-
The MIM-Peko Stuart Shelf Joint Venture Project. Progress reports to licences' joint full surrender and their re-issue as a single replacement tenement, for the period 15/2/1983 to 20/10/1989.
Exploration for Olympic Dam-style Cu-Au-U mineralisation, undertaken over areas to the south-east of Arcoona Homestead and in the vicinity of Woomera township, has comprised numerous reconnaissance and then detailed gravity, ground magnetic and CSAMT...-
Document
-
Emmie Bluff. Progress reports to licence expiry/full surrender, for the period 28/10/1978 to 11/2/1983.
Ongoing exploration for Olympic Dam-style Cu-Au-U mineralisation, over an area centred ~15 km south-east of Arcoona Homestead, during this period comprised 3D geophysical modelling of possible source geometries for, and RC drilling (10 holes, total...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-04, Churchill Dam area iron oxide - associated copper-gold and uranium mineral prospect. Project interim and final reports.
EL 3511 licensee Debnal and its joint venture partner Venture Minerals are exploring an area of the eastern Gawler Craton having a predicted high potential for the discovery of Olympic Dam type iron oxide - associated copper-gold-uranium (IOCG-U)...-
Document
-
Wipipippee Hill. First partial surrender report, for the period 3/5/2012 to 2/5/2016.
Two separate blocks of ground in the centre and the east of EL 4865, together comprising ~43% of the original area of the licence, have now been relinquished. To date, exploration work undertaken generally on the licence has focused on data...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 3 of 4 ].
During the eighth year of tenure, work done on EL 2639 included: - the conduct of infill ground gravity and CSAMT surveys; - geophysical modelling and interpretation of the new survey data; - geological interpretation and refinement of drilling...-
Document
-
Yudnapinna [West]. Combined first annual/final report to licence expiry/full surrender, for the period 22/9/2020 to 21/9/2021.
Two contiguous exploration licences, ELs 6522 and 6523, were secured in the Yudnapinna district to apply new concepts and techniques aimed at revitalising the rate of copper-gold mineral deposit discovery in South Australia. The licences’ area lay...-
Document
Published: 03 Nov 1921
-
Yudnapinna [East]. Combined first annual/final report to licence expiry/full surrender, for the period 22/9/2020 to 21/9/2021.
Two contiguous exploration licences, ELs 6522 and 6523, were secured in the Yudnapinna district to apply new concepts and techniques aimed at revitalising the rate of copper-gold mineral deposit discovery in South Australia. The licences’ area lay...-
Document
Published: 03 Nov 1921
-
Lincoln Gap (part of the Eastern Eyre Peninsula Project). First annual report and final report to licence expiry/full surrender, for the period 30/9/2009 to 29/9/2011.
An area located approximately 20 km south-west of Port Augusta has been explored for possible economic unconformity-hosted uranium at the base of the Pandurra Formation, for copper sulphides near the Beda Volcanics - Pandurra Formation contact, and...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Eucolo Creek (also called the Churchill Dam Project). Annual reports for the period 31/1/2006 to 14/11/2018.
EL 3511 Eucolo Creek, of 528 square km, is situated near the eastern margin of the Gawler Craton within the Olympic Dam Domain, approximately 90 km south-west of the Olympic Dam IOCG-U deposit (3.98 billion tonnes at 1.1% Cu, 0.4 kg/t U3O8 and 0.5 g/t...-
Document
Published: 01 Dec 1918
-
Port Pirie. Progress reports to licence expiry/renewal, for the period 20/4/1977 to 19/4/1979.
Concerted exploration for possible stratiform Mount Gunson type or epithermal Olympic Dam type base metal deposits, on the south-eastern edge of the Stuart Shelf near Port Pirie, was begun by North Broken Hill Ltd in response to the public release by...-
Document
-
Island Lagoon. First partial surrender report at licence expiry/renewal, for the period 23/3/1977 to 22/3/1979.
Tapley Hill Formation - hosted, Zambian Copperbelt style stratabound copper was targeted in an exploration programme which consisted of ground magnetic surveying and stratigraphic percussion drilling and geophysical logging (10 holes for 2058 m total...-
Document
-
Reedy Lagoon. Progress reports and final report to licence expiry/full surrender, for the period 12/1/1981 to 11/1/1983.
Exploration for Olympic Dam style mineralisation included ground magnetic and gravity surveys carried out east of Mount Vivian. Diamond drilling of one hole to 674.6 m total depth intersected minor pyrite and possibly trace of chalcopyrite at the base...-
Document
-
Island Lagoon. Progress reports and final report to licence full surrender, for the period 8/12/1980 to 14/9/1982.
Exploration over the now surrendered ground, which had been successively incorporated within ELs 301, 513 and 769, was initially directed at a search for stratabound base metal deposits which might exist within the flat-lying Neoproterozoic and...-
Document