-
Pintari North 1. Test reports.
Contains field contractor's results for the single rate oilproduction flow test plus buildup and static gradient surveys ofthe Namur Sandstone Member oil reservoir, conducted duringFebruary 1988, and the results of vitrinitereflectance and maceral...-
Document
-
1978 seismic survey, Perigundi, final report.
AIM:The 1978 Perigundi Seismic Survey was the fourth modern, digital Vibroseis survey conducted in the Cooper Basin, and was based on similar concepts to the 1973 Mudlankie, 1975 Tooroopie and 1976 Callamurra regional surveys, namely: 1) to further...-
Document
-
Apatite fission track analysis of samples from the western Eromanga Basin and Eringa Trough, Australia.
16 rock samples from wells and outcrop in the western Eromanga Basin / Eringa Trough region were analysed for their apatite grain fission track properties to derive an interpretation of the geothermal history of the enclosing strata.-
Document
-
PEL 50, Eromanga Basin, South Australia. Farm-out brochure and supporting data.
Petroleum Exploration Licence 50 in northern South Australia covers approximately 9714 square km of the prospective Eromanga Basin, in which over 400 million barrels of oil in place have been discovered since 1977. To date, only 3 exploratory wells...-
Document
-
PEL 54. Progress and technical reports for the period June 1991 to June 1993.
Duerden Energy NL contracted Exploration Laboratories Pty Ltd to carry out a soil gas geochemical survey of 1012 line kms between 27/8-11/9/91, to hand sample the near ground surface (< 40 cms depth) soil profile for extractable hydrocarbons in the...-
Document
Published: 16 Jun 1993
-
Petroleum exploration review, PEL 55, Eromanga Basin, South Australia.
This report examines the prospectivity of PEL 55 in considerable detail, in order to construct a dataset suitable for attracting new farminees so that outstanding drilling work on the licence may be progressed. The favourable setting of the licence...-
Document
-
Strzelecki 5. Test reports.
There is no abstract created for this record-
Document
Published: 03 Aug 1988
-
Technical assessment of the petroleum geology and hydrocarbon prospects within PEL 55.
This review of the geological and geophysical data from the PEL 55 area forms a major part of the Year 1 work commitment on the licence, apart from the remaining obligation to carry out reprocessing of 200 line km of seismic. Available reports from...-
Document
-
PEL 55. Technical review reports.
Contains licence prospectivity review reports commissioned by the operator to demonstrate the broad stratigraphic oil source and reservoir potential of the PEL 55 region, thereby confirming and enhancing the hydrocarbon prospectivity of the licence to...-
Document
-
Marree and Mulka Blocks. Reports for the period November 1982 to June 1983.
Contains brief reporting status and budget expenditure comments about active exploration programmes, principally comprised of seismic survey acquisition and processing activities, with examples of newly processed seismic sections.-
Document