-
The Peake and Denison Project. Project joint annual reports and respective final reports at licences' expiry/full surrender, for the period 1/1/2000 to 20/9/2009. [Index Part 1 of 2].
[ Note - here is only Part 1 of an abstract relating to 2 separately indexed parts ]. Exploration carried out over the Peake and Denison Inliers by the joint venturers since mid-2000 has targeted possible large-scale Proterozoic ironstone-hosted...-
Document
Published: 15 Oct 1909
-
Data release - as updated : Edward Creek (part of the Edward Creek Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 23/9/2008 to 11/11/2018.
Reedy Lagoon Corp. (RLC) has continued to look for minerals other than diamond, operating as the manager of exploration work for base metals (mainly copper) and uranium that was undertaken by the Edward Creek Base Metal Joint Venture (“ECBMJV”) during...-
Document
-
Peake-Denison Ranges. Progress and final reports for the period 5/5/1975 to 5/11/1975.
Geochemical sampling was not encouraging for either gold or stratiform copper.-
Document
Published: 01 Jan 1975
-
Mount Carulina and Trapeze Hill (the Oodnadatta Project). Joint annual reports plus succeeding single licence annual reports to licence expiry/full surrender, for the period 6/3/1995 to 12/10/2009. [ Index Part 1 of 2 ].
[ Note - here is Part 1 of the abstract relating to 2 separately indexed parts ]. As an adjunct to its widespread search for possible diamondiferous kimberlite diatremes on its Abminga Project acreage situated nearby to the north-west, Caldera...-
Document
Published: 09 Feb 1910
-
Mount Kingston. Progress reports and final report to licence expiry/full surrender, for the period 10/10/1979 to 26/4/1984.
Diamond exploration undertaken over an area situated 70 km south-east of Oodnadatta included photogeological studies, the acquisition of a 2400 line km low level aerial magnetic and radiometric survey, and geochemical analyses of 452 reconnaissance...-
Document
-
Mount Denison. Progress reports and final report to licence full surrender, for the period 13/5/1991 to 22/3/1993.
Possible economic epithermal/hydrothermal uranium and base metal deposits hosted by Early to Middle Proterozoic meta-igneous and metasedimentary basement rocks in the northern Peake and Denison Ranges were the primary targets addressed by CRA in their...-
Document
-
Mount Charles. Progress reports and final report to licence full surrender, for the period 9/12/1991 to 26/10/1992.
Possible economic epithermal/hydrothermal uranium and base metal deposits, hosted by Early to Middle Proterozoic meta-igneous and metasedimentary basement rocks partly concealed by Mesozoic and Cainozoic cover in the north-eastern Peake and Denison...-
Document
Published: 13 Nov 1992
-
West Lake Eyre. First progress report plus final report to licence full surrender, for the period 25/1/1980 to 13/6/1980.
Dampier Mining's main objective in taking out this licence was to test a large magnetic complex, situated east of the Peake and Denison Ranges and west of Lake Eyre, for possible economic buried base and precious metal deposits. Grid-based ground...-
Document
-
Algebuckina. Progress, annual and final reports to licence surrender for the period 4/4/1979 to 3/10/1980.
Four photo-interpreted possible buried kimberlite structural targets that were indicated in the Algebuckina area were investigated by a field programme of drainage and soil geochemical sampling (39 samples) and scintillometric surveying. Three areas...-
Document
-
Nilpinna Spring. Progress reports and final report to licence expiry/full surrender, for the period 12/7/1982 to 11/1/1985.
As the start of a regional diamond exploration programme with secondary base metal objectives, portion of a detailed low-level airborne magnetic/radiometric survey was flown over the Nilpinna Spring area to define targets for drilling. Field...-
Document
-
Peake Creek and Mount Margaret - Nilpinna areas (northern and central Peake and Denison Ranges). Progress reports and combined final report, plus additional data submitted prior to licence full surrender, for the period 1/10/1966 to 31/1/1969.
Regional geochemical surveys have been conducted by North Broken Hill over 490 square miles covering the northern and central Peake and Denison Ranges, within two new exploration licences which the company took up in 1966 after a private prospector...-
Document
Published: 04 Nov 1968
-
Lagoon Hill. Progress and final reports to licence surrender for the period 2/11/1972 to 1/11/1973.
Exploration for possible roll-front sedimentary uranium deposits developed in porous and arenaceous Upper Jurassic to Lower Cretaceous sediments of the Algebuckina Sandstone and Cadna-owie Formation, where these onlap likely uranium-providing...-
Document
Published: 08 Apr 1974