-
Permit EPP 26 - Duntroon Basin. Surrender report.
This EPP 26 surrender report has been furnished to the SA offshore Designated Authority as a result of the application made on 21/8/96 by BHP Petroleum for permission for the joint venture to surrender the permit, before committing to unwanted...-
Document
Published: 19 Feb 1997
-
Proposal to relinquish permit EPP 21, South Australia.
A complete re-evaluation of all known prospects and leads within EPP 21 was undertaken by the permittees in order to define any prospects worthy of drilling in permit Year 4, ending 28 June 1986, by which time a commitment to drill one well and...-
Document
-
Great Australian Bight Basin, offshore South Australia.
EPPs 10 and 11 currently comprise 239 graticular blocks (approximately 17 000 sq km) in the Great Australian Bight Basin. No wells have yet been drilled in these permits which lie entirely in water depths greater than 200 m and ranging down to 1 500...-
Document
-
1976 marine seismic survey, R 10, operations, interpretation and final reports. Eucla and Bight Basins and Ceduna Terrace EPP 10 and EPP 11.
Three structural closures have been defined by the R 10 survey. These are Galah in Permit SA-11 and Kookaburra West and Kookaburra East in Permit SA-10. Economic evaluation of the structures is currently being undertaken, but it is considered in the...-
Document
-
1992 marine seismic survey, DH92, final report.
AIM: To confirm a number of prospects and leads outlined with the most recent interpretation of the existing seismic data over both permit areas. Due to the presence of shallow intrusives and difficulty in mapping the basement in certain areas,...-
Document
-
Greenly 001 EPP 26. Basic well completion report.
Greenly 1 wildcat was located in the southern part of EPP 26, approximately 10 km southeast of Platypus 1, 40 km west-northwest of Duntroon 1, and 150 km southwest of Port Lincoln. It was directionally drilled over the period 4 June to 14 August 1993...-
Document