-
Woomera, Portulacca Ridge and Red Lake. Joint final report at licences' joint full surrender, for the period 15/2/1983 to 7/11/1986.
The three licences now being surrendered were originally taken out by Seltrust in the mid-1970s to search for stratabound base metals and Olympic Dam type mineralisation. After Seltrust withdrew from the subsequently formed Stuart Shelf joint venture...-
Document
-
RB 92/00037 Review of mineral exploration, KINGOONYA 1:250 000 map area.
This report was prepared as a summary of all open file mineral exploration data from the KINGOONYA 1:250000 mapsheet area that are held in the SADME records management Envelope system. The aim of the holdings review was to describe past exploration,...-
Document
Published: 29 Nov 1991
-
South Vivian [Homestead]. Annual reports and final report to licence expiry/full surrender, for the period 12/6/2007 to 11/6/2009.
An area located on the northern Stuart Shelf between Olympic Dam and Prominent Hill, approx. 50 km south-southwest of the latter, has been explored for possible Olympic Dam type iron oxide - associated copper-gold (IOCG) deposits and for Canadian...-
Document
Published: 17 Oct 1909
-
Coondambo. Second partial surrender report, for the period 7/6/2001 to 6/6/2009.
As part of a search for possible buried economic Olympic Dam type IOCG-U deposits in volcanic basement, or for stratiform Athabasca Basin type uranium occurrences in the overlying cover, farminee Marathon Resources carried out detailed calcrete...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 1 partnership no. DPY1-12, Chianti mineral prospect. Project final report.
The subject report describes the results of drilling two fully cored rotary holes totalling 1161.10 m at the Chianti prospect, an unusually-shaped residual gravity anomaly located in Gunson Resources' EL 3264, 20 km north-east of the Mount Gunson...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-13, evaluation of the Marathon South mineral occurrence. Project interim and final reports.
Following further detailed ground gravity surveying and data processing carried out to better understand the gravity response of relatively dense and weakly magnetic basement rocks at the Marathon South prospect, located within EL 3209 and lying...-
Document
Published: 10 May 1906
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-04, Churchill Dam area iron oxide - associated copper-gold and uranium mineral prospect. Project interim and final reports.
EL 3511 licensee Debnal and its joint venture partner Venture Minerals are exploring an area of the eastern Gawler Craton having a predicted high potential for the discovery of Olympic Dam type iron oxide - associated copper-gold-uranium (IOCG-U)...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-56, northern Olympic Domain: Sloane Hill silver and IOCG mineral prospect. Project final report.
A PACE Initiative Year 4 subsidised drilling project carried out on Mount Eba Station, in an area located approximately 30 km south of the Prominent Hill mine, initially targeted a wide above background silver geochemical anomaly returned by sampling...-
Document
Published: 18 Dec 1907
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 4 partnership no. DPY4-65, Chianti mineral prospect. Project completion dataset.
The subject set of reports describes the results of PACE Initiative Year 4 partly-subsidised drilling work conducted in the vicinity of the Chianti prospect, which lies approx. 20 km north of the old Mount Gunson mining camp. The aim of this work,...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-07 - northern Gawler Craton - Welbourn Hill and Nicholson Hill magnetic/gravity anomalies IOCG-U mineral prospects. Project final report.
As part of a search for possible high crustal level, Olympic Dam - type IOCG deposits hosted by Mesoproterozoic basement rocks, Eromanga Uranium undertook deep diamond drill testing of two large, semi-coincident magnetic/gravity anomalies recognised...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Hawks Nest. Annual reports to licence expiry/renewal, for the period 12/3/1999 to 11/3/2004.
An area comprising two separate sub-blocks centred ~115 km south-southeast of Coober Pedy and located to the west of the Stuart Highway is being explored for Archaean to Palaeoproterozoic banded iron formation iron ore mineralisation of economic...-
Document
Published: 05 Feb 1904
-
The Lake Torrens Project; plus the Olympic Domain Project. Joint annual reports for the period 1/1/2006 to 31/12/2010.
Licensee Copper Range originally took up a group of three tenements located in central South Australia covering areas within and west of Lake Torrens, with the intent, much reinforced following the Carrapateena deposit discovery made in 2005, of...-
Document
Published: 04 Mar 1911
-
Data release - as updated [made at SA Director of Mines’ discretion] : Oak Dam North-east. Annual reports for the period 18/1/2006 to 17/1/2011.
A relatively large but little-explored area of the central-eastern Stuart Shelf, which is almost wholly covered by scrubby sand dunes and swampy salt lakes, thereby making surface access very difficult despite it being located only ~30 km to 50 km km...-
Document
Published: 16 Mar 1911
-
Kingoonya. Annual reports and final report to licence full surrender, for the period 27/11/2006 to 21/4/2015.
An area surrounding the township of Kingoonya and straddling the Trans Australia Railway line, that comprises six tenement sub-blocks,has been explored for possible economic occurrences of buried Tertiary roll-front style secondary uranium...-
Document
Published: 23 Apr 1915
-
Data release - as updated [made at SA Director of Mines' discretion] : Wartaka, Iron Knob, Reid Lookout and Old Wartaka (the Parkinson Dam Project). Annual reports and joint annual reports for the period 17/2/2005 to 26/4/2019.
Four small, adjacent licences located on the south-eastern, shallow subcrop margin of the Gawler Ranges, which together make up an area centred about 25 km north-east of Lake Gilles and 60 km west of Port Augusta, are being explored for possible...-
Document
Published: 30 Apr 1918
-
Data release : Yeltacowie, Pernatty [Station] and Whittata (the Punt Hill IOCG Project). Joint annual reports, plus final report to expiry of EL 5774 Punt Hill, for the period 7/1/2012 to 6/1/2017.
During the eighth, 2012-2013 year of tenure of the Pernatty EL area, now being explored in concert with two other adjoining Punt Hill IOCG Project licences, Monax reviewed its past drillhole data, undertook further processing of the project's amassed...-
Document
Published: 29 Aug 1917
-
Mount Gunson and Mount Moseley (part of the Mount Gunson JV Project). Partial surrender reports, for the overall tenure period 15/7/1994 to 25/5/2021.
No exploration work has been undertaken on either of the recently relinquished portions of the two subject licences. Within the JV project tenements, exploration targets being addressed are: (1) possible economic buried IOCG (iron oxide-associated...-
Document
Published: 17 Oct 1918
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 4 of 4 ].
During licence Year 12, following encouraging results made by its continuing exploratory drilling, Gunson Resources was able to negotiate a joint venture over the Mount Gunson Project tenements with Falconbridge Limited through its subsidiary Noranda...-
Document
-
Data release - as updated : Woordlemmie. Annual reports to licence full surrender, for the period 22/6/2011 to 22/11/2019.
An area situated a short distance to the east and south-east of CSR's historic Mount Gunson open cut copper workings, covering ground adjacent to the south-western and southern margins of Pernatty Lagoon, has been explored for possible buried economic...-
Document
Published: 26 Nov 1919
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 3 of 4 ].
During the eighth year of tenure, work done on EL 2639 included: - the conduct of infill ground gravity and CSAMT surveys; - geophysical modelling and interpretation of the new survey data; - geological interpretation and refinement of drilling...-
Document