible economic deposits of primary uranium mineralisation, undertaken within the subject licence which is centred approximately 90 km south-west of Whyalla, initially consisted of a field reconnaissance using a spectrometer, and...-
Document
-
Sheoak Hill. Annual reports, partial surrender report and final report to licence surrender, for the period 9/7/1997 to 8/7/2002.
An area centred 60 km north-west of Cowell was considered prospective for iron mineralisation within banded iron formations of the Middleback Subgroup, and for skarn - type gold and base metals associated with Hutchison Group metasediments. Following...-
Document
-
Mangalo. Second partial surrender, annual reports for the period 16/4/1997 to 15 April 2001.
Following on from calcrete sampling in the vicinity of Mangalo, reported earlier (Env. 9583), limited field reconnaissance and collection of rock samples was undertaken over selected subtle geological/geophysical anomalies, that had been identified...-
Document
Published: 02 Nov 1901
-
Mount Messenger. Progress reports and final report to licence expiry/full surrender, for the period 27/11/1992 to 26/11/1994.
Lead-zinc exploration undertaken in the vicinity of Mount Messenger, and which also covered an area extending from 5 km to 50 km south-eastwards of Kimba, comprised the acquisition during November 1993 of a 4386.5 line km airborne magnetic /...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-33, central eastern Eyre Peninsula, Ethiopia radiometric target Proterozoic mesothermal / metamorphic basement uranium prospect. Project final report.
Adelaide Resources made application for PACE Initiative Year 4 funding in 2006 (Project DPY4-33) to drill for possible primary uranium mineralisation, following the identification of a spectral anomaly that arose from the reprocessing of radiometric...-
Document